• Title/Summary/Keyword: 해외 CM사업

Search Result 29, Processing Time 0.021 seconds

A Study on the Investigation into Obstacles in Overseas CM Projects (해외 CM사업의 애로요인 분석에 관한 연구)

  • Kim, Jae-Hee;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.113-121
    • /
    • 2013
  • An expansion into the global market increasingly becomes a buzz world among Construction Management(CM) firms in Korea. The objective of this study is to identify potential obstacles and investigate their nature and implications to CM firms in Korea. The study identified 25 obstacles under 5 categories. Base on a questionnaire survey and interviews with CM experts who have global CM projects experience, the study discusses that while there exist various types of obstacles, a more attention needs to be paid for a small number of major obstacles to minimine risks in overseas CM projects. It also suggests that improving pre-construction management competency through securing CM experts should be listed as a top agenda for Korean CM firms.

CM Prospects and Strategies Based on Contract Statistics : 1997 through 2014 (CM산업 수주실적 분석을 통한 CM기업의 발전 방안 - 1997년 ~ 2014년 실적자료 기반 -)

  • Ha, Jiwon;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.97-107
    • /
    • 2016
  • CM services have been focused on the advancement of the CM industry and expansion to overseas market based on CM capabilities. However, there has been lack of quantitative and comprehensive research to investigate current CM trends and prospects for improving competitiveness. In this sense, the purpose of this study is to statistically analyze total of 3,453 CM service contracts over the past 18 years (between 1997 and 2014) in term of market type, contract size, owner's type, commodity type. Finding of this research reveal that 1) compared to 2005, CM market size in 2015 increased as much as 2.5 times, and that 2) domestic CM projects count for 87.5%, architectural project 88.4%, less than 1 billion won small contracts 75%, respectively. Also, recently as CM company are developing capability and competitiveness, 1) overseas CM market share has grown up to 20% among total CM contract amount, and 2) CM contracts by private owners has increased 3 times demanding the total management services based on high technical capability. Additionally, the result of this paper supports the growth path model proposed by Jung et al. (2014), where a path from Domestic Public (DP3) and Domestic Private (DC2) CM projects towards the expansion to International Private (IC5) contracts was quantitatively analyzed. Implications for other practical issues are also briefly discussed.

Policies and Tasks for Improving Korean CM Industry (CM 산업 발전을 위한 정책 및 과제 추진 방안)

  • Kang, Seunghee;Jung, Youngsoo;Kim, Namjoon;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.71-81
    • /
    • 2014
  • As domestic construction investment has been gradually reduced, the issue of expanding overseas CM market has increased. Strengthening CM capability from the view point of project life-cycle is required in overseas CM market. However, current regulations institutionally force public CM services to focus on the construction phase. Therefore, Korean CM firms can hardly have the opportunities for accumulating technical competitiveness especially for pre-construction phase. Result of this study shows that the total efforts in terms of man-hours for the construction phase is found to be more than 78 percent in domestic public CM projects. In this context, this study proposes the policies and tasks for improving 'rigid man-hour placement', 'unreasonable CM fee standards', 'CM firm selection method', 'unreasonable business scope decision', and 'evaluation of owner's project management capability' in order to improve domestic CM Industry as well as to expand overseas CM market successfully.

The Analysis of the Weights of Country Risk by Participants of Overseas Construction Projects (건설사업 참여주체 별 해외건설공사 국가리스크 핵심요인 도출 및 비교분석)

  • An, Byung-Ho;Kim, Jin-Eon;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.150-159
    • /
    • 2013
  • The government has focused on activation of overseas construction projects and strengthening competitiveness in the long term. In recent years Public construction contract as well as design, engineering, construction management(CM) are gradually expanding into other countries, but risk analysis cases in the field are slight. In this study, We utilized PI scale and drew a conclusion about the importance of overseas risk by participants. We compared its features from the risk factor based on Risk Matrix. As a result of this study total of 6 section 31 Country Risk factors for the importance of overseas risk by participants were drawn, and the key risk factors (17 constructor, 14 designers, 17 CMr) based on Risk Matrix were derived. By utilizing the result of this study will be used as the basic data for establishing risk management strategy to meet each business and planning evaluation model.

Policy Evaluation and Improvement Plan of Overseas Construction Engineering Industry (해외 건설엔지니어링산업의 정책평가 및 개선방안)

  • Park, Hwan-Pyo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.375-384
    • /
    • 2018
  • Due to the downturn in the local construction business, entry into the overseas markets has been regarded as one of the core tasks of the building sector and the government. Thus, entry into overseas markets, not only by large and middle-standing enterprises, but also by small and medium sized enterprises, has recently become a major construction policy. Therefore, this study identified and evaluated overseas construction support policies in the field of construction engineering, ranked them as the policies for developing market development funds, fostering and educating expert workers, and supporting the provision of information on winning orders. Through these policy assessment results, the study proposed improvement measures from the government and from the business side. As for the government viewpoint, a measure of providing information suited to engineers in design companies, project manager (PM), construction manager (CM), a measure of producing skillful workers through the expansion of education support policies, and the promotion of specialized overseas workforce in the construction engineering sector were proposed. In the construction engineering industry, this study suggested measures for securing global expert manpower, sharing performance of overseas construction market development project, strengthening construction project management capacity, and strengthening risk management.

Evaluation of CM Capability based on Business Functions for International Plant Construction (해외 플랜트 건설사업관리 업무기능별 역량분석)

  • Ha, Jiwon;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.3-15
    • /
    • 2014
  • Ever expanding overseas construction is one of the most important issues for Korean construction companies. Among these issues, strategies for overseas plant construction have widely been discussed, because the plant construction has features of low competitiveness and high ripple effects when compared with other construction sectors. In this sense, the purpose of this research is to evaluate the CM capability of Korean construction industry for overseas plant construction. Fourteen construction business functions and four techniques were defined first. Based on these functions and techniques, CM capability was quantified for As-Is (2013), To-Be (2018) and Gap analyses. Findings of this research reveal that 1) capability for construction is quite competent, 2) capabilities for planning, design management, contracting, and risk management are found to be relatively low, where higher value can be added. In addition, it is found that R&D needs to be extended to develop systemized management techniques. It is also required to secure specialists and original technologies at national industrial level.

Best Practice in CM Application: Muju Waterways Flood Recovery CM Case (CM 적용 모범선행사례: 무주군 지방하천 1,2급 수해복구 공사)

  • Yu Jae-Hee;Choi Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.27-31
    • /
    • 2003
  • 최근 해외시장에서는 Single Point Responsibility 개념의 선호와 프로세스사업관리능력의 중요성으로 건설사업관리 (Construction Management: 이하 CM)방식이 프로젝트 조달의 중요한 방안으로 사용되며 국내에서도 최근 CM 발주량의 획기적인 증가추세로 사업수행능력 향상을 위한 도구 개발이 절실하다. 가장 유용한 도구로는 국내${\cdot}$외 CM 수행사례 분석을 통해 이에 저해되는 요인과 모범사례 등을 파악하여 산업계로 하여금 체계적 점검과 벤치마킹을 통해 수행능력을 제고할 수 있는 핵심성공요인과 Best Practice의 보급 발간이다. 따라서 본 논문은 최근 감사원에 의해 모범선행사례로 선정된 무주 하천 1,2급 수해복구 건설사업관리 용역에 대한 CM성과를 분석하여 핵심성공요인과 Best Practice를 제공하는 것을 주요 목표로 한다. 본 CM용역에서는 무엇보다도 무주군내 수해복구공사에 CM 사업방식을 도입한 것은 현명하고 진취적이며 시기 적절한 일이라고 판단되며 이러한 선도적 기자체의 의욕적인 시도가 지방에서 수행되는 공공공사의 수준을 한 차원 높이는 계기가 됨은 물론 항구적인 복구공사기법의 하나로 정착하기를 기대한다. 또한 산업계는 CM관련 중심기관을 통하여 이러한 모범사례의 연속적인 분석과 보급을 통해 산업계 전반적인 CM수준을, 제고하여 국내외 CM확대 적용의 기반을 조속히 조성할 수 있기를 바란다.

  • PDF