• Title/Summary/Keyword: 해체폐기물

Search Result 377, Processing Time 0.045 seconds

The Analysis and Forecasting of the Demolition Market for the Development of Demolition Industry. (해체산업발전을 위한 해체시장분석 및 예측)

  • Kim, Chang-Hak;Lee, Kyoung-Hee;Kim, Hyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.824-827
    • /
    • 2008
  • Currently, major interested thing at home and abroad is to pursuit a sustaining development of an environmental construction industry through low discharge of carbon dioxide and reuse of construction waste and so on. In order to achieve those goals, we must develop the design technique which can reduce a generated amount of C&D waste from a design phase and technique which can reduce and recycle C&D waste generated at a demolition phase. But a domestic policy for the development and the support of a demolition industry is analyzed to be more insufficient than other advanced country. Therefore, this study analyzed a demolition market trend of foreign country and assessed properties of a domestic demolition industry. Also this study forecasted a scale of a demolition market and analyzed its trend based on total number of housing construction per year. Consequently, this study suggested the development direction of a demolition industry through those analyzed results, expecting the research results to be a fundamental data for the development of demolition industry and the policy of construction waste.

  • PDF

The Assessment and Reduction Plan of Radiation Exposure During Decommissioning of the Steam Generator in Kori Unit 1 (고리1호기 증기발생기 제염해체 시 작업자 피폭선량 평가 및 저감화 방안)

  • Son, Young Jik;Park, Sang June;Byon, Jihyang;Ahn, Seokyoung
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.16 no.3
    • /
    • pp.377-387
    • /
    • 2018
  • Korea's first commercial nuclear power plant, Kori Unit 1, was permanently shut down on June 18, 2017, after 40 years of successful operation. Kori Unit 1 plans to construct a waste treatment facility in the turbine building prior to commencement of dismantling in earnest. Various radioactive wastes are decontaminated, disassembled, cut and melted in the waste treatment facility and sent to the radioactive waste repository. The proportion of metal radioactive waste in dismantled waste is about 70%, of which large metal radioactive waste is mainly generated in the primary circuit and has high radioactivity, so radiation exposure must be managed during disassembly. In this study, the steam generators are selected as large metal radioactive waste, the exposure doses of the dismantling workers are calculated using RESRAD-RECYCLE code and the methods for reducing the exposure doses are suggested.

Development of the Database System for Managing Decommissioning Information from Research Reactor (연구로 해체정보 관리를 위한 데이터베이스 시스템 개발)

  • 정관성;이동규;박희성;이근우;오원진
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2004.06a
    • /
    • pp.58-71
    • /
    • 2004
  • Korea Research Reactor (KRR) 1&2 has shut down and through preparatory activities, its decommissioning activities are underway. As its decommissioning activities have been done over several years, its relevant data have been spreaded with various type and media all over the discrete place and inadvertently managed, As a result, managing and assessing data of KRR 1&2 has been difficult and complex and its data cannot be evaluated. By developing the decommissioning database system of KRR 1&2 the data of decommissioning activities can be correctly evaluated, being systematically managed and objectively assessed. Finally, the decommissioning project of KRR 1&2 have come to more effectively accomplished. As the data of decommissioning activities can be at last systematically analyzed and objectively assessed, the decommissioning project of KRR 1&2 would be more effectively accomplished.

  • PDF

A Analysis of Generated Construction Waste and Dismantlement Method by Field Investigation (분별해체 현장조사에 의한 건설폐기물 발생량 및 공정 분석)

  • Lee, Jong-Chan;Song, Tae-Hyeob
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.4 no.1
    • /
    • pp.101-109
    • /
    • 2009
  • This CW(Construction wastes) are increasing as construction industry is growing, so many countries make efforts to recycle CW. Korea also made a stipulation for recycling CW. But the main content of this stipulation is for using recycled aggregates. Advanced countries try to increase reuse rate of not only recycled aggregate but also other kinds of wastes. So they are adopting SDM(separating dismantlement) method and we are also planning to make the system for SDM. This study is about SDM analysis through construction field investigation and difference analysis between SDM and UDM comparing predictive amount by UDM with real generated amount by SDM. First, the generated amount of construction wastes by SDM is more than estimated amount by UDM, and mixed waste was specially reduced more than UDM. The warehouse is easier than the office building to applicate SDM. But still there is no manual for SDM in the site, so establishment of SDM is demanded.

  • PDF

A Study on the Method of Cost Estimation for the Decommissioning Plan by the Analysis of Domestic Cyclotron Dismantling Practices (국내 사이클로트론 해체 사례 분석을 통한 해체 계획 비용 산정 방법 연구)

  • Woo, Rina;Kim, Yongmin
    • Journal of the Korean Society of Radiology
    • /
    • v.8 no.3
    • /
    • pp.97-103
    • /
    • 2014
  • Decommission of medical cyclotron give rise to a lot of low-level radioactive waste and costs. Decommissioning cost should be reasonably calculated according to the decommissioning activities and installed components of facilities. In this paper, we investigated the experience on the cyclotron relocation from SNUH(Seoul National University Hospital) to SKKU(Sungkyunkwan University) and analyzed radioactive waste management costs by applying the disposal scenarios. Also considerations for decommissioning cost estimation are reviewed. The results could be utilized as a basic data for establishment on the methodology of decommissioning cost estimation and evaluation.

The Comparison and Analysis of Waste Quantity through a Case Study of Demolition Works (해체공사의 사례분석을 통한 폐기물 발생량 비교분석)

  • Kim, Chang-Hak;Lee, Kyoung-Hee;Kim, Hyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.131-139
    • /
    • 2008
  • Now, one of the greatest concerns at home and abroad is eco-friendly construction. Above all, the reduce and recycle of the construction waste may be one of the most important things. The construction waste has been produced most at demolition phase, but the research into that area has not being to make nearly within the country. Recently, as the government have realized the importance of that area, they are making research to improve traditional demolition methods. Also, they are preparing to make a raw to enforce deconstruction during demolition phase. This research has analyzed the problems and waste types which produced during the demolition works by surveying in site. Until now, in the interior, the right quantity basis has not been suggested, because of the absence of any methods to estimate it accurately. Therefore, this study has compared and analyzed owner's ordering quantity, drawing analysis quantity with measuring the waste to produced at site during demolition works, this research results are expected to be the important materials for future research into the construction waste area.

Development of Integrated Computer System for Quantifying and Managing of Demolition Waste (해체폐기량 산정 및 통합관리를 위한 시스템 개발)

  • Kim, Chang-Hak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.133-140
    • /
    • 2011
  • Recently, the demolition industry is becoming more important than ever for formulating reuse and recycling of a construction waste with the current trend in pursuing a sustainable development. As considering the situation of a domestic housing construction and an existing house, a scale of a demolition market is expected to increase continually. Therefore, for a sustainable development, it is needed to forecast and manage rightly the demolition waste producted in a demolition phase. But, because most of a demolition company is very small and the investment in a technology development is not enough, the effort to develope a system and to make a standard for managing righly a demolition waste is also not sufficient. Therefore, this study develops a system to automatize quantifying a demolition waste. This system makes it possible to manage the planning of demolition works and the quantifying, disposal, reusing and recycling of a demolition waste in one system by integrating all the activities related with demolition works. 3D drawings of each element for demolition works will manage by being linked to its schedule for visualizing 3D object. Also, this study presents methods for quantifying easily a demolition waste by using 3D object.