• Title/Summary/Keyword: 터널 유지관리계측

Search Result 46, Processing Time 0.025 seconds

고속철도용 터널의 상시계측 시스템 구축에 관하여

  • 이준석;최일윤;문도영;이희현
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.3 no.2
    • /
    • pp.63-67
    • /
    • 2001
  • 최근 구조물의 안전과 관련하여 계측기술에 대한 관심이 고조되고 있으며, 시공중 계측 뿐 아니라 시공후 유지관리를 위한 구조물의 계측 사례가 증대되고 있다. 본 고에서는 영구계측을 위하여 고속철도용 터널에 적용된 유지관리 계측시스템을 소개함으로써 추후 터널의 유지관리 계측시스템을 구축하는데에 기초적인 자료를 제시하고자한다.

  • PDF

A study on the establishment of pressure limit values of management monitoring in tunnel (터널 유지관리계측의 압력 관리기준치 설정에 관한 연구)

  • Woo, Jong-Tae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.53-60
    • /
    • 2016
  • This study analyzed a monitoring data, based on the initial limit values of monitoring in subway, of earth pressure and pore water pressure. The data is obtained from 8 sections of the Seoul metropolitan subway line No 6, 7 and 9 in about 5 years. Also, a research is performed to set up the limit values of management monitoring, which will be applied to management monitoring in tunnel, through comparing the limit values of overseas management monitoring data and that of domestic management monitoring data. And the result obtained from comparison show that the safety phase is 60% of allowable pressure, the attention phase is 80% of allowable pressure and the precision analysis phase is 100% of allowable pressure. Also, we presented a method of management monitoring by the absolute value which can be easily applied easily in practical affairs.

Establishment of Maintenance and Monitoring Standards for Shield and TBM Tunnels (Shield 및 TBM 터널의 유지관리계측 관리기준 설정에 관한 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.1
    • /
    • pp.1-12
    • /
    • 2024
  • Purpose: The objective of this study was to improve the tunnel maintenance and monitoring technology by establishing the maintenance, management, and monitoring standards for shield and TBM tunnels, which had been applied more in recent years. Method: This study comprehensively analyzed and compared the data and model simulations of Seoul Subway Lines 7 and 9 and Bundang Line, shield and TBM tunnels in South Korea, tunnels in France and Japan, and Channel Tunnel in the UK. Result: This study set maintenance and monitoring standards when there was no design estimate based on numerical analyses such as section design and section analysis regarding the maintenance and monitoring section of shield and TBM tunnels. Conclusion: It is necessary to determine safety by comprehensively considering not only each monitoring item but also the changing trend and correlation of all items and compensation of the tunnel.

A study on the establishment of stress limit values of management monitoring in tunnel (터널 유지관리계측의 응력 관리기준치 설정에 관한 연구)

  • Woo, Jong-Tae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.1
    • /
    • pp.25-32
    • /
    • 2015
  • This study analyzed a monitoring data, based on the initial limit values of monitoring in subway, of concrete lining stress and reinforcement stress. The data is obtained from 7 sections of the Seoul metropolitan subway line No 6, 7, and 9 in about 5 years. Also, a research is performed to set up the limit values of management monitoring, which will be applied to management monitoring in tunnel, through comparing the limit values of overseas management monitoring data and that of domestic management monitoring data. And the result obtained from comparison shows that the safety phase is 60% of allowable stress, the attention phase is 80% of allowable stress and the precision analysis phase is 100% of allowable stress. Also, we presented a method of management monitoring by the absolute value which can be easily applied in practical affairs.

A study on establishment of measurement and analysis frequency of maintenance monitoring in tunnel (터널 유지관리계측의 측정 및 분석주기 설정 연구)

  • Woo, Jong-Tae;Lee, Kang-Il
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.2
    • /
    • pp.117-129
    • /
    • 2012
  • In this study, research was performed to establish the measurement and frequency of analysis for maintenance monitoring by investigation of tunnel maintenance monitoring system in the tunnel which was installed in the Seoul metro line 5, 7 and 8, using that the domestic and foreign application case, results of analyzed maintenance monitoring in the domestic tunnel and legal safety management standard of the facility. The results of the monitoring management about analysis frequency to the present are considered that the problem about measuring frequency does not occur. According to the analysis results of the maintenance monitoring which are located on the 5, 6th subway line, they are analyzed that the stress of concrete lining and reinforced bar are converged gradually after 45 months. Therefore Monitoring of measurement and analysis frequency is conduct more often within about 4 years after the measuring instrument installation. Four years later, slowing the frequency of measurement is considered reasonable.

A Study on the Improvement Plans of Maintenance Monitoring in Tunnel Structure (터널구조물 유지관리계측의 개선방안 연구)

  • Woo, Jong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.1
    • /
    • pp.10-20
    • /
    • 2020
  • Purpose: Analyze the results of on-site inspection of the tunnel structure maintenance management monitoring and suggest improvement plans. Method: We investigate and analyze the problems of various items on maintenance monitoring of tunnel structure of 14 subway lines of Seoul subway in downtown area. Result: The maintenance monitoring items, measurement quantity and installation location are classified into open tunnel and excavation tunnel and improvement plans are suggested respectively. Various durability criteria of the measuring instruments were examined, and durability confirmation method suggested improvement measures such as approval, inspection, inspection and testing, calibration of monitoring sensors. Conclusion: Applying the improvement measures of the tunnel structure maintenance monitoring to the construction site will increase the efficiency of the maintenance monitoring and contribute to the development of construction monitoring technology.

Stress Analysis of Tunnel Concrete Lining for Maintenance Monitoring (유지관리 계측에 의한 터널 콘크리트 라이닝의 응력 분석)

  • Woo, Jong-Tae;Lee, Song
    • Journal of the Korea Concrete Institute
    • /
    • v.14 no.3
    • /
    • pp.341-348
    • /
    • 2002
  • The purpose of maintenance monitoring is to offer the objective and continuous data in order to be lasting security affirmation and best fitted maintenance of tunnel structure. Though recently the examples of maintenance monitoring which Is applied to tunnel are rapidly increasing, long-term measured monitoring actual results and rationally analysis method researches are wholly lacking. In this study, it is analyzed that the relationship of stress and reinforcement stress of concrete lining, i.e., last support materials of tunnel through regression analysis based on the monitoring result of the subway tunnel, which was accomplished the monitoring for long period, passing the weathering. Also, through the analysis of the stress and the safety of concrete lining, it is estimated that the frequency of maintenance monitoring and the in-situ application of the criteria value of management.

Development of wireless module for automated tunnel measurement system using Zigbee (Zigbee 기술을 활용한 터널 계측 자동화 모듈 개발)

  • Kim, Jung-Yeol;Yoo, Hyun-Suk;Cho, Moon-Young
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2007.05a
    • /
    • pp.549-553
    • /
    • 2007
  • 국가적으로 전체 터널의 수는 대폭 증가하는 추세이며, 시공 및 유지관리 단계에서 체계적이고 장기적인 계측을 통한 관리가 필수적이다. 그러나 제한적인 계측만을 수행하고 있으며, 계측된 데이터가 체계적으로 관리되지 않아 유지관리 등 시공 이후의 단계에서 기초 정보로 활용하지 못하고 있는 실정이다. 이러한 상태의 주요한 원인 중 한 가지는 기존의 유선 계측기가 터널현장의 복잡하고, 다양한 장비들이 운용되는 상황에서 설치 및 유지관리에 어려움이 있기 때문이다. 또한 고가의 로거의 필요성은 경제성 면에서도 장애가 된다. 따라서 터널의 효율적인 계측 및 관리를 위해서는 경제성이 확보된 무선의 효율적인 계측기의 개발이 선결되어야 하며, 본 연구에서는 지그비(Zigbee) 기술을 활용하여 기존 터널 계측기의 70% 이상을 차지하는 진동현 계측기를 무선화 할 수 있는 모듈의 프로토타입을 개발하였다. 본 고에서는 이와 관련된 다음의 내용을 기술하고자 한다. - 지그비 기술을 활용한 진동현 계측기 무선화 모듈 프로토타입 개발 내용 - 현장 실험 방법 및 결과

  • PDF

Analysis of Normal Operation Rate of Monitoring Sensor for Maintenance of Geumjeong Tunnel (금정터널 유지관리 계측센서의 정상 작동율 분석)

  • Woo, Jong-Tae
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2022.10a
    • /
    • pp.352-354
    • /
    • 2022
  • 2020년 기준 금정터널 유지관리 계측센서의 정상 작동 실효성 검증 조사결과 정상작동 유효율은 14-2공구 6개 단면의 계측센서 41개중 7.3%, 14-3공구 10개 단면의 계측센서 83개중 24.1%로 편차가 큰 것으로 나타났으며, 전체 16개 단면의 계측센서 124개중 18.5%로 나타났다.

  • PDF

A study on estimation of the total loss and damage ratio of maintenance monitoring sensor of subway tunnel (지하철 터널 유지관리 계측센서의 총 손망실율 산정 연구)

  • Woo, Jong-Tae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.1
    • /
    • pp.25-31
    • /
    • 2013
  • In this study, the total loss and damage ratio of maintenance monitoring which is installed and operated in the domestic and foreign tunnel structure is researched and analyzed for estimating the loss and damage ratio of maintenance monitoring sensor of subway tunnel. The total loss and damage ratio at the elapsed time of 5-6 years after installation is 14.2% in the Seoul metro line no.5,6 and 7, 14.8% in the section 1 of the Seoul metro line no.9, 13.9% in the Channel tunnel of England and all of them are close to 15%. Therefore, it is reasonable to reflect that the total loss and damage ratio of maintenance monitoring sensor of subway tunnel is estimated provisionally 15% on design, and hence the study of the loss and damage ratio with the number of elapsed years in long-term by the measurement category will be needed.