• Title/Summary/Keyword: 통합적 BIM

Search Result 74, Processing Time 0.022 seconds

A Study on the Link of Building Information and Cadastral Information as Spatial Information (공간정보로서의 지적정보와 건물정보의 연계에 관한 연구)

  • Kim, Chang-Hwan;Lee, Won-Hui
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.17 no.3
    • /
    • pp.93-103
    • /
    • 2014
  • Regarding to the cadastral information and building information as a spatial information, studies on linking between cadastral records and building information, or integration methodology on 2D based building map and land information were proposed. Cadastral information has grown its values by cadastral resurvey project and cadastral confirmation survey. There is a tendency of BIM in the design stage which is not just simple 3D dataset and BIM is spreading in public and private sectors. However, studies on the linkage between building information and cadastral information is relatively weak comparing to the BIM spreading. One of the main features that have been improved in IFC4 is the interoperability with GIS. In this regards, the researcher propose several revision methods to link cadastral information to building information. Cadastral information needs to improve the quality of the dataset's such as unifying the different coordinate systems and preparing continuous cadastral map. For buildings, standardization of BIM in the public and private sectors is urgent task. IFC4 and upcoming IFC5 are international standards which need to be considered and BIM reverse engineering for the existing buildings is necessary for the public utilization in the near future.

Methods for Quantitative Disassembly and Code Establishment of CBS in BIM for Program and Payment Management (BIM의 공정과 기성 관리 적용을 위한 CBS 수량 분개 및 코드 정립 방안)

  • Hando Kim;Jeongyong Nam;Yongju Kim;Inhye Ryu
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.36 no.6
    • /
    • pp.381-389
    • /
    • 2023
  • One of the crucial components in building information modeling (BIM) is data. To systematically manage these data, various research studies have focused on the creation of object breakdown structures and property sets. Specifically, crucial data for managing programs and payments involves work breakdown structures (WBSs) and cost breakdown structures (CBSs), which are indispensable for mapping BIM objects. Achieving this requires disassembling CBS quantities based on 3D objects and WBS. However, this task is highly tedious owing to the large volume of CBS and divergent coding practices employed by different organizations. Manual processes, such as those based on Excel, become nearly impossible for such extensive tasks. In response to the challenge of computing quantities that are difficult to derive from BIM objects, this study presents methods for disassembling length-based quantities, incorporating significant portions of the bill of quantities (BOQs). The proposed approach recommends suitable CBS by leveraging the accumulated history of WBS-CBS mapping databases. Additionally, it establishes a unified CBS code, facilitating the effective operation of CBS databases.

Case Study of Civil-BIM & 3D Geographical Information (3차원 지형자료와 토목 BIM의 사례적용 연구)

  • Park, Jae-Sun;Pyeon, Mu-Wook;Jo, Jun-Ho;Lee, Gun-Ho
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.29 no.6
    • /
    • pp.569-576
    • /
    • 2011
  • Recently the establishment of high accuracy 3D spatial information has been largely stimulated according to the increase in need of such 3D spatial information. In the fields of constructions and civil works, studies on increasing the productivity in these fields through converging them with other fields using the established 3D spatial information have been conducted. In such a tendency, BIM (Building Information Modeling) technologies have been rapidly applied to the fields of constructions and civil works. In particular, in the fields of constructions and civil works that represent a life span of plan-design-construction-maintenance, some BIM application methods and plans for the characteristics in each step have been proposed. Thus, the objective of this study is to simulate a project that is reasonable and can be optimized in connection with 3D spatial information and BIM technologies escaped from the conventional civil construction process that is based on empirical, statistical DB, and 2D information. For achieving this objective, 3D terrain data for the subject area engaged in this study using aerial photographs and airborne LiDAR was established. Also, a counter plan for the issues, which cannot be solved in the conventional methods for managing civil work projects, is applied through implementing bridge-based civil structure BIM by combining them with objective information.

Visualization of Tunneling Using a BIM-based 3D Tunnel Model (BIM 기반 3D 터널 모델 가시화에 관한 연구)

  • Yoo, Wan-Kyu;Kim, Jinhwan;Zheng, Xiumei;Kim, Jeong-Heum;Gi, Sang-bok;Kim, Chang-Yong
    • The Journal of Engineering Geology
    • /
    • v.25 no.3
    • /
    • pp.395-401
    • /
    • 2015
  • An investigation of the tunnel face, as well as related measurement data collected during tunneling, is necessary for rock classification and to determine tunnel stability and the cost efficiency of tunneling. However, systematic management and efficient use of such data have yet to be successfully implemented domestically, and the number of experts in this field in Korea is limited. Thus, measures to develop and implement systematic management and effective use of data and expertise are urgently needed. This study aimed to develop measures to efficiently provide online tunnel design and construction data using a building information model (BIM)-based data visualization approach, based on an integrated 3D tunnel model generation module and a web viewer module. The development technology was verified through ○○ tunnel design and construction. Directions for future study and system improvement are proposed.

Proposed Information Management Plan for Building Inspection and Maintenance Based on COBie-IM and BIM (COBie-IM 및 BIM 기반 건축물 점검 및 유지보수 정보관리방안 제시)

  • Lee, Chaewon;Kim, Sangyong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.1
    • /
    • pp.57-68
    • /
    • 2023
  • To maintain the normal function of an aging building, regular inspection, repair, and reinforcement must be performed. However, the form of information and decision-making generated in the current building maintenance stage still depends on inefficient methods. This causes an increase in cost and waste of time in building maintenance. Therefore, this study proposed a COBie-IM document for building inspection and maintenance information management by benchmarking COBie, and suggested a method of checking information by linking it with BIM. In addition, a method for visualizing the designation of colors according to the damage grade of defects occurring in the building was suggested. Through this, we are able to systematically integrate and manage the information generated during inspection and maintenance in the building maintenance stage. This is expected to increase work efficiency by supporting decision-making that determines the priority of repair and reinforcement for defects.

Development of KBIMS Architectural and Structural Element Library and IFC Property Name Conversion Methodology (KBIMS 건축 및 구조 부재 라이브러리 및 IFC 속성명 변환 방법 개발)

  • Kim, Seonwoo;Kim, Sunjung;Kim, Honghyun;Bae, Kiwoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.505-514
    • /
    • 2020
  • This research introduces the method of developing Korea BIM standard (KBIMS) architectural and structural element library and the methodology of converting KBIMS IFC property names with special characters. Diverse BIM tools are utilizing in project, however BIM library researches lack diversity on BIM tool selection. This research described the method to generate twelve categories and seven hundred and ninety-three elements library containing geometrical and numerical data in CATIA V6. KBIMS has its special property data naming systems which was the challenge inputting to ENOVIA IFC database. Three mapping methods for special naming characters had been developed and the ASCII code method was applied. In addition, the convertor prototype had been developed for searching and replacing the ASCII codes into the original KBIMS IFC property names. The methodology was verified by exporting 2,443 entities without data loss in the sample model conversion test. This research would provide a wider choice of BIM tool selection for applying KBIMS. Furthermore, the research would help on the reduction of data interoperability issues in projects. The developed library would be open to the public, however the continuous update and maintenance would be necessary.

Case Study on Application of DMU to Civil Infra Structures to Improve Constructibility (토목구조물분야에서 DMU 적용을 통한 시공성개선 사례 연구)

  • Park, Kyoung-Lae;Lee, Kwang-Myong;Lee, Yoon-Bum;Lee, Chung-Hee;Lee, Tae-Young
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.320-323
    • /
    • 2011
  • 본 논문에서는 BIM의 기술 중 하나인 DMU(Digital Mock-Up)을 실제 프로젝트에 적용하여 업무 효율에 기여한 결과를 소개한다. 삼성물산 건설부문의 경우 DMU는 건설 프로젝트의 입찰단계 및 시공계획 단계에서 적용되어 많은 성과를 거두었다. 입찰단계의 경우 대상 프로젝트의 교량, 터널 등의 구조물을 실제와 같은 지형조건 및 설계 조건으로 모델링하여 프로젝트의 개요 파악, 정보의 공유, 선정된 공법의 효과 분석 등에 적용하였으며 시공단계에서는 주로 복잡한 구조물의 철근 간섭 검토 및 효율적인 배근 방법 분석을 위한 도구로 사용되었다. 적용결과 공기단축, 원가절감, 시공성 향상에 기여하였으며, DMU는 향후 프로젝트 관리도구로 통합되어 구조물공사의 원가절감 및 생산성 향상에 기여할 것으로 예상된다.

  • PDF

LIM Implementation Method for Planning Biotope Area Ratio in Apartment Complex - Focused on Terrain and Pavement Modeling - (공동주택단지의 생태면적률 계획을 위한 LIM 활용방법 - 지형 및 포장재 모델링을 중심으로 -)

  • Kim, Bok-Young;Son, Yong-Hoon;Lee, Soon-Ji
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.46 no.3
    • /
    • pp.14-26
    • /
    • 2018
  • The Biotope Area Ratio (BAR) is a quantitative pre-planning index for sustainable development and an integrated indicator for the balanced development of buildings and outdoor spaces. However, it has been pointed out that there are problems in operations management: errors in area calculation, insufficiency in the underground soil condition and depth, reduction in biotope area after construction, and functional failure as a pre-planning index. To address these problems, this study proposes implementing LIM. Since the weights of the BAR are mainly decided by the underground soil condition and depth with land cover types, the study focused on the terrain and pavements. The model should conform to BIM guidelines and standards provided by government agencies and professional organizations. Thus, the scope and Level Of Detail (LOD) of the model were defined, and the method to build a model with BIM software was developed. An apartment complex on sloping ground was selected as a case study, a 3D terrain modeled, paving libraries created with property information on the BAR, and a LIM model completed for the site. Then the BAR was calculated and construction documents were created with the BAR table and pavement details. As results of the study, it was found that the application of the criteria on the BAR and calculation became accurate, and the efficiency of design tasks was improved by LIM. It also enabled the performance of evidence-based design on the terrain and underground structures. To adopt LIM, it is necessary to create and distribute LIM library manuals or templates, and build library content that comply with KBIMS standards. The government policy must also have practitioners submit BIM models in the certification system. Since it is expected that the criteria on planting types in the BAR will be expanded, further research is needed to build and utilize the information model for planting materials.

Building Information Modeling of Caves (CaveBIM) in Jeju Island at a Specific Site below a Road at Jaeamcheon Lava Tube and at a Broader Scale for Hallim Town (제주도 한림 재암천굴과 도로 교차구간의 CaveBIM 구축)

  • An, Joon-Sang;Kim, Wooram;Baek, Yong;Kim, Jin-Hwan;Lee, Jong-Hyun
    • The Journal of Engineering Geology
    • /
    • v.32 no.4
    • /
    • pp.449-466
    • /
    • 2022
  • The establishment of a complete geological model that includes information about all the various components at a site (such as underground structures and the compositions of rock and soil underground space) is difficult, and geological modeling is a developing field. This study uses commercial software for the relatively easy composition of geological models. Our digital modeling process integrates a model of Jeju Island's 3D geological information, models of cave shapes, and information on the state of a road at the site's upper surface. Among the numerous natural caves that exist in Jeju Island, we studied the Jaeamcheon lava tube near Hallim town, and the selected site lies below a road. We developed a digital model by applying the principles of building information modeling (BIM) to the cave (CaveBIM). The digital model was compiled through gathering and integrating specific data: relevant processes include modeling the cave's shape using a laser scanner, 3D geological modeling using geological information and geophysical exploration data, and modeling the surrounding area using drones. This study developed a global-scale model of the Hallim region and a local-scale model of the Jaeamcheon cave. Cross-validation was performed when constructing the LSM, and the results were compared and analyzed.

Development of Information & Communications Technologies Merged Municipal Government Bridge Maintenance System (ICT 융합 지자체 교량 유지관리 시스템개발)

  • Yun, Youngman
    • Journal of the Society of Disaster Information
    • /
    • v.13 no.4
    • /
    • pp.476-482
    • /
    • 2017
  • For the bridges managed by the municipalities, there is a need for a maintenance management system for the municipal governments for the scientific and systematic maintenance standard and the scientificization of the budget acquisition and execution through the quantified data base. The purpose of this study is to develop a system for efficient management of small bridgies maintained by the municipality and use ICT convergence technology such as BIM / GIS technology. The details of the system development include the development of the small bridgies maintenance program for mobile devices, the development of the small bridgies maintenance database, the development of the small bridgies integration maintenance management, and the reliability of the program system developed by checking the construction and operation contents of the small bridgies test-bed. The developed program system is linked to the development of smart name plate and reader module of non - power system.