• Title/Summary/Keyword: 합성부재

Search Result 254, Processing Time 0.019 seconds

A study of Jeju Buddhist art and Bok-sin Maitreyas (제주의 불교미술과 자복미륵)

  • Lee, Kyung-Hwa
    • Korean Journal of Heritage: History & Science
    • /
    • v.51 no.3
    • /
    • pp.104-121
    • /
    • 2018
  • The purpose of this paper is to contribute to a more comprehensive understanding of the Buddhist art in Jeju which has rarely been in the mainstream discussions about the Korean art by focusing on the statues of Jabok Mireuk, or Maitreya of Wealth and Fortune. The Buddhist art in Jeju reached its heyday during the late phase of the Goryeo period (918-1392). The imperial court of Yuan (1271-1368) established Beophwasa, one of its guardian temples which was also a "complementary temple" of Goryeo (918-1392). In 1296, the community of monks based in Myoryeonsa Temple published the Jeju edition of the Buddhist canon granted by the royal court of Goryeo, contributing to the foundation of the island's academic culture. Other items representing the heyday of the Buddhist art of Jeju include the Vajra Guardian carved on the greenschist pagoda of Sujeongsa Temple built during the late Goryeo period and the Five-story Stone Pagoda of Bultapsa Temple made from the locally obtained basalt rock during the early $14^{th}$ century. The Buddhist art of Jeju during the Joseon period (1392-1910) is represented by Jabok Mireuk, or Maitreya of Wealth and Fortune, a pair of stone statues of Maitreya Buddha carved to feature three aspects of the Maitreya worship spread among the local folks in the period. Each of the statues is in a peaked cap and official's robe and characterized by bulging eyes comparable to those of the Buddhist guardian deities such as the Vajra guardian who were designed to protect a sacred area against evil forces. The Maitreya statues provide valuable sources of knowledge about the types of Maitreya adopted by the worshippers of local folk religion in the Joseon period. The Jabok Mireuk statues in Jeju can be easily compared with the Two Rock-carved Standing Buddhas in Yongmi-ri, Paju (1471), and the two standing stone Buddhas in Daeseongsa Temple in Okcheon (ca 1491) and on the Sipsinsa Temple site in Gwangju in that they all wear peaked caps in the "treasure canopy" style which gained popularity during the early Joseon period. One may conclude then that these statues are related with the Neo-Confucian elites who wanted the Joseon dynasty they established to prosper under the auspices of the Buddha of the Future. Interestingly, the enshrinement of the stone Buddha of Daeseongsa Temple is presumed to have been participated by Yuk Han who had served as the Governor (Moksa) of Jeju, suggesting its connection with the Jabok Mireuk despite the regional difference in their style.

A Study on the Importance and Priorities of the Investment Determinants of Startup Accelerators (스타트업 액셀러레이터 투자결정요인의 중요도 및 우선순위에 대한 연구)

  • Heo, Joo-yeun
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.15 no.6
    • /
    • pp.27-42
    • /
    • 2020
  • Startup accelerators have emerged as new investment entities that help early startups, which are not easy to survive continuously due to lack of funds, commercialization capabilities, and experiences. As their positive performance on early startups and the ecosystem has been proven, the number of early startups which want to receive their investment is also increasing. However, they are vaguely preparing to attract accelerators' investment because they do not have any information on what factors the accelerators consider important. In addition, researches on startup accelerators are also at an early level, so there are no remarkable prior studies on factors that decide on investment. Therefore, this study aims to help startups prepare for investment attraction by looking at what factors are important for accelerators to invest, and to provide meaningful implications to academia. In the preceding study, we derived five upper level categories, 26 lower level accelerators' investment determinants through the qualitative meta-synthesis method, secondary data analysis, observation on US accelerators and in-depth interviews. In this study, we want to derive important implications by deriving priorities of the accelerators' investment determinants. Therefore, we used AHP that are evaluated as the suitable methodology for deriving importance and priority. The analysis results show that accelerators value market-related factors most. This means that startups that are subject to investment by accelerators are early-stage startups, and many companies have not fully developed their products or services. Therefore, market-related factors that can be evaluated objectively seem to be more important than products (or services) that are still ambiguous. Next, it was found that the factors related to the internal workforce of startups are more important. Since accelerators want to develop their businesses together with start-ups and team members through mentoring, ease of collaboration with them is very important, which seems to be important. The overall priority analysis results of the 26 investment determinants show that 'customer needs' and 'founders and team members' understanding of customers and markets' (0.62) are important and high priority factors. The results also show that startup accelerators consider the customer-centered perspective very important. And among the factors related to startups, the most prominent factor was the founder's openness and execution ability. Therefore, it can be confirmed that accelerators consider the ease of collaboration with these startups very important.

Structural Behavior Evaluation of NRC Beam-Column Connections (NRC 보-기둥 접합부의 구조적 거동 평가)

  • Jeon, Ji-Hwan;Lee, Sang-Yun;Kim, Seung-Hun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.26 no.1
    • /
    • pp.73-80
    • /
    • 2022
  • In this study, details of NRC beam-column connections were developed in which beam and columns pre-assembled in factories using steel angles were bolted on site. The developed joint details are NRC-J type and NRC-JD type. NRC-J type is a method of tensile joining with TS bolts to the side and lower surfaces of the side plate of the NRC column and the end plate of the NRC beam. NRC-JD type has a rigid joint with high-strength bolts between the NRC beam and the side of the NRC column for shear, and with lap splices of reinforcing bar penetrating the joint and the beam main reinforcement for bending. For the seismic performance evaluation of the joint, three specimens were tested: an NRC-J specimen and NRC-JD specimen with NRC beam-column joint details, and an RC-J specimen with RC beam-column joint detail. As a result of the repeated lateral load test, the final failure mode of all specimens was the bending fracture of the beam at the beam-column interface. Compared to the RC-J specimen, the maximum strength of the specimen by the positive force was 10.1% and 29.6% higher in the NRC-J specimen and the NRC-JD specimen, respectively. Both NRC joint details were evaluated to secure ductility of 0.03 rad or more, the minimum total inter-story displacement angle required for the composite intermediate moment frame according to the KDS standard (KDS 41 31 00). At the slope by relative storey displacemet of 5.7%, the NRC-J specimen and the NRC-JD specimen had about 34.8% and 61.1% greater cumulative energy dissipation capacity than the RC specimen. The experimental strength of the NRC beam-column connection was evaluated to be 30% to 53% greater than the theoretical strength according to the KDS standard formula, and the standard formula evaluated the joint performance as a safety side.

Behavior of Hollow Box Girder Using Unbonded Compressive Pre-stressing (비부착 압축 프리스트레싱을 도입한 중공박스 거더의 거동)

  • Kim, Sung Bae;Kim, Jang-Ho Jay;Kim, Tae Kyun;Eoh, Cheol Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.3A
    • /
    • pp.201-209
    • /
    • 2010
  • Generally, PSC girder bridge uses total gross cross section to resist applied loads unlike reinforced concrete member. Also, it is used as short and middle span (less than 30 m) bridges due to advantages such as ease of design and construction, reduction of cost, and convenience of maintenance. But, due to recent increased public interests for environmental friendly and appearance appealing bridges all over the world, the demands for longer span bridges have been continuously increasing. This trend is shown not only in ordinary long span bridge types such as cable supported bridges but also in PSC girder bridges. In order to meet the increasing demands for new type of long span bridges, PSC hollow box girder with H-type steel as compression reinforcements is developed for bridge with a single span of more than 50 m. The developed PSC girder applies compressive prestressing at H-type compression reinforcements using unbonded PS tendon. The purpose of compressive prestressing is to recover plastic displacement of PSC girder after long term service by releasing the prestressing. The static test composed of 4 different stages in 3-point bending test is performed to verify safety of the bridge. First stage loading is applied until tensile cracks form. Then in second stage, the load is removed and the girder is unloaded. In third stage, after removal of loading, recovery of remaining plastic deformation is verified as the compressive prestressing is removed at H-type reinforcements. Then, in fourth stage, loading is continued until the girder fails. The experimental results showed that the first crack occurs at 1,615 kN with a corresponding displacement of 187.0 mm. The introduction of the additional compressive stress in the lower part of the girder from the removal of unbonded compressive prestressing of the H-type steel showed a capacity improvement of about 60% (7.7 mm) recovery of the residual deformation (18.7 mm) that occurred from load increase. By using prestressed H-type steel as compression reinforcements in the upper part of cross section, repair and rehabilitation of PSC girders are relatively easy, and the cost of maintenance is expected to decrease.