• Title/Summary/Keyword: 토지보상

Search Result 59, Processing Time 0.024 seconds

A feasibility modeling of potential dam site for hydroelectricity based on ASTGTM DEM data (ASTGTM 전지구 DEM 기반의 수력발전댐 적지분석 사전모델링)

  • Jang, Wonjin;Lee, Yonggwan;Kim, Seongjoon
    • Journal of Korea Water Resources Association
    • /
    • v.53 no.7
    • /
    • pp.545-555
    • /
    • 2020
  • A feasibility modeling for potential hydroelectric dam site selection was suggested using 1 sec ASTGTM (ASTER Global Digital Elevation Model) and Terra/Aqua MODIS (Moderate Resolution Imaging Spectroradiometer) derived land use (MCD12Q1) data. The modeling includes DEM pre-processing of peak, sink, and flat, river network generation, watershed delineation and segmentation, terrain analysis of stream cross section and reservoir storage, and estimation of submerged area for compensation. The modeling algorithms were developed using Python and as an open source GIS. When a user-defined stream point is selected, the model evaluates potential hydroelectric head, reservoir surface area and storage capacity curve, watershed time of concentration from DEM, and compensation area from land use data. The model was tested for 4 locations of already constructed Buhang, BohyunMountain, Sungdeok, and Yeongju dams. The modeling results obtained maximum possible heads of 37.0, 67.0, 73.0, 42.0 m, surface areas of 1.81, 2.4, 2.8, 8.8 ㎢, storages of 35.9, 68.0, 91.3, 168.3×106 ㎥ respectively. BohyunMountain and Sungdeok show validity but in case of Buhang and Yeongju dams have maximum head errors. These errors came from the stream generation error due to ASTGTM. So, wrong dam watershed boundary limit the head. This study showed a possibility to estimate potential hydroelectric dam sites before field investigation especially for overseas project.

A Study on Business Value for the Creation of a Private Park regarding Long-term Non-executed Urban Parks - Focused on Long-term Non-executed Neighborhood Park in Gwangju Metropolitan City - (장기미집행 도시공원의 민간공원 조성을 위한 사업성 연구 - 광주광역시 장기미집행 근린공원을 중심으로 -)

  • Kim, Ho-Gyeom;Kim, Dong-Chan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.5
    • /
    • pp.81-91
    • /
    • 2016
  • The study shows solutions of long-term unexecuted urban park and activation plans to facilitate the business promotion of Private Park Developers. This study conducted a feasibility analysis to determine if the business of a special case is applicable. The result of this study is as follows about three long-term unexecuted urban parks in Gwangju Metropolitan City's City Park. First, the three long-term unexecuted urban parks in Gwangju Metropolitan City's City Park are the forest type Neighborhood Parks. Businesses of a special case's park developing cost(average 0.4%) have a relatively low percentage. It is most affected by Land Compensation(average 33.8%) and building construction expenses(average 59.1%). Second, long-term unexecuted urban parks' Land Compensation and building construction expenses seed capital are excessive. The Bongsan Park balance floor space index is 179 percent; a reasonable profit floor space index is 220 percent. The Mareuk Park balance floor space index is 351 percent; a reasonable profit floor space index is 420 percent. The Jungoe Park balance floor space index is 327 percent; a reasonable profit floor space index is 400 percent. Third, to facilitate the business of special cases in deliberating, Bongsan Park should change its second class general residential area. Jungoe Park must change the quasi-residential area and semi-residential area. Mareuk Park must change the general commercial area. In this way, the feasibility of promoting private park projects will be improved.

Citizen's Attitude to Environmental Facilities (환경기초시설에 대한 시민 의식 조사)

  • Chung, Jae-Chun;Chung, Won-Tae;Tak, Seung-Je;Kang, Hun
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.3 no.2
    • /
    • pp.97-102
    • /
    • 1995
  • A questionare survey was performed to investigate the citizen's attitude concerning waste treatment facilities. Most people recognized the seriousness of the waste treatment problem and think that more composting facilities should be built. People dislike most the landfill facility, followed by the nightsoil treatment facility, the incineration facility and the composting facility. Most people answered that the disirable distance from their house to the treatment facility should be farther than 4km for the landfill facility, farther than 2km for incineration and composting facilities and farther than 1km for the wastewater treatment plant. Most people want moving cost+land price+inconvience suffering cost (amount equal to the land prize+building prize) for their retrieval. About 30% of people answered that they will not accept any waste treatment facility even though it is perfect.

  • PDF

A Study on the Reform Measures for the Act on the Acqusition of Land for the Public Undertakings and Compensation : Focused on the Case of Harbor Construction ("공익사업을 위한 토지 등의 취득 및 보상에 관한 법률"에 의한 어업보상 적용사례와 문제점 및 개선방안에 대한 연구 : 항만 개발사업을 중심으로)

  • Moon, Jeong-Gab;Kang, Yong-Joo
    • The Journal of Fisheries Business Administration
    • /
    • v.37 no.3 s.72
    • /
    • pp.85-108
    • /
    • 2006
  • The government enforced 'Act on the acquisition of land for the public undertakings and compensation' commenced on the 1st of January 2003 to faithfully protect the property right of people and to scheme the effiecient drive of public works by systematizing the procedures and the standards of compensation and reforming irrational systems. The previous act regulated to compensate a rightful person of fishery right, who is in a nearby area of public works enforcement zone for actual loss according to the level of damage. On the contrary, as for the fishery damage happened at the outside of public works enforcement zone, the act regulates to compensate for a loss when it is actullay occurred and affirmed. So, the related act was amended as, so called, Post Factum Compensation. With regard to the Post Factum Compensation regulation for the fishery damage occurred at the outside of this public works enforcement zone, many objections and problems are raised as it is not clearly understood of the nature of the fishery compensation. However, this paper is not intended to mention the right or wrong of the current law, but to discuss the problems or remedies of 'Act on the acquisition of land for the public undertakings and compensation' after examining cases of public works which was enforced for the fishery compensation within the current law.

  • PDF

A Study on the Application of GSIS in Land-Use Planning - On the Selection of Optimum Site for the Waste Landfill - (토지이용계획에 있어서 GSIS의 응용에 관한 연구 - 쓰레기 매립장의 적지 선정을 중심으로 -)

  • Yang, In Tae;Kim, Eung Nam;Yun, Young Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.13 no.4
    • /
    • pp.189-197
    • /
    • 1993
  • The management of wastes within the urban landscape has become a critical concern to both local governments and inhabitants. With landfill capacities steadily decreasing, rapid growth of economy, population and urbanization, citizen awareness of the environment and public health problems occured by existing landfill sites make difficulties in selecting the landfill site. Therefore, this study has been performed to select the optimum waste landfill site using GSIS methodology to reduce the time, cost and effort. As the result of this study, we can investigate many factors synthetically which could not be handled by the former method using hands in the site selection for waste landfill, and we can carry out economically the work of selecting suitable site throughout the vast area.

  • PDF

Estimating Economic Loss due to Wildlife Damage to Agriculture and Forestry Production Near Protected Areas: Case of Mountain Villages in Gurye-gun, Korea (보호지역 인근 야생동물에 의한 농작물과 임산물 피해액 추정: 구례군 6개 산촌마을의 사례)

  • Park, So-Hee;YOUN, Yeo-Chang
    • Journal of Korean Society of Forest Science
    • /
    • v.108 no.4
    • /
    • pp.618-627
    • /
    • 2019
  • An increase in damage to crops and facilities caused by wildlife such as wild boar causes serious social and economic problems to the rural economy in Korea. This study aims to estimate the economic losses incurred to rural households in mountain villages near protected areas in Korea due to the damage to agricultural and forestry production by wildlife. The case of mountain villages located in Toji-myeon, Gurye-gun near the Jirisan National Park was studied as an example. Data were collected by interviewing 84 households across six mountain villages in April and June 2016. The results indicate that the economic losses due to wildlife damage in 2015 were estimated to be 1.65 million KRW per household, which is a total of 138.63 million KRW for the 84 households. Among local products, the most damaged products were chestnut, fern-brake, wild pear, peach, and potato, whereas the most damaged products per production area were sweet potato, peach, corn, and potato. The potential economic losses caused by wildlife damage to agricultural and forestry production in whole Gurye-gun area was estimated to be around 4.0 billion KRW in 2015. However, the municipal government budget for the compensation of wildlife damage was only 0.9 percent of the potential rural economic losses caused by wildlife damage in 2015. The results of our study suggest that the compensation scheme for wildlife damage is inadequate in the respect of social justice. Considering the low financial capacity of the municipalities in mountain areas, the central government should take a progressive responsibility by allocating more financial resources for compensation of economic losses of rural households due to wildlife damage. The equitable and effective governance of wildlife conservation is required for sustainable development of rural communities near protected areas.

Applying the TDR for Urban Landscape Management: Focusing on the Use of REITs (도시 경관관리를 위한 개발권양도제 정책도입에 관한 연구: 리츠 접목을 중심으로)

  • Dongoh Ha;Jaeweon Yeom;Juchul Jung
    • Journal of Environmental Impact Assessment
    • /
    • v.32 no.4
    • /
    • pp.242-250
    • /
    • 2023
  • The continuity of urban space is being destroyed by disorderly high-rise development caused by reckless development, and the resulting deterioration of urban landscape is emerging as a major problem. Disordered high-rise development is adversely affecting the urban environment, such as depriving residents of the basic rights of view and sunlight and privatizing the scenery that urban residents should enjoy together. In order to create a continuous urban landscape, indiscriminate high-rise development is restricted and compensation for the affected areas is needed. Various regulations have been carried out to this end, but it is difficult to overcome the pressure and damage to high-rise development by regulations alone. Accordingly, discussions have been underway to introduce a compensation system. Among them, discussions on the introduction of a 'Transfer of Development Right' (TDR) in which land ownership and development rights are separated and compensated for development rights have been drawing attention. However, in Korea, it is difficult to introduce the system due to various problems related to the separation of development rights. In order to overcome the limitations of the introduction of TDR, this paper analyzed the concepts and characteristics of 'Real Estate Investment Trusts' (REITs) and presented a policy model for the development right transfer system incorporating REITs for effective landscape management.

An Approach to Enhance the Unfair Area in the Rural Landscape (농촌 조건불리지역의 경관개선을 위한 접근)

  • Jang, Gab-Sue;Park, In-Hwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.36 no.2
    • /
    • pp.60-68
    • /
    • 2008
  • Three land-use limitations including water hazard, soil erosion and fallow potential were evaluated to define an unfair area. Landscape indices in the unfair areas, defined by evaluations before and after landscape enhancement, were computed by Fragstats v3.3 and compared in order to propose a landscape enhancement plan. The results are as follows: First, as a result of the land evaluation, 388.56ha was analyzed for the 1st class(S1), 623.25ha for the 2nd class(S2), 138.08ha(S3s: 82.47ha, S3e: 51.88ha) for the 3rd class(S3), 230.44ha(N1w: 194.91ha, N1e: 23.09ha, N1es: 13.94ha) for the 4th class(N1), and 67.91ha(N2w: 60. 89ha, N2es: 7.02ha) for the 5th class(N2). The classes under the 3rd class(including the 3rd class) were determined as an unfair area, and proposed landscape enhancement for them. Second, it was proposed that unfair areas with potential water hazards(N1 w, N2w) be restored as a wetland and buffer zone. At this point, the farmers owning these fields could be compensated using the direct payment for landscape conservation(DPLC). Areas witha relatively lower slope(S3e) or a steep slope(N1e) containing soil erodibility potential were proposed to be restored as a sod-culture-applied field and substitute vegetation or potentially natural vegetation, respectively. The unfair areas having fallow potential(S3s, N1es, N2es) were proposed to apply special use crops for the S3s fields, native plants for the N1es fields, and intended fallow for the N2es fields. Third, after landscape enhancement, theforest had higher values in the indices of NP, PLAND, LSI, IJI, and TCA, while paddy and upland had lower values in most indices except NP and LSI. The forest patches increased and were more plentiful with their restoration and had much greater possibility to join with nearby patches. With continued restoration, forest patches will have a large core area and small number of patches due to the conglomeration of patches, which positively influences the species of diversity in the forest patches.

Institutional Changes and Path Dependence to Private Parks - Focused on the Urban Park-Related Laws from 1967~2005 - (민간공원 관련 제도의 변천과 경로의존성 - 1967년부터 2005년까지 도시공원 법령을 중심으로 -)

  • Oh, Chang-Song
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.47 no.2
    • /
    • pp.133-145
    • /
    • 2019
  • This study was raised by the need to explain why the problems related to private parks have been sustained. In order to identify the fundamental cause, it is necessary to analyze the historical and institutional context of private parks. Therefore, the purpose of this study is to identify the direction of change in the private park system and to derive the characteristics of the system as it currently appears. The framework based on the historical institutionalism was divided into the Park Act (1967-1980), the former of Urban Park Act (1980-1993) and the late of Urban Park Act (1993-2005), and each was assessed using the analysis elements of the institutional environment and the outcomes of implementation. The analysis elements interpreted the path dependency, in which the inertia toward the choice of institution is maintained, despite the change in the environment. The institution took a special form of 'negative systeme' and secured profitability by expanding the types of park facilities while mitigating the criteria. Additionally, the designation of private park promoters as a landowner acted as a means of compensating those with property rights to unexecuted urban parks. The expectation effectiveness on urban park creation was insufficient and the environmental regulatory functions were weakened. Thus, historically, the private park system in Korea has experienced an 'institutional decoupling' as the purpose of the system and the results of actual outcomes are not consistent.

Study on Assessment Institution of Urban Ecosystem in Korea (우리 나라의 도시생태계 평가제도 고찰)

  • 오충현
    • Korean Journal of Environment and Ecology
    • /
    • v.16 no.2
    • /
    • pp.188-194
    • /
    • 2002
  • Assessment institution of urban ecosystem is divided into ‘Urban Planning Act’and ‘Environmental Management Act’in Korea. The assessment institution of urban planning is divided into ‘Standard of land development approval’and ‘Environmental assessment of urban planning’. The institution of environmental management is divided into ‘Environmental impact assessment’and ‘Advance environmental assessment’. Assessment institution of urban ecosystem is progressed very slowly, because of development oriented policy. And so there are many problems that objective assessment method is not invented except ‘Degree of growing tree number per unit area’and ‘Degree of human disturbance of vegetation’, and insufficiency of conservation measures or post evaluation, etc. Activation of assessment institution of urban ecosystem is necessary followed countermeasures in Korea. (1) Development of objective assessment method for urban ecosystem as biotope map, (2) Appointment of censer-vation zone or consideration of damage for high value in conservation, (3) Parallel establishment of development and ecosystem conservation plan, and enforcing post evaluation