• Title/Summary/Keyword: 하자담보책임

Search Result 46, Processing Time 0.027 seconds

A Study on the Improvement of Defect Management through Judicial Precedents of Landscape Construction Defect (조경공사 하자판례 분석을 통한 하자처리 개선방안 연구)

  • Jung, Myeung-Muk;Lee, Sang-Suk
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.1
    • /
    • pp.81-91
    • /
    • 2012
  • The purpose of this study was to analyze judicial precedents related on landscape construction defects(JPLCD) and suggested the improvement plan for dealing with it. The results are as the following: 1. Landscape construction defects litigations have been increased so far since 2000 and the duration of original trial was approximately 603 days, while appeal trials took up to 550 days. Therefore, the analysis revealed that settlement of disputes were lengthy and wasteful to consumers and constructors. 2. Judgement's cost accepted by the judge was only 53.6% of appraisal's cost appraised by appraiser, therefore it revealed appraiser overestimated the repair cost of landscape construction defects. 3. According to work classification categorized by Landscape Construction Standard Specification(2008) of the Korean Institute of Landscape Architecture, landscape planting amounted to 75% of JPLCD and plaintiff(consumers)'s prevailing rate of it reached 77% to be a serious burden to constructors. 4. According to JPLCD categorized by the type of dispute, defects caused by consumer's negligence for maintenance amounted to 29% and defendant(constructors)'s prevailing rate of it reached 64% to be the main responsibility of consumers. Further study will be required to make the judge standard of landscape construction defects through legal and technical research.

A Study on the End of Defects Liability Exit Procedure in Apartment Buildings through Case Studies (사례분석을 통한 공동주택 하자담보책임 종료 절차연구)

  • Kim, Jin-kuk;Bang, Hong-Soon;Choi, Byung-Ju;kim, Ok-Kyue
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.10
    • /
    • pp.25-32
    • /
    • 2018
  • The ending of the warranty under the current Multi-Housing Management Act has a lot of problem as it is very disadvantageous to the business entity and it makes hard for the contractor to finish the repair work. It is almost none for the business entity to get the written confirmation of the expiration of warranty liability from the client even though it sincerely completed their warranty obligation. It is because the client asks for the works other than fair repair arising from the defect in the work, such as the upgrade work for the enhancement of the value of their assets and the repair work which the client should take care before it issues the written confirmation of the expiration of warranty liability to the contractor. "So, though there is the law specifying this matter, the parties are relying on the unnecessary civil agreement. This leads to the big social and economic losses. If there is no agreement made between the client and the contractor, that leads to the legal dispute. This research on cases of 10 apartments shows that the types of works which the apartment residents ask for depend on the characteristics and conditions of the apartments and that they ask for various kinds of compensational works. In addition, it was found that there were many cases in which even the civil agreement is not recognized as the ending of the warranty obligation even if the proper procedure is taken for the ending of warranty by the contractor or business entity. If the collateral is to be offered to the client, the contractor would get more hard because there is the additional cost other than the warranty obligation, thus damaging the legal objective of the laws trying to minimize the damage made to the resident of the apartments. It means that the increase in the unnecessary warranty cost would lead to the increase in the selling price of apartment and the ending of the dispute through the civil procedure would make the Multi-Housing Act ineffective.

The Limitation of the Military Aviation Manufacturer's Liability (우리나라 군용항공기 제작사의 책임제한 해결방안에 관한 고찰)

  • Shin, Sung-Hwan
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.32 no.1
    • /
    • pp.139-175
    • /
    • 2017
  • The Assembly plenary session on December 3, 2017 passed a Product Liability Amendment bill that introduced clauses concerning consumer burden of proof and punitive damage reimbursement. More specifically, these newly approved provisions will reduce the burden of proof placed on consumers and levy triple punitive damage on suppliers. Significant increases in the number of product-liability lawsuit and the number of related insurance contracts are expected. Since military aircraft are designed for operational purpose(seeking greater combat effectiveness over greater safety) and used in high-risk environment, it is practically impossible to obtain an affordable product-liability insurance, Without having any backup plan, military aircraft manufacturers directly face all sort of liability risks under Product Liability Act, Warrant Liability Act and Non-Performance of Contract Act. The U.S. experienced similar problems when they first implemented their product-liability law in 1970s. There had been a big dispute among legal practitioner, insurance professionals and scholars concerning military aircraft manufacturer's liability. In order to settle the issue, the U.S. Supreme Court has established a new precedent of Government Contractor Defense(GCD). The U.S. government also included an indemnity clause for military aircraft manufacturers in their FMS Contract with the Korean government. Likewise, Korean military aircraft manufacturers should 1) clearly understand their current position that they cannot afford expensive product-liability insurance and the cost is not accounted in the military procurement calculation, 2) estimate potential liability risks with the ongoing overseas export expansion in mind, 3) set up appropriate risk management measures through regulatory reform and policy development.

  • PDF

법령과 고시 ① - 건설산업기본법, 시행령, 시행규칙 개정

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.308
    • /
    • pp.38-39
    • /
    • 2016
  • 정부는 그동안 건설업계에 부담으로 작용해 오던 규제인 '주기적 신고제도'를 폐지하고, 건설업 분야의 공정한 거래 질서 확립을 위해 공공 발주기관의 경우 하도급대금 및 건설기계 대여대금 지급보증서의 발급 여부 확인을 의무화 했으며, 추정 및 발주자 등의 불이익 행위 금지 제도를 도입했다. 한편 지난해 8월 11일 개정된 법률의 후속조치로 추가 변경공사 시 원도급자 서면요구 방법 결정 및 하자담보책임기간 설정 방법 결정 등의 시행령을 개정했으며, 시공능력평가 시 신인도평가액 산정방법 조정에 대한 시행규칙을 개정했다.

  • PDF

The Rules of Law on Warranty Liability in Contracts for the International Sale of Goods - With Special Reference to CISG - (국제물품매매계약에 있어서 하자담보책임에 관한 법리 - CISG를 중심으로 -)

  • Hong, Sung-Kyu
    • Journal of Arbitration Studies
    • /
    • v.24 no.4
    • /
    • pp.147-175
    • /
    • 2014
  • In contracts for the international sale of goods, a seller must deliver appropriate goods and hand over relevant documents according to a contract, which will transfer the ownership of the goods to a buyer. In this case, if there are defects in the contracted goods, the warranty liability will occur. However, in the United Nations Convention on Contracts for the International Sale of Goods (CISG), a term-the conformity of the goods to the contract-is used universally instead of the warranty. According to the CISG, a seller must deliver goods in conformance with the relevant contract in terms of quantity, quality, and specifications, and they must be contained in vessels or in packages according to the specifications in the contract. In addition, a certain set of requirements for conformity will be applied implicitly except when there is a separate agreement between parties. Further, the base period of conformity concerning the defects of goods is the point when the risk is transferred to the buyer. A seller shall be obliged to deliver goods that do not belong to a third party or subject to a claim then, and such obligations shall affect the right or claim of a third party to some extent based on intellectual property rights clauses. If the goods delivered by the seller lack conformity, or incur right infringement or claim of a third party, then it shall be regarded as a default item per the obligation of the seller. Thus, the buyer can exercise diverse means of relief as specified in Chapter 2, Section 3 (Article 45-Article 52) of the CISG. However, such means of relief have been utilized in various ways for individual cases as shown in judicial precedents made until now. Contracting parties shall thus keep in mind that it is best for them to make every contract airtight and they should implement each contract thoroughly and faithfully to cope with any possible occurrence of a commercial dispute.

  • PDF

Analysis of Domestic and Overseas Environment to Introduce Performance Warranty Contracting for Pavements into Korea (도로포장 성능보증계약제도 도입을 위한 국내외 적용환경 분석)

  • Kim, Tea-Song;Seo, Yong-Chil;Lee, Sang-Beom;Koo, Jai-Dong;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.216-221
    • /
    • 2008
  • This study has been carried out in order to observe the status of performance warranty contracting system currently being implemented at the advanced countries including Europe, U.S.A., and Japan, review the introduction feasibility and possibility. For this purposes this study has surveyed the concept and necessity of performance warranty contracting system as well as the status of domestic performance warranty contracting system. Especially the application environment for the performance warranty contracting system of Europe, U.S.A., Japan and Korea in terms of maintenance guarantee liability system, performance warranty regulations for design-build contracting system, selection method of successful bidder, performance warranty means, project contracting system including maintenance cost, and specifications and contract conditions for performance warranty system have been comparatively evaluated. And introduction methods of performance warranty contracting system were suggested.

  • PDF

Analysis on Legal Issue of Lawsuits and Subjective Judgment on Defects in Apartment Building (공동주택 하자소송의 법률적 쟁점사항과 판정체계분석)

  • Park, Jun-Mo;Seo, Deok-Seok;Choi, Jeong-Hyun;Kim, Ok-Kyue;Park, Kang-Woo;Jo, Jae-Hun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.42-53
    • /
    • 2012
  • Lawsuits related to defects in apartment buildings involve a range of legal issues, based on which the current subjective judgment system has been established. This study aims to organize the judgment system by stage of lawsuit from a legal perspective by reviewing the factors dealt with in precedent research. The main issues at hand include assignment of obligation, the day on which the computation of exclusion period begins and the day on which the defect repair is completed. The rationality of the current subjective judgment system could be determined by reviewing the recent cases. Based on the findings of the review, the following are suggestions for improvements and complements of the system. First, the process of assignment of obligation should be systemized, and the guarantee insurance system that provides a warranty deed should be improved as well. In addition, improvements and systemization should be made to clarify the responsibilities for any defect arising from the agreements that are not stipulated on the contract, computation of abatement rate of compensation and the system by which the responsibility for the defects is completed when residents acquire ownership from rental status.

A Study on the Minimization of Problems of the Direct Payment for Subcontractor's Work in Public Construction Project (공공건설사업(公共建設事業) 하도급대가(下都給代價) 직접지급(直接支給)의 효과분석(效果分析)을 통한 문제점(問題點) 저감방향(低減方向)에 대한 연구(硏究))

  • Cho, Young-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.101-108
    • /
    • 2007
  • To execute a construction project, many construction participants are engaged in the project. Especially many subcontactors role is very important, but their contract statute seems weaker rather than prime contractor. So to protect the subcontractor and to activate fair subcontract, Fair Transactions in Subcontracting Act was enacted. Direct payment to subcontractor clause of the act can protect subcontractor from the fear of insolvency of prime contractor, on the other hand can cause dispute about the interpretation of defect liability. Therefore the positive act and regulation were examined, and the effects of direct payment to subcontractor were analyzed. And the treatment direction of direct payment were suggested in this paper. Summary is as follows; (1) Statute of subcontractor for the ordering subject must be considered (2) Contract relationship must be reflected in the performance bond, subcontract bond, and subcontract construction conditions (3) To clarify the defect liability for the direct payment, retainage to guarantee the repair during contract period may be reflect on the subcontract construction conditions.

A Study on the Service Provider's Duty to Provide Services in Conformity with the Contract under the DCFR (DCFR상 서비스제공자의 계약에 적합한 서비스제공의무에 관한 연구)

  • Lee, Byung-Moon
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.50
    • /
    • pp.27-59
    • /
    • 2011
  • This article attempts to describe and analyze the rules on the service provider's duty to provide his service in conformity with the contract under the Draft Common Frame of Reference (here-in-after DCFR), which are applied to construction, storage, design and factual information contracts. It categorizes such rules in accordance with the requirements of conformity with the contract, the time when the service provided must be in conformity with the contract, and the exemptions of the service provider's duty. On the basis of such categorization, it examines the rules on the service provider's duty in each type of service contract under the DCFR. By doing so, it seeks to figure out how the members of EU compromised on the various issues of the service provider's duty under the DCFR which is regarded as the first uniformed legislation in the area of the service contract. This may provide some guidance to the legislators of domestic law for their amendment or interpretation of their laws. In addition to them, this article also seeks to point out problems in terms of their interpretations and gaps in their rules to cover various aspects of non-conformity and put forward some solutions for such problems and gaps.

  • PDF

Research Trends on Defects of Apartment Building by Keyword Network Analysis (키워드 네트워크 분석을 이용한 공동주택 하자 연구 동향 분석)

  • Jang, Ho-myun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.9
    • /
    • pp.403-410
    • /
    • 2017
  • Apartment housing has rapidly increased since the housing supply policy implemented in the late 1980s. However, various defects have occurred because the policy focused only on quantity supply, while neglected quality control. In addition, disputes related to various defects are increasing. ; accordingly, studies defects of apartment houses have been continuously conducted to solve various problems. In this study, I analyzed the research trends regarding long-term accumulated defects of apartment buildings by keyword network analysis, and suggest implications. As ananalysis method, I collected journal articles using the portal of the Korea Educational and Scientific Information Agency and constructed data analysis by filtering collected academic papers and keyword refinement. Ialso performed visualization modeling for keyword network relationships, connection degree centrality analysis, and mediation centrality analysis. The results revealed that Mortgage, Dispute, Repair, Case, Response, Condensation, Cost, Institution, Standard, and Valuation are the main keywords that characterize apartment housing defects.