• Title/Summary/Keyword: 토목 공정 계획

Search Result 38, Processing Time 0.024 seconds

A Study on Curing Level Prediction Model for Varying Chemical Composition of Epoxy Asphalt Mixture (에폭시 아스팔트 혼합물의 에폭시 화학 조성에 따른 양생수준 예측)

  • Jo, Shin Haeng;Kim, Nakseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.2
    • /
    • pp.465-470
    • /
    • 2015
  • The curing of epoxy asphalt mixture depends on the chemical reaction of epoxy resin and the curing agent. The curing level of epoxy asphalt mixture needs to be predicted in order to decide traffic opening time and to establish further construction plans. In this study, chemical analysis of the prediction model was executed to expand the applicability of the previous prediction model. Consequently, the curing level prediction model of epoxy asphalt concrete mixture was proposed using the concentration ratio and the acid value ratio. According to the results of outdoor curing experiments, the final prediction model showed that the correlation coefficient is greater than 0.971. Precise prediction results of different composition epoxy asphalt were obtained by reflecting the chemical composition ratios in the curing level prediction model.

A Study on the Development of Work-Crew Based Daily-Productivity for Representative B.O.Q Item in River Conservation Project (하천공사 대표공종의 작업조 구성 및 생산성 정보 개발)

  • Yoo, Duk-Yul;Park, Hyung-Keun;Lim, Hyeong-Min
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2519-2528
    • /
    • 2013
  • The standard of estimate is being used as basic material for appropriating construction expenses of public institutions and private institutions. The present thesis aims to propose a new form of a standard of estimate and a calculation method of work amount of equipment by targeting a representative construction type selected at river reservation work. The present thesis expects that the convenience of users can be expanded by improving applicability of a standard of estimate and simplifying a calculation process of work amount of equipment in a process planning stage so that the provision of work crew lineup information and daily productivity information is possible by a standard of estimate. In case of river conservation work, because the variables called work conditions act very largely, there exists much difficulty for generalizing productivity information and work amount of equipment, but if its accuracy could be enhanced by improving continuous productivity information and work amount information of equipment, the simplification of process planning establishment and cumulative process through a standard of estimate would be possible.

Analysis of Excavation Speed and Direct Construction Cost Based on the Operating Productivities of TBM Method Site (TBM 굴착 공법 적용 현장의 생산성 분석을 통한 암질별 굴진속도 및 직접공사비 분석)

  • Song, Young Sun;Park, Hong Tae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.6D
    • /
    • pp.637-643
    • /
    • 2012
  • This research collected work drilling report of TBM method site developed by WRITH company to TBM equipment company in Germany and analyzed work operating productivity. Based Oil the data analyzed TBM operating productivity, This research derived and presented excavation speed (m/day) by TBM diameter (3.0m, 3.5m, 3.8m) and rock. Also, based on the excavation speed (m/day) by TBM diameter, This research estimated a day direct construction cost and total direct construction costs by applying a direct construction cost which spent on per 1m. When we perform a similar geological construction in the future, excavation speed and direct construction cost which were derived by TBM diameter and rock is thinking the effective utilization data to estimate construction cost and plan schedule management before the start of construction.

An Earthwork Districting Model for Large Construction Projects (단지공사의 토공구획 계획 모델)

  • Baek, Hyeon Gi;Kang, Sang Hyeok;Seo, Jong Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.3
    • /
    • pp.715-723
    • /
    • 2015
  • Earthwork in a large construction project such as a land development generally costs 20-30% of the total cost. The earthmoving process, comprising of four repetitive tasks: loading, hauling, unloading, returning, is quite simple and it does not need delicate or advanced techniques. Therefore, earthmoving earthwork planning can heavily affect the cost and time., and Even a slight deviation from the plan can increase or decrease the cost and time. This study presents a planning model that minimizes average haul distance in a large complex construction project. Based on earthwork planning, practitioners' heuristics, a districting algorithm and Simulated Annealing algorithm were employed to build the model. Districting algorithm plays a role that divides in dividing an earthmoving area into several sections. Simulated annealing provides a function that decides whether a new generated solution is confident. Finally, the proposed model was applied to a real earthmoving project of a large land development. It was found that the model showed approximately 14% improvement in average hauling distance compared to the actual design plan.

Exploring Delays of The Mega Construction Project: The Case of Korea High Speed Railway (대형 건설사업의 공기지연분석: 경부고속철도 건설사업을 중심으로)

  • Han, Seung Heon;Yun, Sung Min;Lee, Sang Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.839-848
    • /
    • 2006
  • Korea has become the 5th country to own and operate the high speed railroad in 2004. However, there were many difficulties until Koreans enjoy the first bullet train service with the average hourly speed of 300km. The high speed railroad requires elevated quality standards differently from the traditional railways. In addition to the technical difficulties, the construction project itself was an unpleasant case with huge delays and cost overruns mainly due to the lack of experiences, deficiency of owner$^{\circ}{\O}$s role, and increase of public resistances triggered by environmental concerns. This paper analyzes the reasons for delays on this mega-project. With respect to the characteristics of the whole project level, it is very complicated/linear project, whose total length is around 412 km with the composition of various sections in the route of the railway which have basically different conditions. For that reason, the analysis is performed in both macro and micro level. First, macroscopic analysis is performed to find critical subdivisions in the railway route that induces the significant delay in the opening due date. Then, microscopic analysis is followed to quantify the causes and effects of delays focused on these critical subdivisions in more detailed way. Finally, this paper provides lessons learned from this project to avoid the decisive delays in performing the similar large-scaled projects.

Optimal Period by Calculating and Appling Correction Factor based on Setting of Non-Working Days of Construction Projects (건설공사의 작업불능일 기준설정에 의한 보정계수 계산 및 적용을 통한 최적공기 산정)

  • Lee, Pil-Yoon;Lee, Seong-Won;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.669-676
    • /
    • 2018
  • Schedule management in construction work is an important step for determining the construction period. On the other hand, there is a difference between the planned schedule and execution schedule because the estimation and calculation of Non-Working days, in which possible at the design stage is not performed properly. This paper proposes a method for estimating the working days by analyzing characteristics of the major work type and estimating the Non-Working days reflecting the Chuseok and New Year Holidays, which is the closest method to the actual work in the schedule planning. By applying the correction factor of the existing method and the improved method for the same construction in the same site, improved method was reduced by 22 days (9.1%) based on the actual working days. The importance of schedule management was confirmed as an example by comparing the data before and after the application of the standard (plan). These results show that the schedule delays, which are caused by the inconsistency between actual working days calculation that had been practiced conventionally and the working days on the schedule table, can be prevented. In addition, it will help to establish a schedule plan that is closer to reality.

Development of Activity and WBS for Integrated Cost and Schedule Control Process in Bridge Works (공정$\cdot$공사비 통합관리를 위한 Activity 및 WBS 구축 방안 -교량공사 예시)

  • Kim Jung-Ki;Lee Young-Dae;Kim Soo-Yong;Park Hyeo;Kim Sung-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.406-409
    • /
    • 2001
  • This study refers to development of WBS(Work Breakdown Structure) and Activity sample for integrated cost and schedule control system of sample bridge work in the field. The conclusions from this study may be summarized as following 1. It showed that the level of detail to network's activities depend upon schedule's intended purpose. 2. It is more effective 'activity to cost package model' than 'activity to resource model', for integrated cost and schedule control reflect the characteristics of domestic construction industry.

  • PDF

Management of Construction Fields Information Using Low Altitude Close-range Aerial Images (저고도 근접 항공영상을 이용한 현장정보관리)

  • Cho, Young Sun;Lim, No Yeol;Joung, Woo Su;Jung, Sung Heuk;Choi, Seok Keun
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.32 no.5
    • /
    • pp.551-560
    • /
    • 2014
  • Compare to other industrial sites, the civil construction work not only takes longer time but also has made of complicated processes, such as the integrated management, process control, and quality control until the completion. However, it is hard to take control the construction sites, since numerous issues are always emerged. The study purposes on providing the dataset to synthetically manage and monitor the civil construction site, main design, drawings, process, construction cost, and others at real-time by using the low altitude close-range aerial images, based on UAV, and the GPS surveying method for treating the three-dimensional spatial information quickly and accurately. As a result, we could provide the latest information for the quick decision-making following from planning to completion of the construction, and objective site evaluation by the high-resolution three-dimensional spatial information and drawings. Also, the present map, longitudinal map, and cross sectional view are developed to provide various datasets rapidly, such as earthwork volume table, specifications, and transition of ground level.

Estimation of Cycle Time for Construction Process of NATM Tunnel by using RFID Technology (RFID기술을 이용한 NATM터널 작업 프로세스의 사이클타임 산정방안 연구)

  • Park, NamJin;Kim, HyounSeung;Moon, HyounSeok;Kang, LeenSeok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.1D
    • /
    • pp.41-49
    • /
    • 2012
  • Radio Frequency Identification(RFID) technology, which replace BAR CODE technology that has been widely utilizing in the field of the manufacturing industry for a long time, has been proven in the whole industries including national defense, transportation, and construction as well as manufacturing industry. Recently, with this trend, researches for adapting the RFID technology have been attempting continually centering on the architectural project in the construction industry. However, those researches are mainly focusing on the experimental utilization such as simple activity and material management. To solve these issues, this study demonstrated methodologies for adapting the RFID technology by the construction steps aiming to analyze cycle time of five types of construction process to the NATM method of tunneling work. Besides, the application of RFID technology in civil engineering work was verified by demonstrating the suggested methodology to actual sites. Therefore, it is expected that the suggested methodology will be utilized for predicting the progress rate and establishing of follow-up work plans, and the site applicability of the RFID technology will be expanded to the civil engineering projects.

A Study on the Construction Management Method based on BIM for Civil Engineering Project (토목시설물에 대한 BIM기반 공사관리 기법 연구)

  • Kim, Sung-Hoon;Lee, Sang-Ho;Nam, Sang-Hyeok;Sun, Oh-Young
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.24 no.4
    • /
    • pp.463-469
    • /
    • 2011
  • BIM(Building Information Modeling) technologies should be applied for the construction life cycle to maximize its efficiency, but the utilization for the construction phase has been significantly lower than that for the planning and design phase. Recently, some of BIM techniques such as 3D design review, 4D schedule management and so on are being introduced for efficient managing to the big national construction projects. In this study, the utilization plans of BIM are presented for the construction phase of civil engineering facilities. The methods of utilization of BIM are discussed for each type of construction, and the techniques applied to the Seoul Subway Lot No. 919 are analyzed for checking the applicability and usability. In particular, a web construction management system based on BIM can help field engineers, headquarters and contractors to use BIM more effectively, and it can be extended to maintenance phase for more efficiencies.