• Title/Summary/Keyword: 프로젝트 환경요인

Search Result 155, Processing Time 0.032 seconds

The Analysis of Features of Project Based Learning in Smart Learning Environment (스마트러닝 환경에서의 프로젝트 학습 전략 및 요인 분석)

  • Kim, Soohwan;Han, Seonkwan
    • Journal of The Korean Association of Information Education
    • /
    • v.17 no.3
    • /
    • pp.243-252
    • /
    • 2013
  • In this paper, we analyzed and suggested an educational strategy and features for project-based learning in smart learning environment. Smart learning environment is different of e-learning environment, therefore the educational strategy for smart learning is needed. In this paper, we conducted project-based learning for elementary school students in smart learning environment, and we analyzed the difference between a normal project-based learning and a project based learning in smart learning environment and suggested the educational strategy and the considerations through questionnaire, interview, and observation, Furthermore, we figured out factors that affected educational satisfaction of student. As a result, students thought that there is difference of smart project-based learning in some factors: technology and devices, software, and participation for learning. Also, we found main factors to affect educational satisfaction are two factors: technology and devices, and always-on.

Risk Factors in the Information System Development Project (정보시스템 개발 프로젝트 리스크요인에 관한 연구)

  • Son, Dong-Ki;Jung, Chul-Yong
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2003.05a
    • /
    • pp.355-362
    • /
    • 2003
  • 정보시스템 개발 프로젝트는 그 속성상 고객, 팀원, 환경등의 요인으로 유일성을 가지고 있어 개발 과정을 체계적으로 관리하기가 매우 힘들고 프로젝트의 대형화, 전문화, 복잡화, 장기화에 따라 더 많은 리스크(risk)요인과 불확실(uncertainty)요인이 존재한다. 따라서 본 연구는 정보시스템 개발 프로젝트의 실패에 영향을 미치는 리스크요인을 도출하고, 리스크요인들의 중요도(위험도)를 측정하기 위한 AHP(Analytical Hierarchy Process) 모델을 제시함으로써 프로젝트 수행 시에 발생할 수 있는 리스크를 관리하고, 실질적인 의사결정도구를 제공하고자 한다.

  • PDF

An Approach to eIT Project Management using Entropy Model (엔트로피에의한 e비즈니스 IT 프로젝트 관리 모형의 개발)

  • Jeong, Gi-Ho
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2002.06a
    • /
    • pp.63-69
    • /
    • 2002
  • 최근의 정보시스템 업체들은 e비즈니스 분야의 IT프로젝트로 특수를 누리고 있다. 이런 새로운 분야의 IT프로젝트는 급변하는 기술의 추세와 연봉제로 활성화된 인력의 이동이라는 어려운 관리적 요인들을 접하고 있다. 즉, 단지 재무적 관점뿐만 아니라 시간적, 자원적, 품질적, 그리고 새로운 환경에 적웅해야하는 위험적 요인등 그 관리요소가 증가하고 있다. 그래서 프로젝트조직이나 관련기업의 경우 eIT분야의 프로젝트를 관리하기 위한 새로운 개념이나 방법론의 개발이 요구되고 있는 실정이다. 이에 본 논문에서는 최근의 정보시스템 업체들이 직면하고 있는 프로젝트관리의 어려운 점을 살펴보고, e비즈니스 환경의 정보기술프로젝트의 환경적 특성을 고려한 프로젝트 관리의 새로운 접근법을 엔트로피 이론에 기반 하여 설명하였다. 그리고 마지막으로 사례에 근거한 예제를 제시하여 엔트로피에 의한 프로젝트관리의 적용가능성을 제시하였다.

  • PDF

The Analysis of Structural Relationships between Project Leader' Core Competencies and Project Success Factors (프로젝트 리더의 핵심역량과 프로젝트 성공요인간의 구조적 인과관계 분석)

  • Lee, Seol-bin;Roh, Doo-Hwan;Jung, Woon-Ho
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.11 no.2
    • /
    • pp.197-205
    • /
    • 2016
  • This study is intended to look into the effects of project leader's core competencies(intellectual ability, management ability, emotional ability) on the Critical success factors(job satisfaction, organizational commitment, group cohesion) of project by environmental variables of organization. The results of this study were summarized as follows. First, the intellectual ability, management ability and emotional ability had a significant effect on the job satisfaction, organizational commitment and group cohesion. Second, the functional organization and project organization had a partial effect on project leader's core competencies. But the individual-centered organization had no moderating effect. For the project organization, all intellectual ability, management ability and emotional ability had a moderating effect on the organizational commitment. Consequently, project leader's core competencies are mechanisms to improve the job satisfaction, organizational commitment and group cohesion, and they have a different moderating effect according to the type of organization.

  • PDF

Research on Applying Project Time and Scope Factors to Project Risk and Cost Affect (IT 프로젝트의 범위, 일정 관련 요인이 프로젝트 비용과 위기에 미치는 영향에 관한 사례연구)

  • Lee, Moon-Sun;Kang, Dongsu;Lee, Seouk-Joo;Baik, Doo-Kwan
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2010.04a
    • /
    • pp.962-965
    • /
    • 2010
  • 경영환경 변화에 따라 IT 프로젝트는 수행 규모와 복잡성이 매우 증대하였고 다양한 구성 요소들이 개발, 통합하게 되면서 프로젝트의 위험 요인들이 기하급수적으로 증가하게 되어 프로젝트의 성공과 실패에 영향을 미치고 있다. 본 연구에서는 실제 IT 서비스를 제공하는 대형 SI 업체의 프로젝트 사례 분석을 통해 범위의 변동이 일정에 미치는 영향, 범위의 변동이 비용에 미치는 영향에 대해 조사, 분석 하고, 아울러 범위, 일정의 변동에 따라 발주기관과 연도별 변동성도 연구하고자 한다. 이를 위해 프로젝트 수행 관련 데이터를 수집하고, 통계적 방법에 의해 각 요인들의 영향을 분석하였다. 이러한 분석결과는 프로젝트의 범위의 변동이 프로젝트에 미치는 위험의 관리 허용 한계를 제시하여 프로젝트의 성공을 도모하고자 한다.

Project Management Risk Features between Information System Project and Commercial Packages (프로젝트 위기관리와 상용패키지의 위기관리 특성에 관한 연구)

  • Lee, Hyun Sun;Lee, Seouk-Joo
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2015.04a
    • /
    • pp.553-556
    • /
    • 2015
  • 정보시스템 구축 프로젝트 환경이 다양해지면서 다양한 소프트웨어 및 하드웨어의 도입이 검토되고 있다. 환경의 다양성이 증가함에 따라 프로젝트의 위험요소들이 늘어남에 따라, 프로젝트 성공을 위해 프로젝트 전반에 걸친 위험요소에 대한 관심이 높아지고 있다. 기존 프로젝트관리 측면에서의 위험요인에 대한 연구는 지속적으로 있어왔으나, 소프트웨어 관점에서의 위험요소에 대한 연구는 그 동안 부족했다고 판단, 기존 프로젝트 위험요소 정의를 기반으로 소프트웨어에서 정의된 위험관리요소에 대한 재정의를 통해 소프트웨어에 대한 위험요소 정의의 타당성에 대해 확인해 보고자 한다.

A Development of Project Performance Predicting System(PPS) considering Construction Project Characteristics (건축 프로젝트의 특성을 고려한 성과 난이도 예측 시스템 개발)

  • Ko, Young-Jin;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.62-72
    • /
    • 2011
  • Currently, The failure of construction project is increasing to be caused by a changing construction environment. According to this circumstances, Researches of project success factors affecting performance have been presented to develop strategies for efficient construction project management in the construction industry. However, Conducting efficient construction project management is difficult because project manager could not know which project success factors can be improved or not. Especially, although the project characteristics were derived the level of difficulty for performance, research of the project characteristics which could not be improved as influence factor to performance is lacking. Therefore, This paper has developed the Performance Predicting System(PPS) with Fuzzy set theory to establish. PPS has been developed to establish efficient project management strategies and to save time and effort. As Contractor inputs the project characteristics, PPS can predict the level of difficulty of performance.

The Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects (공동주택 건설공사의 발주방식 영향요인 분석)

  • Moon, Hyun-Seok;Hong, Tae-Hoon;Koo, Gyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.75-84
    • /
    • 2008
  • Recently, construction industry demands have been changed by domestic construction circumstances such as high-technology, mega-projects, and the complexity of construction. In order to deal with the change of such a domestic construction circumstances, the Ministry of Construction and Transportation (MOCT) has introduced advanced delivery methods. However, the advantages and disadvantages of the advanced delivery methods have not been effectively applied for previous projects. The reason for this is that the "Reviewing Standard for the Large-scale Construction Bidding Method" has not reflected enough prcject characteristics when the delivery method is selected in the project planning phase. Therefore, this paper proposes the Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects.

Analysis of ERP(Enterprise Resource Planning) Implementation and Project Critical Sucess Factor (ERP구축과 프로젝트 구성 성공요인 분석)

  • Kim, Dong-Il;Choi, Seung-Il
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.11
    • /
    • pp.4770-4777
    • /
    • 2011
  • Recently a rapidly changing business environment, business strong ability and operating an integrated information system is actively made. However, the result of the success factors affecting the overall project, but a study to analyze the project's success is not enough. In this study, the project implementation and operation of the critical success factors that can occur in the analysis of research and practice leading to the combination of variables derived from empirical studies find and isolate the success factors were over. Present study came from existing projects that can be the integrated system, representation factors affecting the implementation and operation of business processes in order to analyze the elements and procedures, performance capabilities of the organization, consultants and professionals involved with other related variables were analyzed by injecting. In this study, the consultants and experts showed that the variables are very significant rather than the organization's ability to perform business processes and procedures. This study will give a guideline as future success factors for building an integrated system of professional experiences.

A Model to Decide the Approach to Build Data Warehouse considering Project′s Environmental Factors (프로젝트 환경요인을 고려한 Data Warehouse 구축방법의 선택모형)

  • 노규성;윤재희
    • Proceedings of the Korea Database Society Conference
    • /
    • 1999.06a
    • /
    • pp.403-413
    • /
    • 1999
  • Today's businesses are experiencing intensive global competition and the most accelerating pace of change ever. Competitors have sprung up that were not even on the business's radar. This environment impacts all decisions and strategies as business try to dominate their market or their industry merely to survive. So recently most of organizations are considering on building the data warehouse system to pursuit the business intelligence. We need the proper model to guide the approach to plan building data warehouse system when we want to plan it in considering the organizational status. Therefore we suggest a model to decide the approach to build data warehouse considering the project's environmental factors. First we review Ronald S. Swift(1998)'s five environmental factors that we have to consider when planing to build data warehouse. Then we propose a model to decide DW approach by the degree of those factors to be measured. DW approaches in this model are classified in conservative approach, technological approach, increasing approach. enterprise- wide approach, and ideal approach.

  • PDF