Korean Journal of Construction Engineering and Management
/
v.5
no.2
s.18
/
pp.172-180
/
2004
Recently, there are growing concerns on the introduction of private financing in railroad station construction project. But private-funded station project does not have the efficient delivery system. This study is focused on the recommended solutions about the private-funded station project management. Through the literature survey and interview, it is investigated and analyzed that project management has the problems. The problems are classified as 2 areas: law & regulations and job practice. The problems in law & regulations are a lowing on the profitability, and an unreasonable project team selection process. Job practice has problems such as delaying in authorization process, and inferior feasibility analysis. The study suggests several recommended solutions related to the problem areas. That are as follows: the efficient return of investment system, the project financing system, the professional project management, the benchmarking team operation, and the cut down on discussion period
Journal of Advanced Marine Engineering and Technology
/
v.32
no.1
/
pp.66-72
/
2008
In this study, the ground source heat pump was installed at a research center in Jeju Island to verify the performance of the system and to give an information for a economic feasibility. The performance test was conducted until the heat storage tank temperature reached at $5^{\circ}C$ from $50^{\circ}C$ in the cooling operation, and until the storage temperature goes up to $50^{\circ}C$ from $10^{\circ}C$ in the heating mode. As results, the system performance shows that $2.2{\sim}3.5$ for the cooling operation and $2.5{\sim}3.5$ for heating operation. It is found that the underground is good heat source for the heat pump with $3{\sim}10^{\circ}C$ variation range. The ground source heat pump could be connected one of air conditioning system without any problem in system performance. Based on the economic analysis, the initial cost for the ground source heat pump will be compensated after 4 years operation. If the system runs 20 years, approximately 300 million Won will be saved when the air conditioning system adapt the ground source heat pump based on Life Cycle Cost analysis.
Korean Journal of Air-Conditioning and Refrigeration Engineering
/
v.23
no.10
/
pp.656-661
/
2011
The amount of water resources that can be used tend to be decreased gradually. In contrast, the rapidly increasing water consumption is a problem that need to be addressed. Renovation and equipment replacement to improve energy efficiency and to reduce expenditure for building usage is required. But the excessive initial investment cost and the prolonged of pay back period may be uneconomical choice. Water usage for cleaning the toilet bowl accounts for 27%of the total water usage. Water-saving valve that can select the amount of water for cleaning toilet bowl can be reduced expenditure. After installing water-saving valve, analysed the economic effects. Water-saving valves compared with flush valves, and researched the amount of water usage. Then analyzed for the economic effects. Water-saving valve was used 5.6 ${\ell}$/time for cleaning toilet bowl. In contrast, flush valve was consumed 8.4 ${\ell}$/time. Water-saving valve's water-saving rate was 33.3%. The initial payback period for Water-saving valve was 459.5 days. By a small investment in water saving valve, the economic benefits can be obtained.
In this study, Austrian cleaner production program, ECOPROFIT, was introduced to 15 companies in Korea. The performance and the proposed options of the program were compared with those of Austria. Various options such as good housekeeping, process changes, internal/external recycling, substitution of raw materials were suggested for domestic companies. There are something in common between Korea and Austria such as no relation between company sizes and derived options and good housekeeping as a major option. The difference is that 1.9 years of recovery period on investment is required in Korea, while only 0.5 year is required in Austria. The reason for not applying the suggestions was due to the priority of the company policies in Korea, but was due to the technical problems in Austria. To activate the cleaner production in the Korean regional industry, more systematic analysis on the examples and performances as well as additional studies to disseminate informations and the best practices are necessary.
Petrochemical is an energy consuming industry that consumes about 30% of total industrial energy consumption and is a representative carbon dioxide (CO2) emission source. Among them, the Naphtha Cracking Center (NCC), which produces ethylene, propylene, propane and mixed C4, consumes large amounts of energy and emits significant amounts of CO2. For this reason, an integrated techno economic- environmental impact assessment aimed at reducing energy consumption and environmental impact factors is necessary to ensure efficiency in terms of economics and environment. This study aims to analyze the efficiency of the heat exchanger network used in the existing NCC base on the pinch analysis and select an improvement plan that can reduced energy consumption. In order to reduces the utility consumption in the process, an optimal heat exchanger network considering the high-temperature and low-temperature stream was derived, and the economic evaluation was conducted by considering the trade-off between the reduction in utility consumption and the increase in heat exchanger installation cost. In addition, an environmental impact assessment was conducted on the reduced CO2 emission in consideration of the environmental aspect, and the economic environmental impact assessment used the payback period to recover the invested funds to come up with an energy saving plan that can be applied based on the actual process. As a result of considering the economic-environmental impact assessment, when the environmental impact assessment was not considered, it was 4.29 months, 3.21 months, and 3.39 months for each case, and when considering the environmental impact assessment, it was 4.24 months, 3.17 months, and 3.35 months for each case. These results appeared equally both when the environmental impact assessment was not include and when it was include. In addition, a sensitivity analysis was conducted for each case to determine how important factors affect the payback period. As a result of the sensitivity analysis, the cost of the heat exchanger was identified as a major factor influencing the overall cost.
Extensive efforts from all over the world have been made to solve energy problems, such as high oil prices, global warning due to the depletion of oil. Among them, biofuel has been drawing attention as a clean energy, which can replace fossil fuels. However, conventional biofuels were often converted from eatable biomass such as sugar cane, corn and soy which should be replaced with uneatable biomass. In this study, a techno-economical evaluation of the gasification of biomass waste with mixed alcohol synthesis process was performed. Considering available domestic biomass wastes, a 2000 ton/day conversion plant were assumed to produce 533000 L/day ethanol. Also, financial data from previous studies were evaluated and used and economical sensitivities with various operation conditions were established. Economic analysis were conducted by the payback period and internal rate of return (IRR) and net present value (NPV). Sensitivity analyses of raw material costs, initial investment, the major process cost, ethanol price changes and operating costs were all performed.
Private stevedoring companies are leasing and operating the container terminals of the Busan Port. The total amount of lease fees private stevedoring companies paid in 2010 reached 161 billion wons, an approximately 66 percent of the total revenue of the Busan Port Authority(BPA). In other words, lease fees are the most important revenue source for BPA. However, the lease fee assessment system of Busan container terminals goes against the principle of equity due to different assessment methods and criteria adopted by each container terminal. Therefore, the purpose of the study is to analyze the systematic problems of the lease fee assessment system that is used at Busan container terminals, and propose a new standardized scheme with a case study on the new system. In order to standardize the assessment system, the assessment methods need to be simplified by using the Discounted Cash Flow(DCF) method. In addition, the assessment criteria such as assessment duration, discount rates, price indexes, estimated container throughputs, sales unit price per TEU, operation costs, including labor costs, need to be standardized as well. The new standardized assessment system can be applied to estimate lease fees for new terminals. However, for existing terminals to run the new system, factors such as assessment duration, discount rates, price indexes, estimated container throughputs, investment and re-investment costs, and maintenance & repair costs of the new system should be changed slightly.
Journal of the Korea Academia-Industrial cooperation Society
/
v.14
no.4
/
pp.1540-1547
/
2013
The energy economic analysis of the standard rural house model with PV system was performed based on annual energy demand calculation using the EnergyPlus to contribute in reducing building energy which occupies 25% of national energy consumption and in developing a low-energy & eco-friendly house model. Two types of PV system installation was considered to cover electricity demand for cooling, electric, and heating devices. For the selected house model, heating energy demand is 7 times higher than cooling energy demand. For the Case1, it is favorable to use electricity from PV system for cooling and electric devices and to sell surplus electricity. For the Case2, it is favorable to use electricity from PV system for cooling, electricity and heating devices and to sell surplus electricity. Considering the installation cost of PV system and heat pump air conditioning system, the break-even point of Case1 and Case2 are about 13 and 11 years respectively. Although the installation cost of Case2 is more expensive, Case2 provides three times more profit than Case1 after the break-even point. Because the expected average life time of the selected PV system is 25 years, Case2 is more favorable option for the given standard rural house model.
Korean Journal of Construction Engineering and Management
/
v.14
no.3
/
pp.167-175
/
2013
In 2005, the government introduced BTL(Build-Transfer-Lease) projects as one of the methods of private investment in infrastructure. In a BTL project, a private company builds a public facility and leases it to the government to withdraw its invested capital. But there appear several problems with it due to a short period of preparation and lack of experiences. Specifically, private companies that plan to participate in this project have to take a risk since serious problems are likely to take place because of unrealistic estimation of construction costs, etc., and they finally avoid participating in this project. A case study was made over advanced countries, Japan and the United Kingdom, to find out how to resolve the problems, and rational 7 improvement method were presented from a perspective of Special Purpose Company (SPC), which could be accepted by both of SPC and government agencies. The findings of the study are expected to provide workable solutions to BTL projects from a standpoint of private companies to facilitate the rational improvement of BTL projects, and this study is ultimately expected to stimulate the active participation of SPC to make a contribution to the vitalization of domestic BTL projects.
This paper analyzes the effects of port size on port tariff using the data for world major sixteen container ports. Some previous studies show that demand for port services have significant effects on port tariff, but we cannot find studies analyzing the correlation between the supply variables and the port tariff. In this paper, we used the five supply variables, which are the number of gantry crane, the number of berth, the quay length, the terminal area and the storage capacity for containers. The panel regression results are as follows. Port tariff generally decreases as port size increases, which shows that port tariff is explained by the economic theory. However, increase of port size, in some cases, does not reduce port tariffs, which may be due to monopolistic characteristics of port. This paper also shows that both demand and supply factors affect port tariff, but that demand factors have more consistent effect on port tariff than supply factors.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.