• Title/Summary/Keyword: 통합공사관리

Search Result 334, Processing Time 0.032 seconds

Development of Data Warehouse for Construction Material Management (건설공사 자재 관리를 위한 데이터 웨어하우스 개발)

  • Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.319-325
    • /
    • 2011
  • During a construction project, construction managers must be provided with material information to help them to make decisions more efficiently without delaying the delivery of material. Construction work can be smoothly performed with the proper material supply. Construction duration depends on several material-related decisions, including the order, delivery, and allocation of material to the correct work location. Hence, it is worthwhile to introduce data warehouse techniques that generate subject-oriented and integrated data to construction material management. The data warehouse for construction material management can perform multidimensional analysis and then define KPIs (Key Performance Index) in order to provide construction managers with construction material information such as lead time, material delivery rate, material installation rate and so on. This research proposes a method of effectively facilitating large amounts of data in the operating systems during the construction management process. In other words, the proposed method can supply structured and multi-perspective material-related information using data warehouse techniques.

Policy Suggestions about the necessity of Separate Order for the Electrical Design (전기설계 분리발주 필요성에 대한 정책적 제언)

  • Nam, Ki-Beom;Yoo, Sang-Bong;Yang, Sun-Sik;Shin, Young-Hoon
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.1450-1451
    • /
    • 2015
  • 우리나라는 지난 '96년 제정한 "전력기술관리법"에 따라 전력시설물 공사에 대한 설계와 감리업무를 실시하고 있지만 "전기공사업법", "정보통신공사업법" 등에서처럼 건축 등 타 분야와의 분리발주를 명확하게 명시하고 있지 않아 발주자, 시공자, 용역업자 등 업계의 혼란을 가중시키고 있어 많은 문제점을 야기시키고 있는 것이 현실이다. 분리발주는 통합발주에 비해 각 공정별 기술력을 확보하고 중소업체와 대형업체간의 공정한 경쟁을 유도함으로써 전력산업 시장경제의 건전성을 확보하는 등 통합발주로 인해 발생시키는 불법하도급, 업계의 혼란, 타 분야와의 경쟁력 약화 등 부정적인 요소를 해결할 수 있는 방안이다. 하지만 법상에서 명확하게 명시하고 있지 않아 모든 전기설계 감리 용역에 대해 분리발주가 되고 있지 않은 것이 현실이므로 거시적 관점에서 전력산업의 미래를 본다면 분리발주가 필요할 것으로 사료된다.

  • PDF

A Study on the Development of Construction Progress Management system based on BIM (BIM 기반의 건설공사 진척관리 시스템 개발을 위한 기초연구)

  • Shin, Yoon-Kyung;Kim, Sun-Hyo;Park, Sung-Han;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.525-528
    • /
    • 2010
  • 본 논문은 BIM기반 건설공사 진척관리 시스템의 개발 방향을 제안하는 것이다. 이를 위해 일차적으로 기존 4D 진척관리프로그램인 Synchro 4D와 Navisworks를 분석을 하여 문제점을 도출했다. 이를 극복하고자 국내실정에 맞는 방안 및 공정과 3D객체 연계의 효과적 방안을 제안하였고 예상공정과 실제공정의 시각적 비교 기능 및 통합건설정보관리 기능 추가를 제시하여 이 프로그램의 본 목적인 효율성 증진을 위해 향상된 진척관리 방식을 제안하고자 하였다.

  • PDF

A Study on the Application of Integrated Management System for Building Energy Efficiency (건물부문의 에너지 효율화를 위한 국가 건물에너지 통합관리 시스템의 활용방안 연구)

  • Yoo, Jung-Hyun;Kim, Jong-Yeob;Hwang, Ha-Jin
    • Land and Housing Review
    • /
    • v.3 no.3
    • /
    • pp.263-270
    • /
    • 2012
  • Energy consumption of building is given a sizable portion in total national energy conservation. From this reason, the integrated management system of national building energy was proposed to manage energy usage and of which feasibility study was demonstrated in Seoul at 2010. Expansion of the application availability for the aforementioned system, energy policies etc. have focused on the building sectors and future uses and developments are investigated. Specially, energy consumption and building documentary DB are useful to validate energy usage for each building and define to remodelling effect before and after. Furthermore, in this study, a number of developments and applications of the system and future uses of energy usage data can be identified.

플로팅 건축의 유해위험방지계획서 작성방법

  • No, Tae-Min;An, Hong-Seop
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2014.10a
    • /
    • pp.213-215
    • /
    • 2014
  • 모든 공사에 작성해야 하는 안전관리에 대한 계획서를 플로팅 건축의 특성에 맞춰 작성하기 위한 작성 방법 및 공종, 순서 등에 대하여 제시하였다.

  • PDF

A Basis Study on the Integrated System for the Evaluation and Public Announcing System of the Contractor's Construction Capacity (시공능력평가 통합시스템 기반구축에 관한 기초연구)

  • Noh, Jae-Yoon;Jun, Young-Joon;Park, Eun-Soo;Lee, Tai-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.568-571
    • /
    • 2008
  • To help a owner selecting proper contractors about the specified contract, the Evaluation and Public Announcing System of the Contractor's Construction Capacity has been introduced since 1997. But, the system has been done violence to its original meaning and purpose as time went on. When annually announcing the Contractor's Construction Capacity, especially, there was frequently a large range of opinion on the issues. On that account, MLTM(Ministry of Land, Transport and Maritime Affairs) has had to make a alteration to improve those and is making efforts for a constructive policy now. The purpose of this paper is to conduct a basis study on the Integrated System after reflecting points to be considered about improvements and the current of the times.

  • PDF

A Study on the Design of XML Schema for the Metadata of Construction Information (건설공사정보 메타데이터의 XML 스키마 설계에 관한 연구)

  • Park, Jae-Won;Choi, Jae-Hwang
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.36 no.3
    • /
    • pp.155-179
    • /
    • 2002
  • The purpose of this study is to extract metadata based on Dublin Core from national construction information DBs, to design XML schema from the extracted metadata and to apply the previous works to integrated information retrieval system. To extract metadata, co-work was performed with librarians in the field of construction information, and. as a result, twelve metadata elements from Dublin Core and one administrative metadata could be extracted. Based on the investigation and analysis of those thirteen metadata elements, XML schema design process was described in detail. finally, the service environments of integrated information retrieval system to which XML schema was applied was introduced. Further study was also provided.

Design and Implementation of Piping Spool Management Android Application using QR Code (QR Code를 활용한 배관 스풀관리용 안드로이드 어플리케이션 설계 및 구현)

  • Jeon, Sang-Moon;Kim, Kyoung-Su
    • Journal of Digital Contents Society
    • /
    • v.13 no.4
    • /
    • pp.609-616
    • /
    • 2012
  • Plumbing of the plant project is an important discipline. Now workers on the construction site, carry hundreds of piping spool drawings and documents, record the Spool Stage data. Then, The data is input into the system or has been documented in the field office. Because of the work-flow, duplication work occurs. As a result, it is reducing the effectiveness of the Plumbing and causes schedule delays. Also, To manage the integration process, there is a problem, it takes a lot of time. Therefore, The study is conducted to design and implementation of piping spool management Android Application using QR Code. The Application will contribute to the management to the integration of piping work process.

Analysis of Automatic Meter Reading Systems (IBM, Oracle, and Itron) (국외 상수도 원격검침 시스템(IBM, Oracle, Itron) 분석)

  • Joo, Jin Chul;Kim, Juhwan;Lee, Doojin;Choi, Taeho;Kim, Jong Kyu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.264-264
    • /
    • 2017
  • 국외의 상수도 원격검침 시스템 내 데이터 전송방식은 도시 규모, 계량기의 밀도, 전력공급 여부 및 통신망의 설치 여부 등을 종합적으로 고려하여 결정되었다. 대부분의 스마트워터미터 제조업체들은 계량기의 부호기가 공급하는 판독 내용(데이터)을 전송할 검침단말기와 근거리 통신망(neighborhood area network)을 연계하여 개발 및 판매하였으며, 자체 소유 통신 프로토콜을 사용하여 라디오 주파수(RF) 통신 기술을 사용하고 있다. 광역통신망(wide area network)의 경우, 노드(말단의 계량기 및 센서)들과 이에 연결된 통신망 들을 포함한 네트웍의 배열이나 구성이 스타(star), 메쉬(mesh), 버스(bus), 나무(tree) 등의 형태로 통신망이 구성되어 있으나, 스타와 메쉬형 통신망 구성형태가 가장 널리 활용되는 것으로 조사되었다. 시스템 통합운영관리 업체들인 IBM, Oracle, Itron 등은 용수 인프라 관리 또는 통합네트워크 솔루션 등의 통합 물관리 시스템(integrated water management system)을 개발하여 현장적용을 하고 있으며, 원격검침 시스템을 통해 고객들의 현재 소비량과 과거 누적 소비량, 누수 감지 서비스 및 실시간 요금 고지 등을 실시간으로 웹 포털과 앱을 통해 제공하고 있다. 또한, 일부 제조업체들은 도시 용수공급/소비 관리자가 주민의 용수사용량을 모니터링하여 일평균 용수사용량 및 사용 경향을 파악하고, 누수를 검지하여 복구 및 용수 사용 지속가능성 지수를 제시하고, 실시간으로 주민의 용수사용량 관련 데이터를 모니터링하여 용수공급의 최적화를 위한 의사결정지원 서비스를 용수공급자에게 제공하고 있다. 최근에는 인공지능을 활용해 가정용수의 용도별(세탁용수, 화장실용수, 샤워용수, 식기세척용수 등) 사용량 곡선을 패터닝하여 profiling 기법을 도입해, 스마트워터미터에서 용수사용량이 통합되어 검지될 시 용수사용량의 세부 용도별 re-profiling 기법을 도입하여 가정용수내 과소비되는 지점을 도출 후 절감을 유도하는 기술이 개발 중이다. 또한, 미래 용수 사용량 예측을 위해 다양한 시계열 자료를 분석하는 선형 종속 모형(자기회귀모형, 자기회귀이동평균모형, 자기회귀적분이동평균모형 등)과 비선형 종속 모형(Fuzzy Logic, Neural Network, Genetic Algorithm 등)을 활용한 예측기능이 구축되어 상호 비교하여 최적의 용수사용량 예측 도구를 제공되고 있다.

  • PDF