A Decision Support Model for the Exchange Risk Management of Overseas Construction Projects (해외 건설 프로젝트의 환리스크 관리를 위한 의사결정 지원 모델)

  • An, Chi-Hoon;Yoo, Hyun-Seok;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.109-121
    • /
    • 2012
  • Overseas construction project orders have shown steady increase since 2001, and it took 44.5% of the total construction project orders in 2010. Overseas construction project needs more complex risk management because it is affected by more various circumstance factors than the domestic construction is. Previous studies have centered on the internal risk factors to assist the decision-making, but there are few researches on the importance and techniques of foreign exchange risk management. Inadequate management of foreign exchange risk has been found to cause huge damages due to the lacking recognition on the importance of foreign exchange risk management. Therefore, current study designed a foreign exchange risk manage model to help efficient management and decision-making. This model was developed as a technique to meet the demand of the increasing overseas construction projects for the efficient management of foreign exchange risk, and the technique will lower the risk with more and more accurate outcome by accumulating the data of profit-and-loss.

Software Cost Estimation Model Based on Use Case Points by using Regression Model (회귀분석을 이용한 UCP 기반 소프트웨어 개발 노력 추정 모델)

  • Park, Ju-Seok;Yang, Hea-Sool
    • The Journal of the Korea Contents Association
    • /
    • v.9 no.8
    • /
    • pp.147-157
    • /
    • 2009
  • Recently, there has been continued research on UCP from the development effort estimation method to a software development project applying object oriented development methodology. Current research proposes a linear model estimating the developmenteffort by multiplying a constant to AUCP which applies technical and environmental factors. However, the fact that a non-linear regression model is more appropriate as the software size increases, the development period increases exponentially. In addition, in the UCP calculation process the occurrence of FP errors due to the application of TCF and EF, it is unrealistic to estimate the size with AUCP. This paper presents the issue of current research based on UCP without considering problems of the research, for example, TCF and EF and expresses the models (linear, logarithmic, polynomial, power and exponential type) estimating the development effort directly from UUCP. Consequently, the exponential model within non-linear models exhibit more accurate results than the current linear model. Therefore, after calculating the UUCP of the developing software system, using the proposed model to estimate the development effort, it is possible to estimate the direct cost required in development.

Software Development Effort Estimation for Testing Data Analysis (테스팅 데이터 분석을 통한 소프트웨어 개발 노력 추정)

  • Jung, Hye-Jung;Yang, Hae-Sool
    • The KIPS Transactions:PartD
    • /
    • v.11D no.1
    • /
    • pp.173-182
    • /
    • 2004
  • The research to estimate development effort of software has been progress. But, it is not easy gain that testing data for estimating of development effort. Also, if we get the testing data, it is important that analysis testing data. In this paper, we study the data analysis of software development effort using the 789 software development projects which developed in the 1990's. Software development scale and software development team site are various. Using the characteristic of factor, we have to study characteristic of data and we estimate the development effort step by step. First, we prove the difference of development effort with the 789 project data according to development type, development environment, the development language etc. Also, we execute the crosstabs analysis that team site and function point.

Analysis of Influencing Item of Green Building Certification;Focused on Energy Part of Commercial Buildings (친환경 인증 사업타당성 영향요인 분석;업무용건축물의 에너지 평가부문을 중심으로)

  • Kook, Dong-Hoon;Kim, Ah-Yung;Han, Kap-Kyu;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.431-435
    • /
    • 2007
  • Green Building Certification Program, which was first introduced to residential buildings in Korea in 2002, has been put on track. This program is expected to bring about the effect in the economic viewpoint that was based on a life-cycle-cost analysis, not to mention the environmental viewpoint. However, given the fact that the existing model for feasibility analysis focusing on early investment cost can hardly be applicable to the green buildings because of lacking the life-cycle-cost reduction factor, it remains still difficult to conduct an objective evaluation. The study thus was intended to identify the factors that should be additionally considered in conducting the feasibility study to be implemented through the analysis of the certification items of green buildings as a preliminary study in structuring the evaluation model for feasibility analysis of green buildings.

  • PDF

Establishing Risk Management Process for Improved Business Value of a Multi-Purpose Building Project (복합 시설 프로젝트의 사업 가치 향상을 위한 리스크 관리 프로세스 구축 방안)

  • Lee, Jong-Sik;Cho, Seung-Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.64-71
    • /
    • 2018
  • Project Management Institute of America separates the types of risk with external risks and internal risks. The external risk is an uncontrollable risk in projects such as changes of policy and related systems, climate, natural disasters, exchange rates and so on. The internal risk is an existing risk in the project itself that is controllable items in the project. Technical risks in project management are cost, quality, time, safety and environment. Therefore, both the external and internal risks should be managed to perform the construction project successfully. In particular, we can secure the quality and safety of facilities through the technical risk management. The importance of potential risk management has been emerging as a major interest and the lack of risk management delays projects and increases construction costs with negative effects of the building safety since the complex building, which is composed of a great number of facilities, consists of many project units and there are conflicts between various participants and stake-holders. This study presents the ways of establishing risk management processes to ensure the safety of the complex building. To that end, establishing procedure of risk management processes is presented and types of risk and factors in construction projects and counter strategies are presented as available risk information on the stages.

Development of SVM-based Construction Project Document Classification Model to Derive Construction Risk (건설 리스크 도출을 위한 SVM 기반의 건설프로젝트 문서 분류 모델 개발)

  • Kang, Donguk;Cho, Mingeon;Cha, Gichun;Park, Seunghee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.841-849
    • /
    • 2023
  • Construction projects have risks due to various factors such as construction delays and construction accidents. Based on these construction risks, the method of calculating the construction period of the construction project is mainly made by subjective judgment that relies on supervisor experience. In addition, unreasonable shortening construction to meet construction project schedules delayed by construction delays and construction disasters causes negative consequences such as poor construction, and economic losses are caused by the absence of infrastructure due to delayed schedules. Data-based scientific approaches and statistical analysis are needed to solve the risks of such construction projects. Data collected in actual construction projects is stored in unstructured text, so to apply data-based risks, data pre-processing involves a lot of manpower and cost, so basic data through a data classification model using text mining is required. Therefore, in this study, a document-based data generation classification model for risk management was developed through a data classification model based on SVM (Support Vector Machine) by collecting construction project documents and utilizing text mining. Through quantitative analysis through future research results, it is expected that risk management will be possible by being used as efficient and objective basic data for construction project process management.

Study on e-Learning Platform for Higher Education in Developing Countries - Case Study of Cambodia (개발도상국 고등교육을 위한 이러닝 플랫폼에 관한 연구 - 캄보디아 사례를 중심으로)

  • Mak, Sayphearoth;Kwon, Ho Yeol
    • Journal of Digital Contents Society
    • /
    • v.19 no.7
    • /
    • pp.1263-1270
    • /
    • 2018
  • We investigated the e-learning platforms for higher education in developing countries. First, we introduced e-learning environmental factors such as ICT technology as well as ASEAN Cyber University (ACU) project for developing countries. And then, we presented Cambodian case as an example of e-learning platform for developing countries. We analyzed the national education policy and ICT environment as well as the demands and obstacles of e-learning in Cambodia. We derived e-learning strategies and plans based on the analysis results, and finally proposed e-learning platform C-MOOC Net. In order to verify the proposed scheme, we developed prototype of C-MOOC Net system which is implemented based on open software. As a result, we have met the requirement of networking the C-MOOC hub, supporting localization of local language and personalization of favorite courses respectively.

The Success Factors for Self-Service Business Intelligence System: Cases of Korean Companies (사용자 주도 비즈니스 인텔리전스 성공요인 고찰: 한국 기업 사례를 중심으로)

  • JungIm Lee;Soyoung Yoo;Ingoo Han
    • Knowledge Management Research
    • /
    • v.24 no.3
    • /
    • pp.127-148
    • /
    • 2023
  • Traditional Business Intelligence environment is limited to support the rapidly changing businesses and the exponential growth of data in both volume and complexity of data. Companies should shift their business intelligence environment into Self-Service Business Intelligence (SSBI) environment in order to make smarter and faster decisions. However, firms seem to face various challenges in implementing and leveraging the effective business intelligence system, and academics do not provide sufficient studies related including the success factors of SSBI. This study analyzes the three cases of Korean companies in depth, their development process and the assessment of business intelligence, based on the theoretical model on the key success factors of business intelligence systems. The comparative analysis of the three cases including project managers' interviews and performance evaluations provide rich implications for the successful adoption and the use of business intelligence systems of firms. The study is expected to provide useful references for firms to fully leverage the effects of business intelligence systems and upgrade towards self-service business intelligence systems.

Design and implementation of quotation management process according to quotation change factors in make-to-order manufacturing environments (수주생산환경에서 견적변경 요인에 따른 견적관리 프로세스의 설계 및 구현)

  • Jeon, Gyu-Hwan;Jang, Gil-Sang;Park, Chang-Kwon
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.4
    • /
    • pp.879-892
    • /
    • 2021
  • In a make-to-order manufacturing environment, the manufacturer's quotation information is important information used as basic information for bidding, receiving orders, and producing products in response to various customer demands. This quotation information is changed according to various factors such as customer demands, changes in product production environment, changes in drawing information of technical partners, and technological improvement of products. Due to this change, various changes occur in the quotation information that the manufacturer is preparing to reflect the customer's requirements. The change of quotation information according to these various change factors puts a lot of burden on the quotation management work from the standpoint of a make-to-order manufacturing company. In particular, the change of quotation information due to the change factors of quotation is inevitable and frequently occurs due to the requirements of the customer in the customer-oriented make-to-order production environment. In this paper, we propose a quotation change process based on the quotation creation process and propose a consistent and efficient quotation change processing method. To this end, the factors causing the change of quotation were defined, and the types of changes for each factor were defined. And it shows the procedure of applying the quotation change process to the quotation management system through the cases of each cause of the quotation change. In addition, in order to show the usefulness of the quotation change factors, the type of quotation change, the quotation change process, and the quotation system management, the proposed quotation change process and function was applied in the integrated quotation management system for the ship engine division of a typical make-to-order manufacturing company 'H'. As a result, it was confirmed that the proposed quotation change process and management system according to the quotation change factors were efficiently performed.

A Comparative Study on the Nominated Subcontractor (NSC) System of Building Construction Project in Asian Commonwealth of Nations - Focused on the NSC Clause Analysis of Standard Contract Forms - (아시아 지역 영연방국가의 지정하도급(NSC)제도에 관한 비교 연구 - 표준계약약관의 지정하도급자 항목분석을 중심으로 -)

  • Cho, Jaeyong;Kim, Junggon;Park, Hyeonggeun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.12-22
    • /
    • 2014
  • In recent, many Korean contractors have tried to extend their business area into the overseas construction market, mainly as a result of a reduction in their domestic construction market. However in terms of risk, overseas construction projects are likely to face a number of unpredictable problems, many of which occur as a result of differences in contract cultures and construction environments between Korea and other countries. One key issue facing overseas construction projects in particular, is that of sub-contracting and control, and the way in which many countries of Commonwealth of Nations operate a unique subcontracting method well known as a nominated sub-contractor(NSC). This paper introduces the NSC system and differences as comparing among standard construction contract forms, such as JCT, SIA, HKIA and PAM. in UK and Asian Commonwealth of Nations. Also, we attempt to classify the type of the NSC system through the consideration of NSC clauses in accordance with the objection and termination of NSC contracting respectively.