• Title/Summary/Keyword: 해외 건설시장

Search Result 277, Processing Time 0.025 seconds

Establishment of Critical Work Models through the Evaluation of Technology Competitiveness (산업설비 기술수준 평가를 통한 주요업무 도출 및 모델 구축방안 연구)

  • Park Su-Hyun;Ha Seung-Ho;Kim Kyong-Min;Park Chan-Hyuk;Kim Kyong Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.526-530
    • /
    • 2004
  • The portion of plant industry has increased within construction market. In spite of plant industry is dynamic field which leads state-of-the-art and creates a value, phased information management and knowledge intensive business accomplishment are insufficient. Henceforth plant is expected to demand increment of industrial project from hereafter international plant industry market. The continuous plan technique and know-how accumulation are urgent from domestic. 1'his research analyzes the areas in which domestic plant industry is insufficient and then elicits project management key success factors from current operation process. In addition, this research compares domestic plant level with overseas plant level. This study establishes work models for critical work phases based on the analysis of domestic plant technical level.

  • PDF

A Strategy on Integrated Data Base Construction and Management of Global Water Resource Information System (글로벌 수자원 정보 시스템 통합 DB 구축 및 관리방안 연구)

  • Gwon, Yong Hyeon;Lee, Kyoung Do;Lee, Byong Ju
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.375-375
    • /
    • 2018
  • 세계 수자원 시장은 연평균 6.5%씩 증가하고 있으며, 2025년 기준 1,038조원까지 급성장할 것으로 전문가들은 예상하고 있으나, 기후변화의 가속화로 인해 가뭄 및 홍수피해가 증가하여 수자원 관리가 더욱 어려워져지고 있다. 급속도로 변화는 환경에 대비하기 위해 국내에서는 수자원 및 기후변화에 대한 다양한 연구가 진행되고 있으나, 해외사업 진출 시에는 수자원 기초자료 수집에 대한 어려움을 겪고 있다. 이를 해결하기 위해 글로벌 수문기상자료 제공과 함께 GIS정보, 댐 및 저수지 관련 자료, 인문사회 자료, 물관련 통계자료, 물관련 재해자료 등을 웹으로 제공하는 글로벌 수자원 정보 시스템(GWB, Global World Bank)을 개발하고자 한다. 본 연구에서는 시스템의 통합 DB를 구축하고 관리방안을 도출하기 위해 수집된 메타데이터 속성 및 데이터구조를 파악하고, 세부항목별 자료 포맷을 분석 후 GIS기반 관측소 정보와 자료를 매칭하여 최종적으로 시스템 컨텐츠별로 DB를 맵핑하였다. 강수량과 기상자료는 33개국의 관측소 6,531개소의 일/월/연단위 관측자료와 10,977격자의 격자분석자료를 구축하였다. 수문자료는 33개국의 수문관측소 2,242개의 월/연단위 유량관측자료와 10,977격자의 월/연단위 직접유출, 기저유출, 잠재증발산의 격자분석자료를 구축하였다. 그리고, 수집된 강우와 기상자료는 기계 오작동, 자료 전송 오류 등으로 인한 결측치 및 이상치에 대해 자료품질분석을 통해 오자료에 대한 보정을 진행하였다. 해당자료는 MySQL를 활용하여 DB를 구축하였으며, GIS정보는 GeoServer를 활용하여 운영서버에 구축된 정보를 최종적으로 사용자에게 Web Browser로 표출하였다. 해당 시스템은 추후 전지구 수자원관련 정보를 제공하여 해외사업지역의 댐이나 보 등의 구조물 설계, 수자원산업의 해외 진출시 데이터 수집의 한계점 및 시간단축을 해결할 수 있어 수자원 분야에 기여 할 수 있을 것으로 판단된다.

  • PDF

An Analysis of Forwarding Companies' Efficiency handling Overseas Construction Project Logistics using DEA (DEA분석을 활용한 건설프로젝트 화물포워딩 업체의 효율성 분석)

  • Lee, Jun-Woo;Park, Sung-Hoon;Oh, Jae-Gyun;Yeo, Gi-Tae
    • Journal of Digital Convergence
    • /
    • v.16 no.6
    • /
    • pp.75-84
    • /
    • 2018
  • Although many logistics companies are interested in project logistics, the existing research has been limited to the growth potential of project logistics market and the high barrier and importance of project logistics. This study analyzes using DEA the operational efficiency of forwarding companies registered in major overseas construction EPC companies and performing logistics services for overseas plant construction projects. For efficiency analysis, Super-SBM analysis and Malmquist analysis are used among DEA analysis techniques. As a result of the Super-SBM analysis, DMU 5 ranked first at 1.807. DMU 5 is more efficient than the other large corporations because it has the stable supply of its parent company H and the smallest input and output variables among the large corporations. As a result of Malmquist analysis, TCI, which is a technological development, showed a fluctuation while TECI showed a relatively stable variation. In addition, there is a difference in scale between major companies and small and medium sized companies. So, it is necessary to identify the efficiency improvement strategy for each group and apply it to the practical work.

Deriving Key Risk Sub-Clauses of FIDIC Conditions of Standard Subcontract -Based on FIDIC Conditions of Subcontract for Construction, edition 2011- (FIDIC 표준하도급 계약조건 핵심 리스크 세부조항 도출)

  • Hong, Seong Yeoll;Jei, Jae Yong;Seo, Sung Chul;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.3
    • /
    • pp.439-448
    • /
    • 2022
  • Recently, domestic small and medium-sized subcontractors participating in the overseas construction market are suffering from the continuous loss and damage due to the insufficient recognition of the importance of risk Sub-Clauses among conditions of subcontracts. Therefore, the need to derive risk Sub-Clauses for conditions of the subcontract has been raised, but until now, previous studies have been conducted focusing on deriving risk Sub-Clauses for standard conditions of contract for construction between the Employer and the Contractor. In this study, 52 risk Sub-Clauses were derived on the basis of the influence size of the Sub-Clauses through the Delphi technique targeting 94 Sub-Clauses of conditions of standard subcontract for construction edition 2011, issued by the International Federation of Consulting Engineers (FIDIC) and In addition, 33 key risk Sub-Clauses were finally derived through the PI Risk Matrix by Probability and Impact. The results of this study provide will useful information on key risk Sub-Clauses that need to be reviewed in advance to minimize contractual risks at the stage of bidding and signing contracts for overseas subcontract construction projects.

Key Risks and Success Factors on the China's Public-Private Partnerships Water Project (중국 수처리 민관협력사업 사례분석을 통한 시사점 도출: 위험 및 성공 요인 도출)

  • Choi, Jae-Ho;Lee, Seung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.134-144
    • /
    • 2010
  • In China, the enhancement of water services has become the most crucial issue confronted with the rapid urbanization and industrialization process. A huge financial gap to meet the demand for water infrastructure and need for adopting advanced operation technology precipitated the rapid growth of PPP over the last 10 years. Diverse schemes of PPP such as TOT, Divestiture, and Management Contract and Lease have been practiced. Local governments and private investors/operator have adjusted their objectives and strategies to avoid potential pitfalls behind BOT projects in China. However, current academic research outcomes do not properly reflect important issues of BOT projects or related case studies in China. This limitation has brought in the lack of assessment of important risks and success factors required for the improvement of the body of risk management. In this regard, this study uses the market analysis method to identify major schemes of PPP water projects and conducts case studies on five PPP projects to identify key risk and success factors in association with each different scheme. It is expected that the risk and success factors identified from the cases will be used as reference to Korean companies which plan to enter the Chinese water market.

Improvement of Architecture-Engineering Service Procurement System for Public Construction Project (건설기술용역 발주 및 입·낙찰 방식의 문제점 및 개선방안)

  • Kim, Sung-Il;Chang, Chul-Ki;Park, Dae-Keun;Bae, Yu-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.61-70
    • /
    • 2014
  • Various procurement systems for Architecture-Engineering service for public construction project are currently established by construction-related law. However, comprehensive framework and criteria for the selection of Architecture-Engineering firm are in absence. Even though various selection methods for Architecture-Engineering service are currently established by law, cost-based selection method is mainly used in selecting Architecture-Engineering firm for the service. This paper examined current use of procurement system for Architecture-Engineering service and drew problems in practice. Through analysis of problems and bench-marking of those systems in advanced countries and international organizations, several strategies to improve performance of Architecture-Engineering service and to maximize the efficiency were suggested. The suggestions include framework and guideline to select a procurement method for the service which is being considered for the project and way of improving current procurement system. These suggestions will be a foundation for utilizing appropriate procurement system for the specific project and can make domestic Architecture-Engineering firm more competitive in the global market by breaking form the cost-based selection method in the selection of Architecture-Engineering firms.

A research on the development of Lianyungang port (중국 연운항항 발전방향)

  • Ma, Chang-Ming;Jo, So-Hee;Nam, Ki-Chan
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2009.10a
    • /
    • pp.206-207
    • /
    • 2009
  • It is estimated that the potential of Chinese market is infinite. The success of Chinese economic reformation is generating the high economic growth in China. China is a rising logistics market as its growing throughput and port expansion but China's railway transportation system is not well-linked with ports. China built TCR(Trans-China Railway) which is across the Chinese territory and connected to as far as Europe. With this mode, it is possible to place more overseas freight and meet more customers' needs. Lian yun gang is a city on the East coast of China where the commencing station of TCR is located. This paper reviews the present conditions of Lianyungang and presents the development direction of the city to become a logistics point.

  • PDF

Market Evaluation of Seawater Desalination Plant considering International Water Scarcity and Expense Outlook by Use and Nation (해외 물 기근 현황과 용도별.국가별 자본지출 전망을 고려한 해수담수화 플랜트 시장성 평가)

  • Yang, Jeong-Seok;Sohn, Jinsik;Kang, Dae-Su
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.2
    • /
    • pp.178-187
    • /
    • 2011
  • National water supply, water resources available, the ratio of water supply to total water resources, and the ratio of water supply to available water resources were investigated to find global seawater desalination plant market for 163 nations. Water resources available per capita from 2007 to 2016, population in water scarcity region from 2011 to 2016, and the ratio of water scarcity population to total population were also analyzed for the countries. Annual percentage increase in total municipal drinking water capital expenditure and Annual percentage increase in total industrial water market were analyzed to predict the amount of water supply by use. 76 countries are suffering from water scarcity and 60 countries among the countries have coastal regions. Forty countries were selected by considering the considerable amount and highly increasing trend of water demand by use. Most countries show increasing trend of industrial water and 82 countries have more than 4% annual increasing rate for domestic water expense from 2008 to 2016 among 163 countries. Among the 76 water scarcity countries 16 countries were finally selected by considering expense prediction by use. Middle-east, east asia, pacific ocean, and west europe regions include most selected countries.

EPC Plant Project Lessons Learned Utilization Analysis (EPC 플랜트 프로젝트의 성공/실패사례 활용도 분석)

  • Yang, Sihoon;Kang, Taek-Ki;Cho, Young Duk;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.5
    • /
    • pp.39-47
    • /
    • 2021
  • As domestic construction companies, which used to be concentrated in the Middle East, have expanded their overseas orders to new markets in Asia and Latin America, they have to cope with various conditions. The EPC plant project, which undertakes construction projects such as civil engineering and construction, design, purchase, construction and commissioning, has expanded its scope. As a result, it is important to collect Lessons Learned from the previous project, systematize it, and use it to respond to changes in the environment. However, many employees do not share their skills or experiences voluntarily. To do so, it is necessary to create and systematize a culture that shares experience and technology. In order to understand and analyze the current situation, a questionnaire was conducted on the EPC project-related departments of construction companies implementing the EPC plant project. About 74% of the participants said Lessons Learned's collection and utilization helped. About 53% of the people who collected and registered actual cases and 39% of the people who had experience in preventing problems using cases were identified as employees' perception and utilization of Lessons Learned systems. Detailed analysis showed differences in workplace, duties, and rank. Through this study, the current status of Lessons Learned collection and utilization of EPC plant projects is understood, and the research on collection and utilization improvement is being carried out.

The Effect of Corporate Social Responsibility on Organizational Trust, Job Satisfaction and Turnover Intention (건설기업의 사회적 책임 활동이 조직신뢰, 직무만족과 이직의도에 미치는 영향)

  • Cho, Jin-Ho;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.83-94
    • /
    • 2019
  • Recently, the proportion of overseas orders of domestic construction companies is increasing, and the global market demands management transparency on corporate social responsibility activities. Therefore, domestic companies are faced with the need to systematically prepare for social responsibility activities. The purpose of this study was to examine whether CSR activities have a moderating effect on the relationship between organizational trust, job satisfaction, turnover intention and contract type. This study analyzed the effect of CSR activities on organizational trust, job satisfaction and turnover intention. The study targets regular and irregular workers in construction companies who promote CSR activities through the homepage, public service ad, and media. The questionnaire distributed 300 copies online. The final valid sample is 255 (145 Regular and 110 Irregular). Empirical analysis used a structural equation model. The results of the study are as follows. First, in CSR activities, economic responsibility, philanthropic responsibility and ethical responsibility had a positive (+) effect on organizational trust. Second, organizational trust had a positive (+) effect on job satisfaction in CSR activities. Finally, the magnitude of the Moderate effect of the type of labor contract according to the group classification showed that the CSR activity on organizational trust had many regular employees with economic responsibility. Also, organizational trust in job satisfaction was found to be large in regular employees. The results of this study can be a guide to CSR activities of construction companies in terms of organizational effectiveness.