• Title/Summary/Keyword: 편익

Search Result 1,424, Processing Time 0.032 seconds

The Forecast on the Benefit of Traffic Safety Facility for the Inland Waterway in Cambodia -Focusing on the section between Phnom Penh and Chong Kneas port- (캄보디아 내륙수로의 교통안전시설에 대한 편익추정 -프롬펜과 총크니아스항 구간을 대상으로-)

  • Kim, Jung-Hoon
    • Journal of Korea Port Economic Association
    • /
    • v.25 no.2
    • /
    • pp.73-94
    • /
    • 2009
  • In this paper the benefit was forecasted for traffic safety facilities to be constructed along the inland waterway between Phnom Penh and Chong Kneas(Siem Reap) port in Cambodia. First of all, the number of cruise ships passengers and cargo volumes were predicted. Second, the traffic volume of the cruise ships and cargo ships were calculated according to the prediction. Last, the safety benefit of traffic safety facilities was forecasted with the traffic after surveying the waterway accidents. The other benefit was also presented by converting the effect of relieving the emotional burden of navigators into currency value. Accordingly the entire benefit was estimated to be $14,990, $20,950 and $28,540 for pessimistic, moderate and optimistic prospects, in 2011. And then the entire benefits are calculated as $28,320, $63,060 and $95,230 for each prospect in the final estimation year 2020.

  • PDF

Current Methodologies for Environmental Impact Studies of Railroad-related Projects (철도사업 타당성조사의 환경편익 계량화)

  • Nam, Doo-Hee;Lee, Jin-Sun;Min, Bo-Young
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1300-1305
    • /
    • 2011
  • Environmental Impact is getting more attention in many feasibility studies for railroad-related projects and research items. For sustainable growth and green transportation, the benefits typically used for feasibility studies in railway-related projects, are composed mostly of economic criterions which is not considering growing attention on changing paradigm. Based on the analysis of current methodologies, improvements in estimating environmental impact especially on noise and pollution are suggested.

  • PDF

A Study on Estimating Emergency Water Supply Benefits by Dam (댐에 의한 비상용수 공급편익 산정 방안 연구)

  • Yoon, Seul-Ki;Kim, Gil-Ho;Yeo, Kyu-Dong;Shim, Myung-Pil
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.1540-1544
    • /
    • 2008
  • 최근 기후변화의 영향일 것으로 추정되는 이상가뭄의 발생빈도가 잦아지는 상황에서 이에 대한 대비책으로서 댐의 비상용량을 비상용수로 공급하는 방안이 조심스럽게 제기되고는 있으나 현재까지 국내에서는 비상용수에 대한 명확한 정의조차 제시되지 않는 등 다소 생소한 개념이라고 할 수 있다. 본 연구는 비상용수 공급의 국내 외 사례와 비상용수 공급편익 산정에 관한 국내 외 연구를 검토하여 댐에 의한 비상용수 공급의 가능성과 가치를 평가하는 것을 목적으로 한다. 비상용수의 수요는 정기적으로 발생하지 않는 특수한 경우이고 용수공급을 대체할 만한 대안이 거의 없는 극한 상황에서 발생한다. 그러므로 생 공용수의 편익산정 방법에 일반적으로 이용되는 대체시설비용법과 같은 편익산정 기법을 적용하는 것은 여의치 않을 것으로 판단된다. 그리하여 본 연구는 비상용량이 사용될 때의 갈수빈도와 갈수피해액의 관계를 설정하고 피해경감액을 추정함으로써 연평균 편익을 산출하는 방안을 검토하는 방안을 제안하고자 한다. 비상용수 공급편익의 합리적인 계량화하기 위해서는 적절한 이수안전도의 설정과 이에 따른 이수기능의 평가가 선행되어야 한다. 그러나 아직까지 갈수규모에 따른 비상용수 공급편익의 산정방법에 대한 명확한 기준이 마련되지 않은 실정이다. 따라서 향후 비상시 댐의 이수기능을 최대한 활용하고 이에 대한 올바른 가치평가를 위해서도 관련분야에 대한 기초연구가 시급히 이루어져야 할 것이다.

  • PDF

Method and Application of the Calculation of the Benefits of the Improvement of Railway Crossing (철도건널목 개선편익 산정방법 및 적용)

  • Jang, Jun-Seok;Lee, Jun;Eom, Jin-Ki;Moon, Dae-Seop
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.790-795
    • /
    • 2011
  • When railway crossing is required to be improved to improve road traffic efficiency, cost-benefits analysis is conducted. In the analysis, such benefits as the reduction of the delay in road vehicle traffic and related costs and reduction of traffic accidents have been appropriately estimated, however, which has not been the case for the reduction of railway operation costs and accidents. This omission may result in a significant difference in the total estimation of the benefits achievable in a long railway line where many of the crossings are improved or reconstructed. This would deteriorate the rationality of the benefit analysis. As the result, although there are various, significant benefits recognizable in the improvement of railway crossings, but they have not been included in the list of the benefits due to the difficulty in calculation. To this end, this paper proposes a methodology of the calculation of the benefits of railway crossing improvement by estimating the unit costs used in the estimation of the benefits obtainable by the reduction of the railway operation costs and the reduction of the accidents at a crossing on the basis of past studies and data.

  • PDF

Calculation of Total Benefit by the Contingent Valuation Method for Cost-Benefit Analysis: Focusing on Income and Distance-Decay Effects (비용편익분석을 위한 조건부가치측정법에서의 총편익 산정: 소득효과 및 거리-소멸 효과를 중심으로)

  • Lee, Jongyearn
    • KDI Journal of Economic Policy
    • /
    • v.36 no.1
    • /
    • pp.43-80
    • /
    • 2014
  • This study suggests a model for calculating total benefit rigorously to use the contingent valuation method (CVM) in cost-benefit analysis (CBA). Estimating households' willingness to pay through survey method, the study attempts to demonstrate if a respondent's income and the distance between a respondent's residence and the location of a target facility affect her willingness to pay. The estimation results from a structural model show that income and distance-decay effects exist and that the calculated total benefit varies largely when these effects are ignored. The study emphasizes the effects of income and distance-decay on the total benefit must be carefully considered in using CVM for CBA. Even though the total project cost is precisely estimated, the benefit/cost (B/C) ratio may differ largely when the total benefit is not correctly calculated. Also, an ad hoc model generates significantly different estimates from the utility difference model this study adopted. The difference in estimates suggests that the total benefit has to be estimated by a structural model. Finally, simulations are performed to check the validity of the model as well as to predict consequences when income and distance-decay effects are not properly treated. The results from simulations reveal it is not desirable to ignore those effects considering the perspectives of balanced regional development.

  • PDF

For capital investment "cost-benefit analysis," Study on the Possibility of the Utilization (자본투자를 위한 "비용.편익분석"의 활용 가능성에 관한연구)

  • Jeong, Jae-Jeong;Yang, Gwang-Mo;Gang, Gyeong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.11a
    • /
    • pp.99-104
    • /
    • 2013
  • 비용편익분석은 어떤 사업으로 인하여 자연배분의 변화가 생길 때 그에 따른 경제적 편익을 측정하게 되며 사업을 시행하여 생기는 편익과 비용을 비교하여 경제성을 평가하고 대안 중에서 우선순위를 결정할 때 유용하다. 따라서, 본 논문은 자본에 관한 투자기준을 마련하기 위해서 분석용 모델인 "비용편익분석"을 활용 하여 제조기업의 어떤 사업계획에 의하여 생겨나는 자본요소가 어떻게 투자되어야 생산비용을 최소화 할 수 있는지를 자본투자에서 가장 핵심적인 생산설비투자와 기술개발투자에 대한 비용편익분석을 통하여 그 방법론을 제시함으로써, 자본투자에 있어서 "비용효과분석"의 활용성을 확인하고자 한다.

  • PDF

Policies for Seizing the Benefits of ICT for Business: Focused on Joint ICCP/CIBE Forum (OECD ICT 편익 확대를 위한 정책과 시사점: ICCP/CIBE 공동 포럼을 중심으로)

  • Kang, S.W.
    • Electronics and Telecommunications Trends
    • /
    • v.18 no.6 s.84
    • /
    • pp.93-100
    • /
    • 2003
  • 본 포럼은 ICT의 편익과 이를 확대하기 위한 정부의 정책적인 노력에 관련된 행사로서 포럼에서는 무엇보다도 ICT 이용확산을 위한 정부의 주도적인 역할의 필요성이 확인되었다. 이러한 ICT 편익의 확대를 위해서는 ICT에 우호적인 환경 조성이 요구되며, 이를 위한 콘텐츠 공급, ICT에 대한 기업과 정부의 마인드 변화, ICT 사용자를 위한 정보보호, 보안 등 신뢰환경 확보 등이 강조되었다. 또한 본 포럼을 통해 ICT 편익 확대와 이용확산을 위한 지속적인 ICT 투자가 요구되지만, 모든 ICT 분야에 투자하는 것보다는 특정분야의 선택과 집중이 필요하다는 공감대가 형성되었다. 한편, 현재 ICT 편익에 대한 긍정적인 측면이 너무 강조되고 있으나, 여러 연구에서 살펴볼 수 있듯이 ICT에 대한 부정적인 측면 등이 있음을 인식할 필요가 있으며, 향후 지속적인 연구와 벤치마킹 분석을 통하여 ICT의 문제점을 보안하고, 핵심 애플리케이션을 개발함으로써 ICT 편익의 확대가 강조되었다.

Estimating Benefit of Water Quality Improvement with Replacement Cost Method (대체비용법을 이용한 수질개선편익 산정)

  • Jo, Eun-Hui;Yeo, Kyu-Dong;Kim, Gil-Ho;Lee, Sang-Won
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.800-800
    • /
    • 2012
  • 수자원사업에 따른 수질개선편익은 사업으로 인해 저감되는 오염원의 양을 예측하고, 그에 따른 수질개선효과를 계량화한 값이며, 이는 곧 해당사업의 가치로써 정의된다. 이러한 수질개선편익을 산정하기 위한 방법에는 개인의 지불의사를 추정하여 가치를 추정하는 조건부가치측정법(CVM)과 해당 사업에 따른 효과를 기술적 방식으로 대체할 때 소요되는 비용을 시행사업의 가치로 평가하는 방식인 대체비용법을 들 수 있다. 현재 조건부가치측정법은 다양한 분야의 사업에 대한 가치추정법으로 널리 쓰이고 있으나, 해당사업의 가치에 대한 공학적이고 직관적인 해답을 줄 수 있는 대체비용법의 적용성은 아직까지 미미한 실정이다. 이에 본 연구는 수질개선편익을 중심으로 대체비용법의 분석절차와 적용성을 확인하고자 하였고, 이에 대한 사례연구로서 댐증고사업을 대상으로 하였다. 수질개선편익과 같이 환경적 질을 높이는 사업은 대상사업의 가치를 추정하는 데 많은 어려움이 있으며, 기존에 주로 사용된 조건부가치측정법과 더불어 대체비용법을 이용한 검토는 보다 객관적인 의사결정을 지원하는 데 도움을 줄 것으로 판단된다.

  • PDF

A Study on Benefit Cost Analysis of Chungju UIS (청주시 도시정보시스템의 비용편익분석 연구)

  • Kim, Kwang Ju
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.6 no.4
    • /
    • pp.1-15
    • /
    • 2003
  • Recently, urban information system(UIS) has been developed and utilized by local governments in Korea and has become a key means of urban informatization of local governments. When UIS is conducted only for FM oriented internal utilization regardless of its cost-efficiency, however, its cost-benefit structure could be distorted seriously. The study utilizes benefit cost analysis technique and applied the technique to a model case of Chungju UIS selected by National GIS team. Chungju City developed its GIS for the management of roads and urban planning in 1993. At its beginning, the system was an efficient model with relatively strong cost-benefit structure and could produce positive net benefit 10 years' after its construction. When the city began to develop its facility management with the financial assistance from central government in 1998, however, its cost-benefit structure became distorted. As a result, it is delayed for the UIS to produce positive net benefit until the year of 2015. Using benefit cost ratio, discount rate and Mobile GIS, the study also conducts a sensitivity analysis.

  • PDF

Cost-Benefit Analysis of Oxy-Combustion Demonstration Project (순산소발전 실증사업의 비용-편익 분석)

  • Jin, Se-Jun;Yoo, Seung-Hoon
    • Journal of Energy Engineering
    • /
    • v.21 no.2
    • /
    • pp.179-186
    • /
    • 2012
  • A climate change by increase of greenhouse gas is coming to the front by a large issue, and oxy-combustion demonstration project is coming to the attention to one plans for the reduction of carbon dioxide in power generation sector that used a fossil energy in points of time. This paper estimates benefit of electric generation, benefit of greenhouse gas reduction, benefit of environmental pollutant decreasing and domestic and foreign market value-added benefit caused by oxy-combustion demonstration project. Furthermore, this paper attempts to cost-benefit analysis, using NPV, B/C ratio, IRR techniques for oxy-combustion demonstration project. The results indicate that NPV is 681,620million KRW, B/C ratio 1.69 and IRR 21.4%. Accordingly, oxy-combustion demonstration project ensures economic feasibility that the three indicators have exceeded 0, 1.0 and 5.5%. Moreover, uses of the result is useful for the reduction of carbon dioxide in thermal power generation sector of policy decision.