• Title/Summary/Keyword: 프로젝트 리스크 관리

Search Result 182, Processing Time 0.019 seconds

A Study on the Quantitative Risk Level Calculation Model in Cooperation with the Reserve Fund (예비비와 연계한 정량적 리스크 수준 산정 모델에 관한 연구)

  • Kwoak, Song-Hae;Park, Koo-Rack;Kim, Dong-Hyun
    • Journal of Digital Convergence
    • /
    • v.14 no.10
    • /
    • pp.159-166
    • /
    • 2016
  • Recent public information project, which has been organized mainly to large companies is a situation that is being reorganized to small and medium-sized systems integration company. However, many of the small and medium-sized companies lack knowledge of the systematic risk management. Thus, in connection with the revenue, it involves a number of problems. Therefore, in this paper, we present a risk element that occurs mainly in the field of the project, providing a model for measuring the risk element by risk level costs associated with this. Through the convergence, we aim at providing a management system that is able to make the project successfully accomplished, predicting the risk that occurs in advance to pursue the project; Based on the proposed model, it is possible to secure a proper size of reserve fund so it is expected to enable companies to ensure the cost of risk analysis.

ROI Using Risk Management and Statistical Analysis of Cost-error (리스크 관리를 통한 ROI 와 비용 오차의 통계적 분석)

  • Shin, Byung-Ho;Kim, Kyong-Hwan;Kojima, Tsutomu;Lee, Sang-Bum
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2005.11a
    • /
    • pp.381-384
    • /
    • 2005
  • 소프트웨어의 사용영역이 확대되고 개발 규모가 거대화되고 복잡해 짐에 따라 소프트웨어의 품질과 생산성이 중요해지고 있다. 이러한 상황에서 프로젝트의 리스크를 식별하고 그에 따른 파장을 최소화하는 리스크 관리는 소프트웨어 개발 프로세스의 핵심 관리 기술로 부상하고 있다. 본 논문에서는 기존의 소프트웨어 개발 관리 프레임 워크 상의 리스크 관리를 연구하여 보다 정형화된 리스크 관리 프로세스를 제안하고, 그에 따른 비즈니스상의 효과를 보여준다. 또한 리스크 요인과 프로젝트 혼란 사이의 통계적 예측 식을 제시한다.

  • PDF

Analysis and Quantitative Estimation of Risk Factors of Design-Build (턴키 프로젝트에서 리스크요인 분석 및 정량적 평가)

  • Oh, Guk-Yeol;Lee, Young-Dai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.12-24
    • /
    • 2012
  • The Risks in undertaking a construction project comes from many sources and often involves many participants in the project. This study has identified various kinds of risks, assessed the risk factors quantitatively and suggested risk management method for response pertinent in Design Build(Turn Key)type of projects in Korean context. A questionnaire was designed comprising of 145 possible risks in all types of construction projects. The population from owner, consultant and contractor groups was asked to indicate the risks applicable in DB projects. 25 numbers of critical risks in DB projects were identified and further analyzed for reveling inherent relationship between them through factor analysis. Factor analysis revealed 8 risk factors in DB projects. Construction site related, contract related and design related risk factor consisted about 72% of total risk weight. It has been found out about 6%, while considering the mutual dependency, it is about 10% of total cost of DB project. Therefore, It is suggested that 6% to 10% of construction amount as contingency has to be made provision for risk responses in the DB projects.

The Development and Application of Schedule Management Tools in Building Construction (건설 공정리스크 관리도구 개발 및 활용방안)

  • Jung Woo-Joon;Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.384-387
    • /
    • 2004
  • It is very important to manage the risk in building construction because construction process has too many internal risk compared with others. So construction managers need more developed risk management system than the Present. While the study for the solution and management of generated risk is comparatively enough, the effort to confirm the risk of construction phase on pre-construction phase haying an major effect on total duration, is insufficient. For supporting the schedule risk management of pre-construction, this study suggests the reclassified risk breakdown structure and the investigation form for advance preparations on pre-construction Phase, which help the Poorly experienced construction manager to make more correct decisions and efficiently to execute risk management.

  • PDF

Development Acceptable Risk Model for International Construction Projects - Focusing on Small and Medium Construction Companies - (해외 건설 다수 프로젝트 관리를 위한 허용리스크 도출 - 중소·중견 건설기업 관점에서 -)

  • Hwang, Geunouk;Park, Chan Young;Jang, Woosiki;Han, Seung Heon;Kang, Sin Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.90-97
    • /
    • 2016
  • Since Korean construction firms have steadily advanced into the international market, small and medium construction companies (SMCCs) have also advanced in such market. SMCCs's recent trend have clearly shown the changes of contract types from single subcontractor projects to multiple general contracting projects. However, among those multiple projects performed by SMCCs, 1 out of 3 projects were deficit projects that impact the overall pe rformance of the firm. To increase such performance, risk management for in international construction must be managed at the enterprise level for SMCCs. This research aims to create a multiple project management model for SMCCS that employs the concept of acceptable risk to assess the limit risk level for corporation to acceptable. Using the accumulated data from previous survey and International Construction Association of Korea (ICAK), integrated risk of each firm and their profitability of each project are analyzed. Through the analysis, each firm's acceptable risk level is derived. Through the two research steps, acceptable risk algorithm was developed based on corporate integrated risk and profit correlation. To prove the acceptable algorithm relevance, financial statement analysis of 3 corporation was derived that level of acceptable risk and financial statement were available. Through the approach, this research allows the firms to analyze the firm's capability and find projects that suits the firm's situation and capability.

Blog-based Schedule Risk Management System (블로그 기반 공정리스크 관리시스템)

  • Jin, Soo-Myeong;Yoon, You-Sang;Jang, Myung-Hoon;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.47-56
    • /
    • 2009
  • As contemporary society becomes information-oriented, major construction companies have recently invested in information management, but small and medium ones have not. Though the small and medium companies recognize the information management is necessary and important, they don't have an ability to possess technical expertises. The purpose of this study is to develop a Schedule Risk Control System based on blogs using IT and web technologies for construction managers in small and medium construction companies. The system makes a chance to identify risk factors and prepare for responses to settle risks happened in preconstruction phases, and enables the managers and headquarters to predict and handle schedule risks by sharing information about risks on the blogs.

A Study on the Risk Assessment Methodology and Application for International Plants Construction (해외 플랜트 공사 리스크 평가 방안 및 적용에 관한 연구)

  • An, Sung-Hoon;Lee, Young-Nam;Jo, Ho-Kyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.134-142
    • /
    • 2008
  • Recently, international plants construction markets are expending. Specially, oil/gas plants constructions in Middle-East are booming. However, international plants construction projects are high risky. So a risk assessments and managements methodology for international plants construction is needed. In this study, the risk assessment methodology for international plants construction is proposed on the basis of the literature review in the international construction risk assessment methods and the knowledge of experts explored by interview. In addition, case study in Middle East was applied for reviewing these risk assessments and managements methodology for international plants construction.

A Study on BIM based Process Risk Management Model (BIM 기반의 프로젝트 단계별 리스크관리 모델에 관한 연구)

  • Jeon, Seung-Ho;Choi, Myung-Seok;Lee, Joo-Ho
    • Journal of Korean Society of societal Security
    • /
    • v.3 no.1
    • /
    • pp.61-66
    • /
    • 2010
  • Recently a construction industry introduces information technology that brings about many advantages in the early planning phase, design phase and construction phase. Nevertheless a BIM has a many benefits, it has limits which are not only usually using 3D modeling but also limit of making full use of practical affairs because of a lack of connecting varietals of progress of work. To solve these uppermost limits, this research is presenting unified systems to use in risk management which are efficient management of space and non-space information, space analysis.

  • PDF

Virtual Construction System for Visualizing Risk Management Information (건설공사 리스크관리기법의 가상건설시스템 연동 방법론 연구)

  • Kim, Hyeon-Seung;Park, Jin-Jung;Park, Nam-Jin;Choi, Gwang-Yeol;Seo, Hwa-Jin;Kang, Leen-Seok
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.77-80
    • /
    • 2010
  • 최근 건설 프로젝트의 대형화 및 다양한 신공법들의 도입으로 불확실한 위험도 요인들이 점점 증가함으로써 일련의 시스템적 절차에 따른 리스크관리 (Risk Management)체계와 프로젝트 참여자들간의 효율적인 정보전달 방안이 요구되고 있다. 이를 위해 본 연구에서는 '리스크 시각화 시뮬레이션 구축 방법론'을 제시한다. 이는 최근 각종공사 정보 시각화부분에서 주목받고 있는 4D CAD 기술과 리스크 분석을 시스템적인 절차로 구성하여 연계한 방법이다. 시스템적 리스크 분석 절차는 리스크관리기법인 AHP 및 퍼지 분석기법을 동시에 적용하여 합리적인 리스크 정량화를 수행할 수 있도록 구성하였다. 그리고 이로부터 산출된 리스크 요인별 위험정도는 WBS 코드체계 기반으로 4D CAD의 공종과 연계되어 리스크 정도 수준에 따라 설정된 색상으로 시뮬레이션이 구현되도록 구성하였다. 이러한 방법론은 IDEF0 모델링 기법으로 제시함으로써 향후 시스템 구축의 기초 자료로 활용할 수 있도록 하였다.

  • PDF