• Title/Summary/Keyword: 편익 추정

Search Result 323, Processing Time 0.02 seconds

A Study on the Estimation Measure of Delay Cost on Work Zone Using the Traffic Flow Model (교통류 모형을 이용한 도로 점용공사 구간의 지체비용 산정방안)

  • Kim, Yunsik;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.120-129
    • /
    • 2016
  • The user cost is an important analysis item which should be considered together with life-cycle of facility, administrator cost and discount rate in LCCA for efficient asset management of SOC facilities. Especially, a significant delay cost occurs often for users in the road field due to a work zone for cleaning and maintenance, and in such case, the administrator should consider the administrator cost as well as the user cost for more rational decision making. However, the user cost has not been considered in most decision making steps until recently and relevant studies also have not been carried out actively. In this study, the methodology to estimate the user cost and delay cost required in the decision making step using the traffic flow model and the direct benefit estimation model in the traffic facility investment evaluation guideline is suggested. And, the traffic flow model was estimated on 4 national highway sections where maintenance was actually carried out in 2014 using VISSIM and, the user cost and the delay cost were estimated based on the suggested methodology. The analysis result showed that the average user cost of $17,569,000KRW/km{\times}day$ occurred on Section A with approximately 30,000 AADT before a work zone occurred, and in case the first lane was blocked for maintenance, the delay cost of $10,193,000KRW/km{\times}day$ (158%) on average occurred additionally. The delay cost of $1,507,000KRW/km{\times}day$ (115%) and $1,985,000KRW/km{\times}day$ (119%) occurred on Sections B and D with approximately 20,000 AADT respectively and the delay cost of $262,000KRW/km{\times}day$ (105%) occurred on Section C with approximately 10,000 AADT. This result of this study was estimated based on the simulation of traffic flow model so that there is a limitation in its actual application. A study ot develop a highly appropriate model using actual observation data and improve the possibility to apply it through the verification using the simulation will be necessary in future.

Estimation of the Expected Socio-economic Benefits of the Largescale Comprehensive Agricultural Development Project and Jointcost Allocation -In the Case of Kumgang Project Area- (대단위 농업종합개발사업의 사회경제적 기대편익 추정과 결합비용의 배분 -금강지구를 중심으로-)

  • Lim, Jae Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.23 no.1
    • /
    • pp.159-176
    • /
    • 1996
  • This study is aimed at reviewing the methods of joint cost allocation and allocating the joint cost of estuary dam with specially repect to Kumgang Large-scale Agricultural Comprehensive Development Project. Apart from the water resource development project propelled by Water Resource Development Corporation in connection with Law of Multipurpose Dam Development, the Largescale Comprehensive Agricultural Development Projects couldn't ins-titutionally be carried out cost allocation of common facilities, even though it were concerned with irrigation, municipal and industrical water supply, flood control, sightseeing and industrial zone development components. To decrease farmer's burden of the project costs and, operation and maintenance costs, the joint costs of common facilities like estuary dam included in agricultural development projects have to be allocated by suitable method as alternative cost-remaining benefit method and the analytical activity should be supported by revising the concerned laws as Rural Development and Promotion and, Rural Rearrangement conpatible with the law for multipurpose dam development. Kumgang Agricultural Comprehensive Development Project was selected as a case study for the estimation of socio-economic benefits by project components and joint cost allocation of the estuary dam. The main results of the study are as follows; Joint cost allocation and unit charges by components 1. The project area will be 25,554ha with total project cost of 624,860 million won including the estuary dam cost of 120,843 million won. The project costs were ex-pressed by 1994 constant price. 2. Total quantity of water was estimated 365 million tons which were consisted of 245 million tons for irrigation, 73 million tons for municipal water and 47 million tons for industrial water. 3. The rates of joint cost allocation were amounted to 34.2% for agriculture, 2.5% for sightseeing, 45.7% for transportation, 11.8% for M & I water supply and 5.8% for flood control respectively. 4. The unit financial charges by project components were estimated at 7.88 won per ton for irrigation, 16.11won for M & I water, 1,686won per vehicle one pass, 977won per Pyeong according to the capital recovery method. The financial charges using straitline method for depreciation were estimated at 7.88won per ton for irrigation, 9.12won per ton for M & I water, 624won per vehicle one pass for transportation and 331won per Pyeong for sightseeing area. 5. The unit economic charges by project components were estimated at 21.1 won per ton for irrigation, 15.2won for M & I water, 977won per vehicle one pass, 977won per Pyeong according to the capital recovery method. The economic charges using straitline method for depreciation were estimated at 11.72won per ton for irrigation, 8.61won per ton for M & I water, 331won per vehicle one pass for transportation. Policy recommendation 1. The unit operation and maintenance costs for irrigation water in the paddy field couldn't be imposed as the water resource cost untreated. 2. The dam costs including investment cost and O & M cost, as a joint cost, had to be allocated by each benefited components as transportation, M & I water supply, flood control, irrigation and drainage, and sightseeing. But the agricultural comprehensive project have been dealt as an irrigation project without any appraisal socio-economic benefits and any allocating the joint cost of estuary dam. 3. All the associated project benefits and costs must be evaluated based on accounting principle and rent recovery rate of the project costs and O & M costs should be regulated by the laws concerned. 4. The rural development and promotion law and rural rearrangement law have to be revised comprising joint cost allocation considering free rider problems. 5. The government subsidy for the agricultural base development project has to be covered all the project costs. In case of common facilities representing joint cost allocation problems, all the allocated casts for other purposes like transportation and M & I water supply etc. should be recovered for formation in investment fund for agricultural base development and to procure O & M costs for irrigation facilities.

  • PDF

Community-based Helicobacter pylori Screening and its Effects on Eradication in Patients with Dyspepsia (지역사회에서 소화불량 환자의 Helicobacter pylori 감염에 대한 집단검진 및 치료효과)

  • Kim, Seong-Ho;Hong, Dae-Yong;Lee, Kyeong-Soo;Kim, Seok-Beom;Kim, Sang-Kyu;Suh, Jeong-Ill;Kim, Mee-Kyung;Kang, Pock-Soo
    • Journal of Preventive Medicine and Public Health
    • /
    • v.33 no.3
    • /
    • pp.285-298
    • /
    • 2000
  • Objectives : To investigate the positive rate of Helicobacter pylori in patients with dyspepsia; medical compliance and related factors; the eradication rate a year after screening and related factors; the relationship between the eradication of Helicobacter pylori and the improvement of symptoms; and the estimated cost of three alternative approaches to treat Helicobacter pylori in the community. Methods : A total of 510 subjects with dyspeptic symptoms were selected and given the serological test in March 1998. The subjects were all adults over 30 years of age residing in Kyongju city. Results : Of the 510 selected subjects, 375 (73.5%) subjects proved positive for Helicobacter pylori on serological testing. Of these 304 (81.1%) who consented to an endoscopic examination, underwent a Campylobacter-like organism (CLO) test. Of these 304 subjects, 204 (67.1%), who had positive CLO test results, were given the triple therapy - tripotassium dicitrato bismuthate, amoxicillin, and metronidazole. To determine the eradication rate of Helicobacter pylori, 181 (88.1%) out of the 204 subjects who were given the triple therapy completed a follow-up urea breath test one year later. Of these, the Helicobacter pylori of 87(48.1%) subjects was eradicated. Among the 122 subjects who were medication compliant, the Helicobacter pylori eradication rate was 57.4% (70 subjects), while the eradication rates was only 28.8% (17subjects) in the non-compliant group. The Helicobacter pylori eradication was significantly related to compliance (p<0.01), but not to other characteristics and habits. The symptom improvement rate tended to be higher 62.1%), in the Helicobacter pylori eradicated group than in the non-eradicated group (59.6%). Conclusions : When the advantages and disadvantages of each alternative treatment were considered in the light of cost, antibiotic tolerance and the number of patients to be treated, alternative II was favorable in terms of cost. Alternative III was favorable in terms of the number of patients to be treated, antibiotic tolerance and early detection of gastric cancer. Further long-term research analyzing the cost-benefit and cost-effectiveness of each treatment will be needed as supporting material in creating new policies.

  • PDF