• Title/Summary/Keyword: 해체계획서

Search Result 4, Processing Time 0.021 seconds

Review for Items of Decommissioning Plan and Standard Review Plan (해체계획서 및 심사지침서 항목에 관한 고찰)

  • Kim H. S.;Son J. K.;Park K. R.;Kang K. D.;Kim K. D.;Ha J. H.;Jeong C. W.
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2005.06a
    • /
    • pp.40-48
    • /
    • 2005
  • The licensees are to submit the decommissioning plan to regulatory body to decommission nuclear facilities. The standard review plan(SRP) of decommissioning is used to confirm and evaluate the decommissioning plan by the related regulations and standards. The licensees who want to decommission the nuclear facilities are required to submit the decommissioning plan according to Acts 31 of Atomic Energy Law. In this study, the items of reports and documents submitting to regulatory body were reviewed deliberately, and finally the major sub-items of decommissioning plan were established.

  • PDF

Development of the draft guidelines of the decommissioning plan for a nuclear power plant in Korea (국내 원자로시설 해체계획서 세부 작성지침(안) 개발)

  • Lee, Jungmin;Moon, Joohyun
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.11 no.3
    • /
    • pp.213-227
    • /
    • 2013
  • It is essential to prepare the decommissioning plan for a nuclear power plant (NPP) for the safe decommissioning of the NPP, minimization of the generation of decommissioning wastes, and protection of human beings and environment. Although Kori unit 1 and Wolsong unit 1 will be destined to their decommissioning in Korea in the near future. there is no provisons about preparing the decommissioning plan. In this paper, therefore, the draft guidelines of the decommissioning plan for a NPP were developed by considering the domestic situation, based on the comparative analyses of the regulatory guidelines of the decommissioning plan in U.S., U.K. and France. The draft guidelines are expected to play an important role to modify the domestic laws and regulations on the decommissioning of the NPP, and to give a license holder in charge of decommissioning the detailed instructions for preparing it in advance.

Preparation of Radiological Environmental Impact Assessment for the Decommissioning of Nuclear Power Plant in Korea (국내 원전 해체시 방사선환경영향평가 방안)

  • Lee, Sang-Ho;Seo, Hyung-Woo;Kim, Chang-Lak
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.16 no.1
    • /
    • pp.107-122
    • /
    • 2018
  • Kori unit 1, the oldest commercial nuclear power plant in South Korea, was permanently shut down in June 2017. There are a lot of things to consider in decommissioning nuclear power plants, and one of them is the radiological environmental impact assessment. Performed to promote the health and safety of residents around the nuclear power plant, radiological environmental impact assessment aims to confirm that off-site radiological dose from radioactive material released from the facility does not exceed the regulatory criteria. There are three main parts of environmental impact assessment: pre-decommissioning environmental monitoring, environmental monitoring during decommissioning, and impact on nearby residents. At present, although the Korea Nuclear Safety Act stipulates that radiological environmental impact assessment resulting from decommissioning should be carried out, the details have not been specified. Therefore, this paper compares and analyzes guidelines for evaluation of radiological environmental impacts of nuclear power plants overseas, and presents a draft on the assessment of radiological dose resulting from decommissioning according to the Korean situation.

Evaluation of Residual Radiation and Radioactivity Level of TRIGA Mark-II, III Research Reactor Facilities for Safe Decommissioning (TRIGA Mark-II, III 연구로 시절의 폐로를 위한 시설의 잔류 방사선/능 평가)

  • Lee, B.J.;Chang, S.Y.;Park, S.K.;Jung, W.S.;Jung, K.J.
    • Journal of Radiation Protection and Research
    • /
    • v.24 no.2
    • /
    • pp.109-120
    • /
    • 1999
  • Residual radiation and radioactivity level in TRIGA Mark-II, III research reactors and facilities at the KAERI Seoul site, which are to be decommissioned, have been measured, analyzed and evaluated to know the current status of radiation and radioactivity level and to establish and to provide the technical requirements for the safe decommissioning of the facilities which shall be applied in minimizing the radiation exposure for workers and in preventing the release of the radioactive materials to the environment. Radiation dose rate and surface radioactivity contamination level on the experimental equipments, floors, walls of the facilities, and the surface of the activated materials within the reactor pool structure were measured and evaluated. Radioactivity and radionuclides in the pool and cooling water were also analyzed. In case of the activated reactor pool structures which are very difficult to measure the radiation and radioactivity level, a computer code Fispin was additionally used for estimation of the residual radioactivity and radionuclides. The radiation and radioactivity data obtained in this study were effectively used as basic data for decontamination and dismantling plan for safe decommissioning of TRIGA Mark-II, III facilities.

  • PDF