Jaewoong Hwang;Heetaek Yoon;Junhyun Bae;Youngkon Park
Land and Housing Review
/
v.15
no.2
/
pp.125-137
/
2024
A conventional Design for Safety (DfS), introduced to eliminate potential hazards in the design phase proactively, has encountered persistent challenges, such as perfunctory risk assessments and hazard identifications based on 2D drawings and inefficient workflow processes. This study proposes a BIM-based approach to Design for Safety (DfS) to address the limitations of conventional methods, aiming to enhance efficiency and achieve practical safety management benefits. The proposed workflow process for BIM-based DfS has been refined and validated for on-site applicability through various case studies, including risk assessments during the design phase and field applications for safety management activities during the construction phase. Specifically, the critical process of risk assessment within the DfS methodology has also been transitioned to a BIM-based approach. This BIM-based risk assessment process has been evaluated through case studies, encompassing safety reviews for structural design, construction equipment operation, and construction methodology with sequence in design projects. Additionally, the proposed BIM-based DfS has demonstrated exceptional on-site applicability and efficiency, as validated by the application of a BIM deliverable embedded in DfS information for CDE-based daily activity briefing, VR-based safety training, AR-based mitigation measures inspections, and other safety management activities in the construction phase.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.261-266
/
2001
Recently, remodeling has been introduced in the domestic construction industry as an alternative new construction. Its economic evaluation is the essential part of remodeling business. Therefore, this study has the purpose of presenting the method that is able to evaluate the actual value in the market. And this method can compare before & after value of remodeling in feasibility study. For this, this study reviews economic evaluation methods in construction and real estate fields and analysis their problem and merits & faults. With those facts, this study makes a mixed economic evaluation method that can be used in construction and real estate fields.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2010.10a
/
pp.91-93
/
2010
부두의 접안능력 조정 가능성을 판단하기 위해서는 조정예상 가능한 선형을 대상으로 항만시스템의 전반적인 부분에 대한 검토가 필요하다. 이 중 선형 증가에 따른 통항 및 접안조종 안전성의 평가는 부두의 접안능력 조정 가능성을 판단하기 위한 중요한 역할을 한다. 이 연구에서는 광양항 제품부두의 접안조종 안전성의 평가를 위해 선박조종 시뮬레이션을 수행하여 검토하였다.
방사성 폐기물 처분장의 건설에 가장 중요한 부분중의 하나는 처분안전성의 확보일 것이다. 처분장 안전성평가는 처분장이 입지하는 환경에 대한 실험실적 자료 또는 현장 자료의 충분한 데이타베이스와 처분시스템에서 일어날 수 있는 주요한 프로세스를 기술하는 수학적 모델을 통하여 이루어지게 된다. 처분시스템의 기본적인 기능은 처분된 폐기물고화체를 인간환경으로 부터 완벽하게 고립시켜 처분장내에 영구적으로 격리시키는 것이다. 그렇지만 정상적이든 비정상적이든 핵종은 항상 유출될 가능성이 있고 설사 이러한 경우라도 충분히 안전한 것을 입증하는 것이 처분장 성능 평가와 안전성평가의 주요한 목적이 된다. 한편 장기간에 걸친 처분 안전성 평가는 전산 프로그램을 통한 이론적 예측에 의해서만 가능하므로, 처분안전성 평가도구의 개발 및 확보의 중요성은 매우 크다고 할 수 있다. 이 연구에서는 처분장이 입지하는 암반 매질에서의 핵종의 이동을 기술할 수 있는 여러 모델을 검토하고, 특정 처분부지에 대한 종합적 안전성 평가를 수행할 수 있는 방법론을 제시할 목적으로 임의의 1개 부지의 지형도및 추정가능한 지질관련 자료를 이용하여 해당 부지에 대한 가상의 핵종 유출 시나리오를 설정하여 부지특성적인 예비 종합 안전성 평가를 수행하여 보았다.
Proceedings of the Korea Water Resources Association Conference
/
2011.05a
/
pp.299-303
/
2011
사전재해영향성검토 협의제도는 개발로 인해 발생할 수 있는 재해유발 요인을 사전에 검토하여 이를 사전에 제거하는 것이 목적이다. 사전재해영향성 검토는 1996년부터 시행한 재해영향평가의 한계점을 보완하기 위하여, 2005년 개정된 자연재해대책법에서는 사전재해영향성 검토협의제도를 포함하였으며, 2005년 8월 17일 동법 시행령을 개정 공포하여 사전재해영향성검토 협의제도를 본격적으로 시행하게 되었다. 본고에서는 사업 대상 지구를 "부산장안지구 택지개발사업(1단계)"로 선정하였으며, 개발에 따른 재해 발생요인, 즉 유출량 증가에 따른 하류부의 홍수피해 가중, 토공 공사에 따른 토사유출량 증가, 절 성토계획 따라 유발되는 사면의 불안정에 대한 사전검토를 목적으로 하였다. 사업시행에 따른 개발중 토사유출량의 증가와, 개발후 홍수유출량의 증가로 재해의 위험이 예상되어 개발 중의 임시저류지 겸 침사지 2개소와 개발 후의 영구저류지 1개소를 계획하여 홍수유출량을 $2.48m^3/sec$을 줄이고, 토사유출을 90% 포착하였다.
Proceedings of the Korea Water Resources Association Conference
/
2007.05a
/
pp.383-387
/
2007
본 연구에서는 저류지 예비설계를 위해 제안된 다양한 모형의 수문학적 특성을 비교하고, 재해영향평가 실무지침서 등과 같은 국내 설계기준에 의하여 설계된 저류지 용량을 기준으로 저류지 홍수조절용량 결정의 적정성을 검토하였다. SCS 모형 등 총 9가지 모형을 대상으로 비교한 결과 Wycoff and Sing 모형, Baker 모형, Kessler and Diskin 모형과 Currey and Akan 모형 4가지의 적용결과와 국내 방식으로 산정된 저류지 용량의 상관성은 89.7%로 높게 나타났다. 또한 홍수조절용량 $15,000m^3$이하에서 특히 상관성이 높게 나타나 상기 모형들을 소규모 저류지 시설을 계획하기 위한 초기 가정치 또는 기존에 설치된 저류지 시설들의 용량 평가목적으로 활용할 수 있을 것으로 판단되었다. 또한, 국내에서 주로 설치되고 있는 저류지의 특성을 반영하여 추가로 적용성이 높은 방법을 도출할 경우 행정계획단계의 사전재해영향성검토나 소규모 개발사업 등에서 저류지의 홍수조절용량의 예비설계 목적으로 활용할 수 있으리라 판단된다.
TBM 터널굴진시 공법적합성을 평가하기 위한 현장조사 및 물리탐사와 세부지질조사를 수행하였다. 해당지역은 부산시 진구 가야동과 동구 수정동이며 인근 수원지인 덕정정수장에서 생산하는 수돗물을 수정산 배수지까지 확대 공급함으로서 송수공급 계통의 이원화로 안정적인 수돗물공급을 수행하기 위한 배수지터널이다. 이론적으로 굴착속도는 암반의 반발경도, 일축압축강도, 석영함량 및 각종 지질특성에 의하여 좌우되는데, 실지 시공에 있어서는 현장여건상 지질조건이나 일축압축강도등 한정된 자료들을 토대로 시공에 임할 수밖에 없다. 이러한 한계를 극복하기 위한 모형개발을 목표로 본 연구에서는 다양한 현장시험을 토대로 한 TBM 굴진 적합성을 검토하고자 하였다. 국내 시공경험상 및 지질특성만을 고려 할 때 본 과업구간의 TBM 적용성은 양호할 것으로 판단하였으나, 뚜렷한 근거에 의거하지 않은 설계는 시공단계에서 엄청난 손실을 야기하게 되므로 보다 상세한 검토를 수행하게 되었다. 본 연구에서는 TBM 공법선정의 적합성을 검토하기 각종 조사 자료들을 정리하였고, 국내시험의 한계점들을 극복하기 위한 적합한 모형개발의 필요성을 제시하고자 하였다.
최근 논란이 되고 있는 새만금간척사업에 대한 환경영향평가서를 최초 작성할 당시는 갯벌의 가치를 사업의 편익에 포함시키지 않았으나, 이후 환경단체에서는 새롭게 부각된 갯벌의 기능과 가치를 포함시켜 경제성 분석을 다시 할 것을 주장하였다. 이 자료에서는 지금까지 발표된 갯벌과 논의 가치 비교와 새만금사업의 경제성 분석을 검토하였다. 갯벌의 가치에 대하여 금전적인 평가를 한다는 것은 주관적인 요소가 개입하게 되므로 여전히 학자 간에도 의견이 일치하지 않으며 경제성 분석에 포함할 항목에 대해서도 합의가 이루어지고 있지 않아서 일반인에게는 매우 혼란스럽기만 한다. 새만금사업환경영향공동조사단의 공동조사에서는 우리나라 최초로 갯벌의 정화능력 실험과 설문조사를 통한 갯벌의 가치 평가를 시도하였다. 그러나 연구자가 검토한 결과 새만금사업 편익 총액의 51%를 차지하는 국토확장효과가 과대하게 평가되고 농산물 증산액과 논의 공익가치 역시 과대하게 평가되어 경제성 평가를 왜곡시켰다고 판단된다. 갯벌의 기능과 가치에 대한 평가는 앞으로 객관적인 연구결과에 의존해야 하며 환경학계의 검증을 거치는 작업이 필요하다고 본다.
Kim, Sang-Seok;Jang, Yong-Gu;Yang, Seung-Tae;Kang, In-Joon
Journal of the Korean Association of Geographic Information Studies
/
v.10
no.2
/
pp.152-163
/
2007
The on-going pre-environmental investigation at present is performed by separate numerical analysis of each provision which makes integrated pre-environmental investigation is difficult. The application of numerical data is insufficient, which results to the deterioration of environmental investigation result's objectivity. A lot of time and money is required for the investigation. In this study, the spacial analysis function of GIS was applied on the 8 pre-environmental investigation factors. Pre-environmental investigation GIS DMS(Decision Making System) using AHP was constructed to make integrated investigation possible through the use of investigation results for each factor. Through the use of the developed pre-environmental investigation GIS DMS and the pre-constructed GIS data, the objectivity of environmental investigation is sufficient and time and cost are reduced. Therefore, this system can be used for pre-environmental investigation during route selection in the initial stages of road construction. Through the numerical and visual data obtained from the system developed in this paper, it is easier to gain the approval of the public. Furthermore, environmental problems due to road construction can be investigated with less time and money during the initial stages of road construction.
KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.1D
/
pp.185-193
/
2006
The on-going pre-environmental investigation at present is performed by separate numerical analysis of each provision which makes integrated pre-environmental investigation is difficult. The application of numerical data is insufficient, which results to the deterioration of environmental investigation result's objectivity. A lot of time and money is required for the investigation. In this study, the spacial analysis function of GIS was applied on the 8 pre-environmental investigation factors. Pre-environmental investigation GIS DMS(Decision Making System) was constructed to make integrated investigation possible through the use of investigation results for each factor. Through the use of the developed pre-environmental investigation GIS DMS and the pre-constructed GIS data, the objectivity of environmental investigation is sufficient and time and cost are reduced. Therefore, this system can be used for pre-environmental investigation during route selection in the initial stages of road construction. Through the numerical and visual data obtained from the system developed in this paper, it is easier to gain the approval of the public. Furthermore, environmental problems due to road construction can be investigated with less time and money during the initial stages of road construction.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.