• Title/Summary/Keyword: 터널 막장

Search Result 242, Processing Time 0.031 seconds

A Pilot Study of Stiffness Mesurements for Tunnel-Face Materials Using In-hole Seismic Method (인홀 시험을 이용한 터널 막장의 암반강성 측정에 대한 적용성 연구)

  • Mok, Young-Jin;Kim, Young-Su
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.445-456
    • /
    • 2005
  • The research concentrates on improving the in-hole seismic probe, which has been developed in past five years, to be used in stiffness measurements of tunnel-face materials. The probe was down-sized to be fit in 45-mm diameter holes(or BX) drilled by a jumbo-drill, which is used to drill holes to install explosives for tunneling. Also trigger system was improved by using a down-speeding motor for operating convenience and air packing system was replaced with a set of plate-springs to eliminate supply of compressed air. These modifications are to adjust the probe for the unfavourable environment inside of tunnels and to test without any further drilling cost. The probe and testing procedure were successfully adopted with horizontal holes drilled by a jumbo-drill at a tunnel-face to evaluate the stiffness of rock mass. The measured shear wave velocities can be used to estimate deformation properties of rock mass for tunnel analyses.

  • PDF

Effect of Tunnel Advance Rate on the Seepage Forces Acting on the Tunnel Face (터널굴진율이 막장에서의 침투력에 미치는 영향에 관한 연구)

  • 남석우;이인모
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.327-333
    • /
    • 2002
  • In this study, the effect of tunnel advance rate on the seepage forces acting on the tunnel face was studied. The finite element program to analyze the groundwater flow around a tunnel with the consideration of tunnel advance rate was developed. Using the program, the parametric study for the effect of the tunnel advance rate and hydraulic characteristics of the ground on the seepage forces acting on the tunnel face was studied. From this study, it was concluded that the tunnel advance rate must be taken into consideration as an additional parameter to assess the seepage forces at the tunnel face and a rational design methodology for the assessment of support pressures required for maintaining the stability of the tunnel face was suggested for underwater tunnels.

  • PDF

The Study On The Pre-displacement Before Face Of The Shallow Tunnel In The Weathered Soil (풍화토구간을 통과하는 천층터널의 막장선행변위에 대한 연구)

  • Kang, Suk-Ki;Yoon, Ju-Sang
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.947-954
    • /
    • 2008
  • Nowadays many urban subways are frequently constructed under the building and the river by the use of tunneling method. Especially, the majority of the tunnel are constructed even with shallow depth under the ground in the weathered soil. Since the tunnel are generally designed on the basis of the geographic soil investigation, the stability of the tunnel should be checked with the realistic data instrumented during construction. The displacement of the tunnel occurs in front of the end face during the excavation of the tunnel, which is called as pre-displacement. The total displacement can be figured from the exact pre-displacement, which is very difficult to measure without using any device installed in front of the tunnel end face. In this study, the pre-displacement measured from horizontal inclinometer was analyzed to know the co-relation with the total displacement and also, the trend and the characteristics of the tunnel deformation during construction was suggested through the regression analysis of the measured data.

  • PDF

Application of Back Analysis for Tunnel Design by Modified In Situ Rock Model (현장암반 모델을 적용한 터널의 역해석)

  • Kim, Hak-Mun;Lee, Bong-Yeol;Hwang, Ui-Seok;Kim, Tae-Hun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.2 no.3
    • /
    • pp.25-36
    • /
    • 2000
  • The purpose of this research work is to propose an analytical method of tunnel design based on reasonable site data. Therefore the proposed design method consists of monitoring data and Modified In Situ Rock Model. Also the Rock Mass Rating for very poor quality rock is very difficult to estimate, the balances between the ratings may no longer gives a reliable basis for the rock mass strength. But in reality Rock Mass Rating is only the property which can be obtained from face mapping records of the exposed tunnel face during construction stage. Evaluation of rock parameters for the actual design prior to tunnel construction should be corrected during tunnelling process in particularly complex ground conditions. This study intends to investigate application of in-situ rock model to soft rock tunnelling (weathered rock) by face mapping results and site measurement data that are obtained at the costraction site of Seoul Subway Tunnel. For the preparation of more reliable ground parameters, the Rock Mass Rating values for the weathered rocks were modified and readjusted in accordance with the measurement data. The modified input parameters obtained by the proposed method are used for the prediction of the tunnel behavior at subsequent construction stages. The results of this study revealed that more reasonable feed back tunnel analysis can be possible as suggested. Ample measurement data would be able to confirm the new proposed technique in this research work.

  • PDF

Pre-grouting for CHI of EPB shield TBM in difficult grounds: a case study of Daegok-Sosa railway tunnel (복합지반 EPB TBM 커터교체를 위한 그라우팅 수행 사례)

  • Kang, Sung-Wook;Chang, Jaehoon;Lee, Jae-Won;Kim, Dae-Young;Shin, Young-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.5
    • /
    • pp.281-302
    • /
    • 2021
  • Railway projects have been consistently increasing in Korea. In relation to this trend, the mechanized tunneling using Tunnel Boring Machine (TBM) is preferably applied for mining urban areas and passing under rivers. The TBM tunneling under difficult grounds like mixed faces with high water pressure could require ground improvements for stable TBM advance or safe cutter head intervention (CHI). In this study, pre-grouting works for CHI in Daegok-Sosa railway project are presented in terms of the grouting zone design, the executions and the results, the lessons learned from the experience. It should be mentioned that the grouting from inside TBM was carried out several times and turned out to be inefficient in the project. Therefore, grouting experiences from the surface are highlighted in this study. Jet grouting was implemented on CHI points on land, while permeation grouting off shore in the Han River, which mostly allow to access the cutter head of TBM in free air with stable faces. The results of CHI works have been analyzed and the lesson learned are suggested.

Calculation of Key Blocks' Safety Ratio based on Discontinuity Analysis (불연속면 분석에 근거한 쐐기블록 안전율 계산)

  • Kim, Eunsung;Noh, Sanghun;Lee, Sang-Soon
    • Journal of the Korean Geotechnical Society
    • /
    • v.40 no.3
    • /
    • pp.101-108
    • /
    • 2024
  • A system with the ability to recognize potential key blocks during tunnel construction by analyzing the rock face was developed in this study. This system predicts the formation of key blocks in advance and evaluates their safety factors. A laser scanner was used to collect a three-dimensional point cloud of the rock face, which was then utilized to model the excavation surface and derive the joint surfaces. Because joint surfaces have specific strikes and dip angles, the key blocks formed by these surfaces are deduced through iterative calculations, and the safety factor of each key block can be calculated accordingly. The model experiments confirmed the accuracy of the system's output in terms of the joint surface characteristics. By inputting the joint surface information, the calculated safety factors were compared with those from the existing commercial software, demonstrating stable calculation results within a 1% error margin.

A Prediction Method for Ground Surface Settlement During Shield Tunneling in Cohesive Soils (점성토 지반에서의 실드 터널 시공에 따른 지표침하 예측 기법)

  • Yoo, Chung-Sik;Lee, Ho
    • Geotechnical Engineering
    • /
    • v.13 no.6
    • /
    • pp.107-122
    • /
    • 1997
  • This paper presents a ground surface settlement prediction method for shield tunneling in cohesive soils. In order to develop the method, a parametric study on shield tunneling was performed by using a threetimensional elasto-plastic finite element analysis, which can simulate the construction procedure. By using the results of the finite element analysis, the ground movement mechanism was investigated and a base which relates the ground surface settlement and iuluencing factors was formed. The data base was then used to formulate semi -empirical equations for both surface settlement ratio above tunnel face and imflection point by means of a regression analysis. Furthermore, a prediction method for transverse and longitudinal surface settlement profiles was suggested by using the leveloped equations in conjunction with the normal probability curve. Effectiveness of the developed method was illustrated by comparing settlement profiles obtained by using the developed method with the results of finite element analysis and measured data. Based on the comparison, it was concluded that the developed method can be effectively rosed for practical applications at least within the conditions investigated.

  • PDF

Case Study for the Improvement of Tunnel Advance Rate & the Time Reduction of Working Process in Long Hole Blasting About Tunnel Excavation (터널 장공발파에서 굴진율 개선 및 작업공정 시간 단축 사례)

  • Kim, Hee-Do;Lee, Jun-Won;Lee, Ha-Young
    • Explosives and Blasting
    • /
    • v.31 no.2
    • /
    • pp.32-39
    • /
    • 2013
  • Generally, The way of long hole blasting is carried out in coal-face, basic excavation for dam, mine etc. Recently, this long hole blasting has been implemented in civil engineering for efficiency & economic feasibility. National express no.600 of Pusan outer high-express ${\bigcirc}$ construction site with four lanes of the length of 8km was also a site applied by long hole blasting. But After blasting, tunnel advance rate is less than 75%. As a result of that, Follow-up working time is influenced. Thereby, The total of working process is significantly so increased that planned excavation cannot be implemented many times. For not only improve excavation rate but reduce working process time in job site, we introduce blasting case which apply the ${\phi}36mm$ explosive suited for high desity of charging among long hole blasting in order to overcome mentioned problem.

Case study of volume loss estimation during slurry tbm tunnelling in weathered zone of granite rock (화강풍화대를 통과하는 슬러리 TBM의 체적손실 산정에 대한 사례 연구)

  • Park, Hyunku;Oh, Ju-Young;Chang, Seokbue;Lee, Seungbok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.61-74
    • /
    • 2016
  • This paper presents a case study on the ground settlement and volume loss estimation for slurry pressure balanced shield TBM tunnelling in weathered zone of granite rock. Settlement at each stage of shield tunnelling was analyzed and the volume losses and settlement trough factors were estimated from observations. In addition, using the existing volume loss evaluation method in literature, volume losses were estimated considering ground properties and actual driving parameters. Most of ground settlement occurred during passage of shield skin passage and after backfill grouting, and the measured total volume loss and trough curves appeared to coincide with literature. Shield and tail loss obtained from field measurement were found to be around 90% and 60% of the predictions, where tail loss indicated larger deviation than shield loss.

Study on Shearing Properties and Behavior of the Grout-reinforced Underground with ERP Pipes (FRP 그라우팅 보강지반의 전단특성에 관한 연구)

  • 최용기;박종호;권오엽;이상덕
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.5
    • /
    • pp.73-81
    • /
    • 2002
  • Nowadays , the grouted-reinforcing method, which is called FRP(Fiberglass-reinforced-plastic) pipe .reinforcing method, has been introduced in the community of pound reinforcements. The resistance to corrosion and chemical attack high strength to weight ratio, and ease of handling make these pipes a better alternative to steels in tunnel. However, to fully utilize FRP pipes as grouted reinforcing members at the face and the crown in tunnel, their mechanical properties and behaviors and the grout-reinforced underground have to be verified. Laboratory shear tests were conducted to evaluate the mechanical properties for FRP pipes, the grout-reinforced members and the grout-reinforced body of FRP pipes. According to the test results, it was observed that FRP pipes play a dominant role in shearing behavior of the grout-reinforced members and that their shearing resistance exerts after the shearing displacement increases to some extent.