• Title/Summary/Keyword: 터널 특성 요인

Search Result 79, Processing Time 0.018 seconds

Risk Assessment with the Development of CAES (Compressed Air Energy Storage) Underground Storage Cavern (CAES(Compresses Air Energy Storage) 지하 저장 공동 개발에 따른 리스크 사정)

  • Yoon, Yong-Kyun;Seo, Saem-Mul;Choi, Byung-Hee
    • Tunnel and Underground Space
    • /
    • v.23 no.4
    • /
    • pp.319-325
    • /
    • 2013
  • The objective of this study is to assess risks which might occur in connection with the storage of the highly compressed air in underground opening. Risk factors were selected throughout literature survey and analysis for the characteristic of CAES. Large risk factors were categorized in three components; planning and design phase, construction phase, and operation & maintenance phases. Large category was composed of 8 medium risk groups and 24 sub-risks. AHP technique was applied in order to analyze the questionnaires answered by experts and high-risk factors were selected by evaluating the relative importance of risks. AHP analysis showed that the operation & maintenance phases are the highest risk group among three components of large category and the highest risk group of eight medium risk groups is risk associated with the quality and safety. Risk having the highest risk level in 24 sub-risks is evaluated to be a failure of tightness security of inner containment storing compressed air.

An Analysis of Multiple-Vehicle Accidents on Freeways Using Multinomial Logit Model (다항로짓모형을 이용한 고속도로 다중추돌사고 특성 분석)

  • Jeon, Hyeonmyeong;Kim, Jinhee
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.19 no.5
    • /
    • pp.1-14
    • /
    • 2020
  • The aim of this study is to analyze effects of factors on the number of vehicles involved in traffic accidents on freeway sections. In previous studies about traffic accident severity, the analysis of accidents involving multiple vehicles was insufficient. However, multiple-vehicle accidents are likely to cause casualties and are the main reasons increasing accident duration and social costs. In this study, the number of vehicles involved in an accident was interpreted as the result of the accident, not as the cause of the accident, and the impacts of each accident factor were analyzed using a multinomial logit model. The results indicate that multiple-vehicle accidents are mainly related to following factors: nighttime, driver's faults, obstacles on the road, a downhill slope, heavy vehicles, and freeway mainline sections including tunnels and bridges.

Characteristics of Night Specialized Traffic Accident Hotspot Using Continuous Risk Profile (CRP) Analysis (CRP (Continuous Risk Profile) 분석을 이용한 야간 특화 교통사고 다발구간의 특성)

  • Kim, Heesoo;Oh, Heungun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.1
    • /
    • pp.49-56
    • /
    • 2021
  • The purpose of this study is to develop a methodology to select a cluster of night traffic accidents using CRP (Continuous Risk Profile) analysis. the other purpose of this study is to present the characteristics of the traffic accident cluster section selected at night using CRP analysis. The CRP analysis was performed considering traffic volume of target routes through traffic accident data. In addition, variables were set according to the freeway sections. the method of subtracting the daytime CRP from the nighttime CRP was used to analyze the nighttime traffic accident. As a result, Using the CRP analysis, the sections of hotspot were identified and plotted based on traffic accidents. Also, the sections where traffic accidents are frequent were those where IC or Tunnels were installed, and there was a deviation from the general section. In conclusion, CRP analysis could be used to calculate the frequent section of specialized traffic accidents at night, and it was selected as a point in need of improvement due to the frequent occurrence of specialized traffic accidents at night in the section where IC or tunnel facilities are installed. In addition, it is inferred that the number of specialized traffic accidents at night in the section where IC or tunnel facilities are installed is a factor in the problem of night visibility due to lighting facilities.

A re-appraisal of scoring items in state assessment of NATM tunnel considering influencing factors causing longitudinal cracks (종방향균열 영향인자 분석을 통한 NATM터널 정밀안전진단 상태평가 항목의 재검토)

  • Choo, Jin-Ho;Yoo, Chang-Kyoon;Oh, Young-Chul;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.4
    • /
    • pp.479-499
    • /
    • 2019
  • State assessment of an operational tunnel is usually done by performing visual inspection and durability tests by following the detailed guideline for safety inspection (SI) and/ or precision inspection for safety and diagnosis (PISD). In this study, 12 NATM tunnels, which have been operational for more than 10 years, were inspected to figure out the cause of longitudinal cracks for the purpose of modifying the scoring items in the state assessment NATM tunnel related to the longitudinal crack and the thickness of concrete lining. All investigated tunnels were classified into four groups depending on the shape and usage of each tunnel. The causes of longitudinal crack occurrence were analyzed by investigating the correlations between the longitudinal crack and the following four factors: the patterns of ground excavation; construction state of primary support system; characteristics of material properties of the concrete lining; and thickness of lining which was obtained by Ground Penetration Radar (GPR) tests. It was found that influencing factors causing longitudinal cracks in the lining were closely related with the construction condition of the primary support system, i.e. shotcrete, rockbolt, and steel-rib; crack occurrences were not much affected by the excavation patterns. As for the properties of concrete lining materials, occurrence of the longitudinal crack was mostly affected by the following three items: w/c ratio; contents of cement; and strength of lining. When estimating the lining thickness of the concrete lining by GPR tests and taking thickness effect into account in the statement assessment, it was concluded that increase of the index score by an average of 0.03 (ranging from 0.01 up to 0.071) is needed; a more realistic way of state assessment should be proposed in which the increased index score caused by lack of lining thickness should be taken into account.

Effects of Input Parameters in Numerical Modelling of Dynamic Ground Motion under Blasting Impact (발파하중을 받는 지반의 동적 거동 수치 모델링에서 입력변수의 영향)

  • Ryu, Chang-Ha;Choi, Byung-Hee;Jang, Hyung-Su;Kang, Myoung-Soo
    • Tunnel and Underground Space
    • /
    • v.25 no.3
    • /
    • pp.255-263
    • /
    • 2015
  • Explosive blasting is a very useful tool for mining and civil engineering applications. It, however, may cause severe environmental hazards on adjacent structures due to blasting impact. Blast engineers try to make optimum blast design to provide efficient performance and to minimize the environmental impact as well. It requires a pre-assessment of the impacts resulting from the blasting operation in design stage. One of the common procedures is to evaluate the proposed blast pattern through a series of test blasting in the field. Another approach is to evaluate the possible environmental effects using the numerical methods. There are a number of input parameters to be prepared for the numerical analysis. Some of them are well understood, while some are not. This paper presents some results of sensitivity analysis of the basic input parameters in numerical modelling of blasting problems so as to provide sound understanding of the parameters and some guidelines for input preparation.

Factor Analysis and LISREL Model Development for Landscape Estimation on The Road Cutting Slope Area (도로절토사면(절개면)의 경관평가를 위한 요인분석 및 LISREL 모형구축)

  • 지길용;박일동;임성빈;금기정
    • Journal of Korean Society of Transportation
    • /
    • v.21 no.2
    • /
    • pp.33-43
    • /
    • 2003
  • In South Korea, about 74% of total area is mountainous terrain It is therefore inevitable to make tunnel or cutting slope for road construction. According to a related survey, approximately 2,400 sites of cutting slopes were found from 24 different routes of roadway which is overall 900 km long, implying 2.7 slopes per 1km of roadway on average. Even though safety matter such as the slope failure prevention would be the most important consideration for the construction of cutting slopeslandscape of sloped face is nowadays becoming another important factor due to the growing demand for the driver-friendly road environment Various construction methods which attain this goal should therefore be considered in the design stage of the roadway. The objective of this study is to identify important factors in landscape of sloped-cut roadway using factor analysis. For this, 10 main treatment methods of sloped-cut fact were analyzed. This study employed the LISREL(structural analysis of common variance) model in order to capture the qualitative characteristics of the slope-cut road and examine the relationship between the suey error and the variable(s). As a result, more reasonable landscape evaluation model for the road design and construction was proposed.

A study on asymmetric load on circular shaft due to engineering characteristics of discontinuous rock masses (불연속암반의 공학적 특성에 따른 원형수직구 편하중에 관한 연구)

  • Shin, Young-Wan;Moon, Kyoung-Sun;Joo, Kyoung-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.2
    • /
    • pp.119-128
    • /
    • 2008
  • In the case of a circular shaft, it is expected that asymmetric loads should apply on the surface rather than symmetric loads due to geographical factors and the non-homogeneity of the jointed rock masses. In this study, discontinuous numerical analysis was carried in order to analyze the characteristics of asymmetric load distribution on the wall of the circular shaft due to anisotropy caused by heterogeneity of rock masses affected by the discontinuities like as a Joint. And it was also analyzed that the effect of the mechanical properties varied with the rock mass rating and horizontal stress with depth had influence in the asymmetric load on the wall of the shaft. In the case of considering the effect of the joint as variable, asymmetric load ratio $(R_p)$, which was defined as the ratio of the load subtracted minimum from maximum to minimum, was below 25% in the hard rock. As regarding the variation of the rock mass rating with depth as variable, the value of $R_p$ was below than 25% in the hard rock, and the value between 30% and 40% in the soft rock. On the other hand, the $R_p$ of fractures rock was between $45{\sim}50%$ which value was much higher than that in better rock mass rating.

  • PDF

Application of Discrete Event Simulation on Tunnel Muck Hauling Operations (터널 버력처리 공정의 시뮬레이션 적용성에 관한 연구)

  • Kim, Kyoung-Min;Seo, Hyeong-Beom;Hwang, Ho-Jung;Kim, Kyong-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.141-149
    • /
    • 2007
  • Simulation has considerable potential as the tool of construction management, but in the case of domestic, it is at an early stage applying simulation to micro-process assesment. For applying simulation to the construction process, much effort is needed to collect input data and to build the model including the characteristics of site. This study introduces the methodology to collect operation data of construction equipment and build the simulation model, then verifies the model with the operation data. In addition, this study identifies main factors to determine the cycle time of the muck hauling system so that it suggests the method of construction process planning through operation and combination of construction equipments.

Mechanical Properties of Rocks in Dokdo (독도 암석의 역학적 특성에 관한 연구)

  • Park, Chan;Jung, Yong-Bok;Song, Won-Kyong;SunWoo, Choon;Kim, Bok-Chul;Cheon, Dae-Sung
    • Tunnel and Underground Space
    • /
    • v.18 no.1
    • /
    • pp.69-79
    • /
    • 2008
  • Dokdo is a volcano edifice originating from an oceanic island that was formed around 3 million to 2.2 million years ago, and it consists of Dongdo(eastern island) and Seodo(western island). Even though Dokdo is a small volcanic island, Dokdo has infinite potential value and significant economic, social, scientific, and technical aspects due to its resources, ecological and territorial value. In addition, it is of national interest with regards to the dispute with Japan over the dominium of Dokdo. A need to evaluate the ground stability of Dokdo, especially in Dongdo, has been seriously raised recently due to the various cracks caused by the progressive weathering and corrosion. This study dealt with the geology and geological layers of Dokdo and identified the status of ground cracks as the previous research to evaluate the ground stability of zones of concern in Dongdo. Also, this study analyzed the relationships between physical and mechanical properties with rock types. The results showed that the values of rock properties in Dokdo are lower contrary to the general rocks in Korea, and tuff was especially affected by the weathering and corrosion.

Case Study on the Causes for the Failure of Large Scale Rock Mass Slope Composed of Metasedimentary Rocks (변성퇴적암류로 구성된 대규모 암반사면의 붕괴원인 분석에 관한 사례 연구)

  • Park, Boo-Seong;Jo, Hyun;Cha, Seung-Hun;Lee, Ki-Hwan
    • Tunnel and Underground Space
    • /
    • v.16 no.6 s.65
    • /
    • pp.506-525
    • /
    • 2006
  • For the design of large scale rock slope which has complex formations and geological structures, generally, insufficiency of geotechnical investigations and laboratory tests are the main factors of slope failures doling construction. In such case, remedial measures to stabilize slope should be selected and applied through reliable investigations and analysis considering the geotechnical characteristics. The rock slope of this study, one of the largest cut slopes in Korea with a length of 520.0 m and maximum height of 122.0 m consists of metasedimentary rocks. And a case study on the causes of large-scale rock slope failure was carried out by analysis of landslides history and site investigations during construction. When the slope with the original design slope of 0.7: 1.0 (H:V) was partially constructed, the slope failure was occurred due to the factors such as poor conditions of rocks (weathered zone, coaly shale and fault shear zone), various discontinuities (joints, foliations and faults), severe rain storm and so on. The types of failures were rockfall, circular failure, wedge failure and the combination of these types. So, the design of slope was changed three times to ensure long-term slope stability. This paper is intended to be a useful reference for analyzing and estimating the stability of rock slopes whose site conditions are similar to those of this study site such as geological structures and geotechnical properties.