• Title/Summary/Keyword: 통합설비

Search Result 537, Processing Time 0.03 seconds

Design of waste Sludge/Food Waste Biological Treatment Process using Closed ATAD System (밀폐형 ATAD system을 이용한 하수슬러지/음식물쓰레기 통합처리 공정 설계)

  • Kwon, Hyeok-Young;Ji, Young-Hwan;Song, Han-Jo;Kim, Seong-Jung
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.8 no.4
    • /
    • pp.129-137
    • /
    • 2000
  • In this study, biological treatment process of MWWT(Municipal wet-waste Treatment) has been developed through a moduling of the containerized closed ATAD(Auto thermal aerobic digestion) system & closed vertical dynamic acerator, which were used for food waste and cattle manure, respectively. Though biological process has several advantages such as low concentrations of heavy metals and salts, proper and stable C/N ratio and constant reaction rate against the process treating two wastes separately, it has a obstacles of salt concentration and much usage of bulking agent such as wood chip. After rapid oxidation in the boxed tower reactor for 5 days, the content of sewage sludge would be reduced 65% on around, might be mixed with the food waste that had been treated in the static closed reactor during 6 days and put in the secondary static reactor for curing. During composting process, the odor contained in the gas generated from the reactor was removed by passing it through a biofilter as well as the leachate was treated in the wastewater treatment facility. Consequently, it seemed to be possible to compost sewage sludge at mild and stable operating condition and at low cost through the biological ATAD process resulting in the production of organic compost satisfying the specifications regulated by itself.

  • PDF

Cause and Countermeasure of Inundation Damage in Underground Space (우리나라 지하공간 내수침수피해 원인 및 대책)

  • Cho, Jae-Woong;Choi, Woo-Jung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.420-420
    • /
    • 2011
  • 도시지역의 내수침수피해는 거의 매년 발생하고 있으며, 반지하와 같은 거주공간이 매우 취약한 상태이다. 특히 최근에는 지하철, 지하상가 등이 대규모 개발되고 복합네트워크화 되어 지하공간의 침수대책과 대피방안 마련이 시급한 상황이다. 일본의 경우 2000년 토카이 호우피해 후 통합유출해석 모형을 개발하였으며, 1999년 및 2003년 후쿠오카 침수피해 발생 후 특정도시하천침수피해대책법을 제정, 1999 후쿠오카, 2004년 하마마츠, 2008년 카누마 피해 후 일본 방재연구소에서는 실시간 1차원 지표범람모형과 모니터링을 통한 실시간 내수침수지도를 개발하였다. 특히 지하공간에 대해서는 "지하공간에 유입하는 범람수가 계단상 보행자게에 주는 위험성에 관한 연구" 등 실험을 바탕으로 각종 지하공간 침수대책 매뉴얼 및 지하시설의 침수시 피난확보계획 지침, 지하공간 침수대책 가이드라인 등 인명피해를 줄이고자하는 노력이 계속되어 오고 있다. 우리나라는 2006년 경기도 고양시 3호선 정발산역이 침수되었으며, 2010년 서울시 지하철 2호선 사당역 및 4호선이 침수되는 등의 지하철 침수피해와 2010년 서울시 광화문 지하상가, 인천시 부평구 우림라이온스 벨리, 우남플라자, 계양구 농협하나로마트, 서원아파트 등의 지하상가와 지하다층의 침수피해가 발생하였다. 특히 2006년 3호선 정발산역 침수는 17시간이나 지하철이 불통되었고 이로 인하여 심각한 교통 체증이 유발 되었다. 본 연구에서는 2010년 집중호우로 인한 서울, 인천지역의 지하공간 침수피해를 중심으로 최근 10년간 지하공간 침수피해사례로부터 대표적인 침수피해 원인 및 특성을 정리하였으며, 그 결과 지하공간 침수의 주요원인은 지상공간의 침수류가 지하공간으로 유입하고, 지하공간의 배수설비 용량부족, 지하공간으로의 유입을 방지하기위한 방지턱, 차수판, 침수시 비상전원 공급, 침수시 지하공간 대피 매뉴얼의 부재 등 다양한 원인이 있는 것으로 나타났다. 특히, 소방방재청에서 고시한 '지하공간 침수방지를 위한 수방기준'에 지하공간 침수 방지를 위한 각종 시설의 설치 및 대피 경로지정 등에 대한 기준이 마련되어 있으나, 지하공간 중 유동인구가 가장 많은 지하철역에서 조차 침수에 대한 행동매뉴얼이나 대피에 대한 가이드라인이 마련되지 않은 것으로 나타났다. 따라서, 지하공간 침수를 방지하기 위하여 센서를 이용한 자동 차수판과 경보기 설치, 지하공간의 사람들이 안전한 대피로를 찾을 수 있도록 지상공간 및 지하공간 출입구를 모니터링 할 수 있는 CCTV의 설치, Dry Area를 두어 비상대피 할 수 있는 공간의 마련 등 시설적인 부분에 대하여 '지하공간 침수방지를 위한 수방기준'을 더욱 강화할 필요가 있으며, 지상공간의 침수 상황을 고려한 지하공간의 대피매뉴얼 또는 가이드라인 등의 수립이 필요하다. 또한 이와 더불어 재산 및 인명피해를 더욱 효율적으로 줄일 수 있도록 실시간 예 경보를 위한 침수해석 모형의 개발이 시급하다.

  • PDF

A Study on Numerical Analysis of Selective Withdrawal from Reservoir (저수지 선택취수에 관한 수치해석 연구)

  • Kim, Young-Do;Kim, Tae-Won;Yi, Yong-Kon;Kim, Woo-Gu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.1302-1306
    • /
    • 2007
  • 여름철의 강우시 저수지에 주로 유입되는 고탁수층은 저수지내의 수체에 대하여 밀도차와 유속차를 가지며, 난류혼합을 일으키면서 주변수를 유입하며 하류방향으로 이송 확산되어 간다. 임하댐과 같은 대형 저수지는 수심이 30 m가 넘는 관계로 여름철에 2개의 수온약층이 존재한다. 따라서 댐체에 도달한 고탁수층은 저수지내의 밀도성층으로 인하여 주로 중층에 분포하게 되며, 가을철에 발생하는 수평확산과 전도현상으로 인해 저수지 전역에 분포하게 되어 탁질입자의 분포에 따라 탁수현상의 장기화를 유발하기도 한다. 이와 같은 탁수문제의 저수지내 대책으로는 홍수기에 고탁수층을 우선적으로 취수하는 방법이 있다. 고탁수층은 이와같이 수온약층과 밀접한 관계를 가지며, 취수탑 주변의 선택취수 결과에 영향을 받는다. 형성된 탁수층을 효율적으로 선택배제하기 위해서는 취수시설에 접근하는 성층흐름을 정확하게 이해해야 한다. 본 연구에서는 3차원 CFD를 사용하여 밀도성층에 따른 취수탑 주변의 접근흐름을 수치해석하여 방류수심, 방류유속 및 밀도성층구조의 선택배제에 대한 영향을 분석하였다. 임하댐 취수설비에 적용한 결과에 의하면 상층, 중층, 하층에서 취수탑 문비를 개도하였을 경우, 취수탑 주변에서만 유속이 증가하였을 뿐 저수지 내에서는 유속이 크게 증가되지 않은 것으로 나타났다. 하지만 문비 개도구간의 변화에 따라 수심별 유속분포는 크게 변화하는 것을 확인할 수 있다. 따라서 문비를 조절하는 것은 저수지 전체의 유동을 깨뜨리지 않으면서 취수탑 인근에서 선택취수가 가능하다는 것을 확인할 수 있었다. 또한 본 연구에서는 정밀한 현장조사를 수행하여 저수지와 방류수의 탁도변화를 모니터링하였으며, 취수탑 개구부 주변의 연직 유속분포를 측정하였다. 3차원 수치모의 결과와 현장에서 관측한 유속장을 비교함으로써 본 연구에서 제시한 실제 탁수배제능력을 검증하였다.를 구축하였다는데 의의가 있다.로와 접하는 건물의 경우 모서리부 광고 효과가 지배적이며 대부분 곡선돌출형이 사용되고 있었다. 그러므로 모서리 저층부를 필로티로 계획하여 보행흐름을 원활하게 하고 대신 입면을 투명하게 하여 간접광고(내부전시) 효과를 유도하는 것이 좋다. 특히 원형모서리는 건물 특화 성격이 강하므로 불가피할 경우 소형 액센트 광고 위치를 미리 벽면으로 할애하는 것이 경관 및 입면계획에 유리한 것으로 분석되었다. 불확실도 해석모형 등의 새로운 기능을 추가하여 제시하였다. 모든 입출력자료는 프로젝트 단위별로 운영되어 data의 관리가 손쉽도록 하였으며 결과를 DB에 저장하여 다른 모형에서도 적용할 수 있도록 하였다. 그리고 HyGIS-HMS 및 HyGIS-RAS 모형에서 강우-유출-하도 수리해석-범람해석 등이 일괄되게 하나의 시스템 내에서 구현될 수 있도록 하였다. 따라서 HyGIS와 통합된 수리, 수문모형은 국내 하천 및 유역에 적합한 시스템으로서 향후 HydroInformatics 구현을 염두에 둔 특화된 국내 수자원 분야 소프트웨어의 개발에 기본 토대를 제공할 것으로 판단된다.았다. 또한 저자들의 임상병리학적 연구결과가 다른 문헌에서 보고된 소아 신증후군의 연구결과와 큰 차이를 보이지 않음을 알 수 있었다. 자극에 차이가 있지 않나 추측되며 이에 관한 추후 연구가 요망된다. 총대장통과시간의 단축은 결장 분절 모두에서 줄어들어 나타났으나 좌측결장 통과시간의 감소 및 이로 인한 이 부위의 통과시간 비율의 저하가 가장 주요하였다. 이러한 결과는 차가운 생수 섭취가 주로 결장 근위부를 자극하는 효과를 발휘하는 것이 아닌가 해석된다. 이와 같은 연구결과를 통해 생다시마를 주원료로 개발된 생다시마차와 생다시마 음료가 만성 기능성 변비 증세를 개선하는 효능이 잠재적으로 있음을 확인하였다. 그러나 생약제재의 변비약 수준으로

  • PDF

Feasibility Study of Improved Train Control System Using On-board Controller for Intelligent Control of Trackside Facilities (선로변 시설물의 지능적 제어를 위한 차상중심 열차제어시스템 시뮬레이션 기반 성능 평가)

  • Baek, Jong-Hyen;Jo, Hyun-Jeong;Chae, Eun-Kyung;Choi, Hyun-Young;Kim, Yong-Gyu
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.6
    • /
    • pp.528-533
    • /
    • 2013
  • To improve the efficiency and safety of railway systems, the train control system has considerably evolved from the ground-equipment-based control system (e.g. track circuit, interlocking system, etc.) into the on-board-equipment-based control system. In addition, this train control system enables the rolling stock to intelligently control the trackside facilities by introducing information and communication technologies (ICT). Accordingly, since the ICT-based train control system simplifies the railway system (i.e. the heavy ground-equipment can be removed), an efficient and cost-effective railway system can be realized. In this paper, we perform a feasibility test of the ICT-based train control system using a simulation. To this end, we implement a test-bed consisting of prototype machines of on-board/ground equipment and introduce an integrated operation scenario for the train control. The simulation results satisfy all the requirements of train operation according to the scenario and show the effectiveness of the proposed train control system.

Simulation of Noise and Vibration around the Improved Turnout System (개량분기기 인근의 소음진동 시뮬레이션)

  • Eum, Ki-Young;Um, Ju-Hwan;Lee, Chin-Hyung
    • Journal of the Korea Society for Simulation
    • /
    • v.15 no.4
    • /
    • pp.119-128
    • /
    • 2006
  • A turnout system which permits trains to pass from one track to another is a combination of the switch, the crossing, lead rails which are necessary to connect the switch and the crossing, two guard rails and a switch machine for operating the switch. A turnout is the sole moving part among the railway components and has complex configuration, so the safety has always been raised an issue. In Korea, it is planned to adopt the high speed tilting train, which operates at the maximum speed of 200km/h, at conventional lines by the year of 2010. However, for the application of the tilting train to conventional lines, it is prerequisite to establish a stable turnout system allowing the tilting train to pass through it without reducing speed. Therefore, the improved turnout system for the speed-up of conventional lines has been developed and the prototype of the turnout system has been constructed. In this study, simulation of noise and vibration around the improved turnout system was performed in order to predict the generation level of noise and vibration due to passing of the tilting train through the turnout system.

  • PDF

A Study on the Reliability Improvement Plan on Electric Leakage & Ground Fault of Low-voltage Electrical Line (저압전로의 누전.지락에 대한 신뢰성향상 방안에 관한 연구)

  • Kang, Kyung-Won;Yoon, Myung-O;Gu, Seon-Hwan;Song, Young-Joo
    • Fire Science and Engineering
    • /
    • v.25 no.6
    • /
    • pp.136-145
    • /
    • 2011
  • One of a large proportion among the causes of fire is electrical factors, and of fire by electric factors, the accident which accounted for over certain percentage is electric leakage and ground fault. In order to reduce the electric leakage and ground fault, the technical guidelines on the protection of ground fault in the low-voltage electrical line (KECG 1091-2011) was amended for reflecting recent international standard, IEC 60364-4-41, and new conservation methods, which improved the reliability by recovering the facility's all-time use operation and breakdown defect, was on the rise. Accordingly, in this paper, after grasping the fire's status for last 10 years and analyzing the risk of electrical fires, and as a way to improve the electric leakage and ground fault accident which accounted for more than certain percentage, the revision of KECG 1091-2011 will be reviewed. And then, after applying to the preventive conservation methods in order to enhance the protection reliability of electric leakage and ground fault detection, the problems at issue routine inspection scheme and durable years scheme in time-scheduled conservation method are listed, along with suggestion of the problem-solving scheme, and the leakage current integrated monitoring systems and digital electric leakage devices by status monitor conservation method will be proposed.

The Present Status and Vision of Virtual Construction System Development (가상 건설 시스템 개발 현황과 비전)

  • Kim, Jae-Jun;Choi, Cul-Ho;Shin, Hyun-Mok;Jin, Sang-Yoon;Lee, Kwang-Myung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.170-175
    • /
    • 2008
  • The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.

  • PDF

Model Design for Successful Adoption of ERP Cost Management System (ERP 원가관리시스템의 성공적 도입을 위한 모형 설계)

  • 오은해;김창수;이재엽
    • Proceedings of the Korea Association of Information Systems Conference
    • /
    • 2004.11a
    • /
    • pp.349-365
    • /
    • 2004
  • 기업의 또는 부문에서 구축된 각 정보시스템들은 시간이 지남에 따라 기업의 경쟁우위를 확보하기 위해 통합의 필요성이 증대하게 되었는데, 이러한 필요에 의해 제기된 것이 ERP(Enterprise Resource Planning: 전사적 자원관리)이다. 급변하는 기업의 내${\cdot}$외부 환경에 대해 신속하게 대응하기 위해 ERP 시스템을 도입하는 기업들의 수가 증가함에도 불구하고 ERP 원가관리시스템에 대한 연구는 아직까지 그 범위가 한정되었다고 할 수 있다. 본 논문은 ERP 도입 현황 및 원가관리시스템의 도입${\cdot}$설계현황자료를 바탕으로 하여, 중소기업의 ERP 원가관리시스템의 성공적 도입을 위한 방향을 제시하고자 한다. 중소기업에서 ERP 원가관리시스템을 도입할 때는, 원가관리시스템의 특성과 구축 목표, 구조 설계, 원가대상 설정 등과 관련된 다음과 같은 사항들을 고려하여야 성공적인 시스템을 구축할 수 있을 것이다. 첫째, ERP 원가관리시스템 특성 분석단계에서는 원가정보를 구성하는 내용의 충실성뿐만 아니라 정보가 전달${\cdot}$제공되는 범위와 대상의 적합성과 함께 그 표현의 형식 또한 고려되어야 한다. 둘째, ERP 원가관리시스템 구축목표 설정단계에서는 인가관리정보의 산출요건에 대한 명확한 이해와 목표설정을 기반으로 해야 한다. 셋째, ERP 원가 관리시스템 구조 분석 및 선계단계에서는 생산관리시스템 및 원가대상 설정 분석이 이루어져야 한다. 넷째, ERP 원가관리시스템 구현단계에서는 원가관리시스템과 타 계열시스템과의 인터페이스를 고려해야 한다. 따라서 원가관리시스템의 구현 시에는 관련시스템에서 어떠한 정보론 인터페이스 받을 것인가를 명확히 하여 시스템 가동 시에 타 관련시스템과 원활한 연계가 되도록 함으로써 전사적 종합시스템이 되도록 하여야 학 것이다.RS와 제진장치에 대한 전체적인 성능평가를 성공적으로 수행하였으며, 운전결과 및 경험은 향후 상용설비를 위한 기본자료로 활용할 것이다.X>, 그리고 입원기간은 $21.6\pm14.3일(13\~56)$이었다. 수술 후 평균 CK-MB는 $11.3\pm14.1ng/mL$였다. 수술 후 조기 혈관 개존율은 $100\% (24/24)$였다. 모든 환자에서 완전 추적이 가능하였으며 평균 추적기간은 $20.4\pm15.2개월(5\~43)$이었다. 이 기간 중 사망환자나 흉통이 재발한 환자는 없었다. 걸론: 80세 이상 고령의 환자에서 OPCAB은 수술 후 합병증을 줄이고 좋은 결과를 보여 주었다. 그러므로 고령의 환자에서도 관상동맥우회술의 적응증이 되면 적극적으로 수술을 시행할 필요가 있으며, 수술방법은 OPCAB이 좋을 것으로 생각한다서 실용적 개발의 가능성을 보였다.에 따라 현저한 차이가 있었으며 Dimethoate처리$(30^{\circ}C,\; 0.2\%$액에서 24시간)에 의하여 볍씨의 호흡량이 감소되었다. 9) 산소호흡량과 평균발아소요일수와는 $\gamma=-0.945$로 부의 유의한 상관을 보였는데 산소호흡량이 많은 품종은 평균발아소요일수가 짧은 경향을 보였다. 10) 볍씨의 산소호흡량과 Dimethoate 처리에 의한 볍씨의 발아저해도와는 $\gamma=-0,771$의 높은 부의 상관을 보였으며 산색호흡량이 많은 품종이 발아저해도가 낮고 적은 품종에서는 높았다. 현재까지는 그 활동이 11.2년의 주기성을 보여주지만 그 이전에 있어서는 그 활동이 극히 약화되었을 뿐만 아니라 매우 불규칙하다는 것이 Schneider와 Mass(1975)에 의해 밝혀졌다. 결국 1710년대부터 현재까지 우리나라에 있어서 벼멸구와 흰

  • PDF

CALS환경에서 기업간 정보공유의 범위에 관한 연구

  • 고일상
    • Proceedings of the CALSEC Conference
    • /
    • 1999.07a
    • /
    • pp.41-50
    • /
    • 1999
  • 최근의 CALS 시스템 구축 가속화 및 전자상거래 활성화 분위기는 정보기술의 전략적 활용의 초점을 개별기업 위주에서 기업간 협력체제 구축과 이를 바탕으로 하는 기업간 전자적 결합(Electronic Integration)으로 옮기고 있다. 우리는 정보기술의 공유를 기반으로 새로운 기업간의 관계를 구축할 수 있으며, 이러한 관계를 전략적으로 활용함으로써 기존 사업에서의 경쟁우위 뿐만 아니라, 새로운 사업기회를 창출할 수 있다. 관련기업간의 데이터 표준화를 통한 정보의 공유는 CALS 시스템 구축의 바탕이 된다고 할 수 있는데, 정보공유의 범위는 산업별 특성과 제품별 특성에 따라 달라질 수밖에 없으며, 관련기업간의 교섭력(Bargaining Power)에 의해서도 영향을 받게된다. CALS 환경에서는 개별기업의 정보전략에 따라 수직적 협력관계에 있는 기업들간의 정보공유 정도와 수평적 협력관계에 있는 기업들간의 정보공유 정도가 결정된다고 할 수 있다. 정보공유의 범위를 설정하는 데에는 기업간에 이루어지는 업무의 성격, 공급-제조-유통으로 연결되는 관련기업간의 구조 등도 크게 영향을 미치는 것으로 파악되고 있다. 이 연구에서는 CALS 시스템 구축과정에서 우리가 고려할 수 있는 정보공유의 범위를 관련업무공유, 시스템공유, 부품 설비공유, 시설공유 등의 관점에서 분석하여 봄으로써, 각 산업별로 진행되고 있는 시범사업들의 시스템 영역의 범위를 재조명해보고자 한다. 이 연구에서 집중적으로 다루게 될 정보공유의 범위에 대한 내용은 CALS 시스템을 개발하려는 기업들의 응용서비스 개발 및 정보전략 구축에 중요한 공헌을 할 수 있을 것으로 기대된다.진" 사업에 대한 표준 설정을 위하여 노스캐롤라이나주 지방보건소의 "보건교육/건강증진" 표준체제를 예로 들었다. 다음으로, 경제적인 효율면에서 볼 때 "보건교육/건강증진" 사업에는 단기 혹은 장기 투자가치가 있는가 하는 것이다. 새로 태어나는 미국 지방 보건소의 "보건교육/건강증진" 활동은 지역 시민 및 그 단체가 광범위하고도 자연 다발적으로 참여할 때만 성공할 수 있다고 결론 지울 수 있다.한 분야별 전문가시스템 개발을 지양하고 MCRDR이론을 기반으로 한 범용성 있는 전문가시스템 개발 툴의 개발에 관한 연구를 소개한다. 후 새로운 지식을 얻는 반복적인 Explanation-based Data Mining Architecture를 제시하였다. 본 연구의 의의로는 데이타 마이닝을 통한 귀납적 지식생성에 있어 귀납적 오류의 발생을 고메인 지식을 통해 설명가능 함을 보임으로 검증하고 아울러 이러한 설명을 통해 연역적으로 새로운 가설지식을 생성시켜 이를 가설검증방식으로 검증함으로써 귀납적 접근과 연역적 접근의 통합 데이타 마이닝 접근을 제시하였다는데 있다.gical learning to give information necessary to improve the making. program and policy decision making, The objectives of the study are to develop the methodology of modeling the socioeconomic evaluation, and build up the practical socioeconomic evaluation model of the HAN projec

  • PDF

A Development of Active Monitoring and Approach Alarm System for Marine Buoy Protection and Ship Accident Prevention based on Trail Cameras and AIS (해상 부이 보호 및 선박 사고 예방을 위한 트레일 카메라-AIS 연계형 능동감시 및 접근경보 시스템 개발)

  • Hwang, Hun-Gyu;Kim, Bae-Sung;Kim, Hyen-Woo;Gang, Yong-Soo;Kim, Dae-Han
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.22 no.7
    • /
    • pp.1021-1029
    • /
    • 2018
  • The marine buoys are operated in various domains, which are navigation route and danger maker, weather and environment monitoring, military strategical element, etc. If the marine buoy is damaged, there consumes many cost and time for recovery or replacement, because of severe environmental condition, and causes a risk possibility of secondary accident. In this paper, we developed an active monitoring and approach alarm providing system using trail cameras and AIS for protection for the marine buoys. To do this, we analyzed existing researches and similar systems, extracted requirements for enhancement, and designed the system architecture that applied the enhanced elements. The main considerations of system enhancement are: integration of AIS and trail cameras, adopting of phased alarm technique by approaching ships, applying of selective communication module, conducting the image processing of ships for providing alarm, and applying thermal cameras. After that, we developed the system using designed architecture and verified effectiveness of the system based on laboratory or field-level tests.