Hypotheses Analysis about the Efficacy of University-Industry Collaboration In the Field of Information Technology -The Case of IT Mentoring System- (정보통신분야 산학협력 효과성에 대한 영향요인 분석 -IT 멘토링 사례중심으로-)

  • Lee, Jung-Mann;Ihm, Seung-Ho;Hwang, Gyu-He;Lee, Jin-Suk
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.8
    • /
    • pp.342-352
    • /
    • 2011
  • This study is to verify hypotheses about the efficacy and success factors of the IT Mentor project(in which 524 students participated) which is one of the most best practices in Korea. The empirical results found that all the aspects of students, industrial experts, professors, support programs and other infrastructure have certain influences on the industry-academia cooperation. In addition, logit regression model was employed to investigate the efficacy factors of industry and university's satisfaction to IT mentor system. It showed that industry's satisfaction depends on students' participation in company's projects and students' improvements of major competence.

A SOA-based Application Model for Building Intelligent Construction Supply Chain Management Framework (지능형 건설물류관리 체계 구축을 위한 SOA 적용 모델 개발)

  • Shin, Tae-Hong;Chin, Sang-Yoon;Yoon, Su-Won;Kwon, Soon-Wook;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.733-737
    • /
    • 2008
  • Construction supply chain management focused on materials in construction industry plays a critical role which controls the success and failure of a project. For the efficiency of construction supply chain management, the framework which provides project participants with the information originated from whole construction logistics steps without the omission and discontinuation of information flow is required. The new management framework that can support this environment is necessary because of setting up the complicated and distributed environment including logistics information management by intelligent equipment, co-working management with pre-framework legacy system and various devices(UMPC and PDA etc.) as the information confirmation and electrical transmission tool between the project participants different from former construction supply chain management environment while recently developing ubiquitous technologies such as RFID/USN and intelligent equipment to support logistics process. Therefore, the objective of this study is to introduce the concept of SOA (Service Oriented Architecture) as an alternative of effective information integration under the complex and distributed environment and to propose the SOA-based application model for building intelligent construction supply chain management framework.

  • PDF

Kingdon의 다중흐름모형을 활용한 연구개발 정책혁신 과정 분석 : 국가전략프로젝트에 대한 예산심의·의결을 중심으로

  • Kim, Ju-Hui
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 2017.11a
    • /
    • pp.515-534
    • /
    • 2017
  • 본 연구는 Kingdon의 다중흐름모형(MSF: Multiple Stream Framework)을 통하여 정부연구개발예산 중 미래성장동력 부문에 대한 예산결정 과정을 살펴보았다. 연구 대상은 대통령 의지로 의제가 발기된 정책의제 국가전략프로젝트이며 비합리적 의사결정에 대한 견제수단으로 활용되는 예비타당성조사가 예산의 결정단계로 이어지는 일련의 과정을 살펴보았다. 연구의의는 3개 흐름에서 행해지는 비합리적 의사결정 케이스를 확인하고, 정부 R&D 사업의 예산결정과정에서 온-오프 스위치 역할을 하고 있는 게이트 키퍼(gate keeper)인 사업 평가자(PM), 구체적 사업계획안을 만드는 부처의 사업기획자, 그리고 자문역할을 하는 전문가집단을 정책혁신가로 바라볼 수 있다는 의의를 발견했다. 공공부문의 정책혁신가는 사업을 기획한 부처와 같이 자기(부처)이익을 추구하지는 않지만 공공가치를 추구하는 독립적인 위치에 있었고, 어느 일면에는 과학기술분야의 성장과 발전을 바라고 있었다. 다시 말해, 연구는 정책혁신가라는 존재가 특정한 개인 또는 집단일 뿐만 아니라 2개 집단 이상의 복수의 정책혁신가가 있을 수 있는 가능성을 확인하였다. 특히, 예비타당성조사에서 PM이 흐름 간의 중개를 상향적 직접적으로 수행하지 않지만, 하향적으로 사업기획자 등 주체들 간 의견을 조정하고 합의를 이끌어 내는 모습은 중요 활동을 하고 있음이 확인되었다. 연구는 정책혁신가의 새로운 형태를 발견하였지만, 정책결정의 전 주기가 아닌 정부예산 이후 국회예산이라는 특정 시기를 대상으로 하였는데, 분석 과정에서 예산과 시간의 제약으로 사업기획을 담당했던 부처 및 기재부공무원, 해당기술 분야 연구자, 국회 관계자 등 관련 주체들의 견해를 고루 담아내지 못한 아쉬움이 있다. 향후 다양한 참여자들의 의견을 수렴할 수 있다면 정책 결정 과정에 정책혁신가의 다층적(Multiple) 존재 여부와 특성을 면밀히 들여다 볼 수 있을 것이다.

  • PDF

Constitution of Work Process for Apartment Renovation Project in Design Phase (공동주택 리모델링 설계단계에서의 사업수행 프로세스 구축)

  • Kwon, Won;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.167-175
    • /
    • 2007
  • A renovation project of apartment housing is generally divided into four stages: Project inquiry stage, planning and feasibility stage, design stage and construction stage. Currently, procedure and managerial technique for a remodeling project has not been systematically established so that many companies have difficulty in doing their business. In particular, the design stage in participant which a project managers, designers, residents and engineers is more complicate than the other stages in terms of roles and working procedure. The design documents can be found trial and error if it is not well managed. The insufficient design caused by lack of ability to efficiently utilize information obtained during the stage and inappropriate decision-making not only results in diverse problems in the construction stage but also makes people suspect satisfaction and reliability on the remodeling improvements. Therefore the design stage is very significant issue on the renovation project. As the consequence, the design stage of a remodeling project is so important that it should be carefully managed, and composite understanding of the process to be executed. To do this, we provide roles and responsibility of each participant in the design stage and analyze the process where information is utilized in design stage. The information is analyzed in terms of input, tool and output.

Development of Program Management Information Systems for Urban Renewal (도심 재생 종합 사업관리 시스템의 개념 및 개발)

  • Choi, Hye-Mi;Kim, Ju-Hyung;Lee, Sung-Bok
    • Land and Housing Review
    • /
    • v.1 no.1
    • /
    • pp.9-17
    • /
    • 2010
  • Due to the variety of processes that are mainly influenced by the modification of law and regulations, it is difficult to propose a formal procedure of urban renewal projects. In addition, conflicts among various participants and stake-holders have made urban renewal difficult to manage. Needs for new systems to support management of this type of projects have been raised. This system should enable users to manage program aspects as well as projects given that the urban renewal consists of several projects. According to analysis of current context, the requirements of the system are classified as follows: a method to create flexible systems to cope with various process; functions to provide data on cost and schedule; user-friendly visualized tools enhancing understand of non-experts or less-experienced participants. This paper summarizes the background, requirements, concept and model of the system. Currently, prototype systems have been developed. Regarding outputs presented so far, potential benefits of the system are presented as well.

A Study on Schedule Management in Construction Project Using the Dependency Structure Matrix(DSM) (DSM을 이용한 건설사업 공정관리에 관한 연구)

  • Jang, Se-Hoon;Park, Moon-Seo;Lee, Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.682-686
    • /
    • 2007
  • Construction project has been more complex and bigger as various demands of the times. But current schedule management method in construction project uses only PERT or CPM made in 1950s without innovation. Also current schedule management focuses on not information flow between activities and variability of information exchanged but result. This paper suggest using the DSM(Dependency Structure Matrix) in schedule management of construction project to overcome limitations of current scheduling tools. DSM has been introduced as a new theory in construction industry in 1990s at the United States, but its application is still insufficient in domestic field due to the absence of systematic study.

  • PDF

A Study on the Application of Information Classification for Integration of Construction Information in Construction Phase (시공단계의 건설정보 통합을 위한 분류체계 적용에 관한 연구)

  • Kim Jin-Young;Kim Yong-Gu;Han Choong-Hee;Kim Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.450-455
    • /
    • 2002
  • Construction market situation has been changed quickly in the 21st century. One is a large variety of information, the other is the development of IT technology among the rest of the change. Accordingly, it is very important that information is managed systematically and made good use of broadly in proportion to the increase of information volume. Therefore, the purpose of this study is to propose a applicable classification system in the construction phase. First of all, the Construction Information Classification proposed by the government is studied to apply the actual work and to build a applicable construction information classification for construction project. A base of the applicable classification system is the Construction Information Classification, SMM and Materials classification(Public Procurement Service). The applicable classification system to control and manage the construction information is consist of the 4 types : Facility classification, Element classification, Work classification, Resource classification (Materials, Equipment, Labor).

  • PDF

Development of a 4D Information based Integrated Management System for Geothermal Power Plant Drilling Project (지열발전 시추프로젝트의 4D 정보화기반 통합관리 시스템 개발)

  • Lee, Seung Soo;Kim, Kwang Yeom;Shin, Hyu-Soung
    • Tunnel and Underground Space
    • /
    • v.24 no.3
    • /
    • pp.234-242
    • /
    • 2014
  • Deep drilling project should be managed systematically and efficiently because it is significantly influenced by various related factors having uncertainty and high risk in terms of economy and effective management. In particular, drilling project involves participants from various sectors including necessary service company and it also needs their collaboration by sharing related information occurring at drilling process in order to secure efficient performance management. We developed 4D (3D + time) information based visualization system for progress management by combining 3D design model and predicted optimized control parameters for each section in geothermal well design. We also applied PDM (precedence diagramming method) to the system in order to setup the effective process model and hooked it up to 3D information based on precedence relation and required time for informatized process network.

A Study on Open Source Transition Strategy of Record System (기록시스템의 오픈소스화 전략 연구)

  • An, Dae-jin;Yim, Jin-hee
    • The Korean Journal of Archival Studies
    • /
    • no.52
    • /
    • pp.119-170
    • /
    • 2017
  • This study aims to analyze the environment for the open-source records system and to identify the risk and requirements for the success of the strategy in Korea. For this, Chapter 2 presented a review of the strategic benefits of open source to public organizations, developers, and users. It also discussed the process of cooperatively developing and releasing the source code and the technology infrastructure supporting open source. In Chapter 3, six representative open-source projects in the field of records management were selected, and case studies were conducted. To derive comprehensive implications, we have divided the main development body of open-source projects into international organizations, international cooperation systems, national archives, and software development companies. We also analyzed the background and purpose of each project, the agents of development and funding, the governance model, the development period and cost, the business model and software architecture, the community composition, and the licensing strategy. Through this, we have derived four critical success factors. In terms of technology, a component-based design was required; therefore, we proposed a microservice architecture and a model-view-controller design pattern. Next, it was necessary to reestablish system requirements of records center and archives. Moreover, we also proposed a dual licensing strategy to allow developers to easily participate in open-source projects. Lastly, we emphasized a strong governance structure and an effective cooperation framework to create a sustainable community. For a record system to be open-source successfully in an organization-centered market, the roles of software developers and end users should be exercised more in the community. To achieve this, it is important to build various collaborative tools and development infrastructure from a planning stage to a centralized one.

Appropriate Roles of Project Participants for Public Partnership Projects of Railways through the Organizational Behavior Theory (조직행동론을 통해서 본 민간철도 투자사업의 참여자간 갈등유형 및 역할정립 방안에 관한 사례연구)

  • Kim, Byungil;Yun, Sungmin;Han, Seung Heon;Kim, Hyung Hwe
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6D
    • /
    • pp.839-847
    • /
    • 2008
  • No proper system exists for private investment projects, and efficient project management is not being achieved due to entanglements of management. Recognizing these circumstances, this paper has diagnosed the hard facts that project management organizations and systems are facing, and presented solutions to the factors that are obstructing the establishment of efficient project management system. This paper carried out focus group interviews on the experts who had participated in the Incheon International Airport Railway construction project, using the methodology of an exploratory case study. The results were systematically analyzed according to organizational behavior and causes corresponding to each of the problems were deduced. Private investment projects were divided into task environments and project organizations based on social science methodology and analyzed, and a final improvement plan for each participating organization was presented. An improvement plan was presented, and it was compared with the case study of Incheon bridge construction project, which is recognized as a model of successful project management, and its appropriateness evaluated.