• Title/Summary/Keyword: 해외건설시장

Search Result 277, Processing Time 0.031 seconds

Strategy Development for Expanding High-speed Railway into both Korean Domestic Market and Foreign Market (고속철도사업 활성화 및 건설업체의 해외사업참여 확대방향 연구)

  • Park, Heedae;Park, Hyung Keun;Jang, Hyeon Seok;Han, Seung Heon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.1D
    • /
    • pp.119-126
    • /
    • 2011
  • High-speed railway raises global interests with the growing concerns on the green development and the green energy. However, since most of the infrastructure investment of Korea was focused on the highway projects for last forty years, the investment on the railway has been limited around 40~50% of that of the highway projects. In addition, due to the world economy crisis and unsatisfactory support of existing policy for the private investment project, the private investment is given a small deal of weight on the social overhead capital investment. Meanwhile, despite the world high-speed railway market is growing rapidly and the Korean contractors have won the international construction contracts over 70 billion USD, past records of railway projects are very rare. Therefore, it is required to develop strategies for encouraging private investment in the domestic market to achieve efficient high-speed railway development and for advancing into foreign high-speed railway market. This study carried out data collection and market analysis for both domestic and foreign market respectively. Through a structured questionnaire survey and expert interviews, contractors' perceptions on the high-speed railway market and needs for the government support are collected. Summary of strategies drawn from this study are as follows: 1) carrying out BTL high-speed railway projects and revising related policies; 2) upwarding incentive level for the private pre-investment projects considering the contractors' credit rating; 3) carrying out Honam-Jeju submarine railway project; 4) establishing a efficient consortium model for foreign market; 5) improving the capacity of the Korea Railway Association that support Korean contractors' foreign advancement; and 6) expand the budget for Global Infra-fund.

해외 진출 배경과 추진방향 - 해외시장정보 공유, 관련업체협력체제 긴요

  • 이기웅
    • Nuclear industry
    • /
    • v.14 no.7 s.137
    • /
    • pp.8-11
    • /
    • 1994
  • 해외원전사업은 아직 초보단계이기 때문에 시장정보와 $\ulcorner$마케팅$\lrcorner$능력에 있어서 열세(劣勢)에 있는 등 사업추진에 어려움이 많고 위험부담이 수반된다. 해외원전 사업을 성공적으로 달성하기 위해서는 우선 해외시장 정보의 공유(共有)와 국내 관련업체들의 분야별 상호보완적인 협력체제를 유지해야 한다. 또한 단기에 가시적인 성과를 기대하기 보다는 장기적으로 인내심을 갖고 꾸준히 추진하는 전략적인 노력이 필요하다. 우리의 진출 분야는 원자력사업을 시작하려는 나라들과 교류를 증진하면서 타당성(妥當性) 조사, 설계, 기자재 공급, 기술용역 지원, 그리고 건설 시공 등을 맡는 것이다.

  • PDF

Analysis of Dynamic Relationship between Changes in Domestic and Overseas Orders and Insolvency of Construction Companies (국내외 수주동향과 건설업체 부실화 간의 동태성 분석)

  • Jang, Sewoong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.87-94
    • /
    • 2014
  • This study aims to analyze the relationship. The study applies EDF (Expected Default Frequency) as a variable that indicates management status of a construction company. To analyze changes in business structure of construction companies, the study refers to the amounts of domestic and overseas project orders as variables. The data was retrieved from TS2000 established by Korea Listed Companies Association (KLCA), Statistics Korea and International Contractors Association of Korea. The analysis period is between first quarter of 2001 and fourth quarter of 2010. The analysis results showed that as more domestic and overseas orders rolled in for domestic companies, their business conditions improved as the hypothesis suggested. However, the level of improvement varied. Further, when construction companies' business slowed down, the proportion of overseas projects tended to rise, while the ratio of domestic business decreased.

Global Construction Business Management (글로벌 건설경영)

  • Shim Og-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.13-18
    • /
    • 2002
  • Foreign construction requires the globalization of management structure and role execution as a global manager. Therefore, this paper prospects the light and shadow of Korea construction business with the consideration about the foreign construction market and Korea's foreign construction. This paper interprets meaning about the foreign construction and analyzes the distinction, strategy, and competitive factor of foreign construction business. On the basis of interpretation and analysis, this paper suggests the innovative change of the domestic construction business manager and management system.

  • PDF

Risk Identification and Priority method for Overseas LNG Plant Projects - Focusing on Design Phase - (해외 LNG 플랜트 리스크요인 도출 및 우선순위 평가 - 설계단계를 중심으로 -)

  • Jang, Woo-Sik;Hong, Hwa-Uk;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.146-154
    • /
    • 2011
  • Korean contractors have been maintained sustainable growth since entering into overseas construction market for the first time in 1960' s. In 2010, Korean contractors ordered 761 billion (USD) from overseas markets. Especially, billion (USD) were earned by Korean contractors in overseas plant construction market which account for more than 80% of the total amount by Korean contractors. Nevertheless, many Korean contractors are suffering from lack of technological competitiveness and construction management skills in the design phase compared with global leading contractors. These conditions have directly effect on the success of projects in terms of cost, duration, and quality. So, this study focused on identifying the risk factors and developing risk priority method for the design phase of LNG plant projects whose market is expanding. Research procedures were conducted by the following three steps. First, total 57 risk factors were identified in design phase through extensive literature reviews and experts survey. Second, the authors developed risk priority method which are more suitable for design phase of LNG plant projects by using three criteria, Probability(P), Impact(I), and Coordination Index(CI). Finally, the suitability of risk priority method and practical applicability were verified through expert survey and interview. Consequently, if korean contractors use the suggested risk factors and priority method based on their own know-how and experiences, then more reasonable and rational risk management will be conducted in the design phase of LNG plant projects.