A New NDT Technique on Tunnel Concrete Lining (터널 콘크리트 라이닝의 새로운 비파괴 검사기법)

  • 이인모;전일수;조계춘;이주공
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.249-256
    • /
    • 2003
  • To investigate the safety and stability of the concrete lining, numerous studies have been conducted over the years and several methods have been developed. Most signal processing method of NDT techniques has based on the Fourier analysis. However, the application of Fourier analysis to analyze recorded signal shows results only in frequency domain, it is not enough to analyze transient waves precisely. In this study, a new NDT technique .using the wavelet theory was employed for the analysis of non-stationary wave propagation induced by mechanical impact in the concrete lining. The wavelet transform of transient signals provides a method for mapping the frequency spectrum as a function of time. To verify the availability of wavelet transform as a time- frequency analysis tool, model experiments have been conducted on the concrete lining model. From this study, it was found that the contour map by Wavelet transform provides more distinct results than the power spectrum by Fourier transform and it was concluded that Wavelet transform was an effective tool for the experimental analysis of dispersive waves in concrete structures.

  • PDF

Evaluation of Physical Properties for 53-Years Old Railway Tunnel Linning Concrete (53년 경과된 철도터널 라이닝 콘크리트의 물성 평가)

  • 이상민;이태규;김동석;이웅종;김종우
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1995.04a
    • /
    • pp.360-365
    • /
    • 1995
  • The purpose of this study is to identify the various characteristics of the 53-years old railway tunnel linning concrete. The nondestructive technique such as the surface hardness method and the ultrasonic method, the extent of carbonation by the phenolphthalein indicator, and the chemical analysis due to XRD/XRF are considered Also the concrete core was cut in two pieces per tunnel for the exact evaluation of strength. On the basis of the experimental result, it is concluded that the durability and the serviceability of old tunnel linning concrete are affected by the initial mixing condition and the environmental effect.

  • PDF

Estimation of Shape of Voids behind Concrete Tunnel Linings using Microwave Polarization Radar (다중 편파모드 방식 레이더에 의한 콘크리트 터널 라이닝 배면공동의 형상추정)

  • Park, Seok-Kyun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.05a
    • /
    • pp.408-411
    • /
    • 2004
  • The presence of voids behind tunnel linings results in their deterioration. One proposed method of effectively detecting such voids by non-destructive means is radar. This research is devoted to quantitatively evaluating the efficiency of such non-destructive tests with radar. As a foundation to this ongoing research, which aims to acquire directional information and estimate the shape of specific voids using radar of three-dipole antenna type, an investigation of microwave polarization methods is carried out with various void orientations and void geometries. As the results, it is clarified that the response of microwave polarization modes depends on void geometry and thus there is a possibility of identifying the geometry and orientation of specific voids using radar of three-dipole antenna type.

  • PDF

An application of damage detection technique to the railway tunnel lining (철도터널 라이닝에 대한 손상도 파악기법의 현장적용)

  • Bang Choon-seok;Lee Jun S.;Choi Il-Yoon;Lee Hee-Up;Kim Yun Tae
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1142-1147
    • /
    • 2004
  • In this study, two damage detection techniques are applied to the railway tunnel liner based on the static deformation data. Models based on uniform reduction of stiffness and smeared crack concept are both employed, and the efficiency and relative advantage are compared with each other. Numerical analyses are performed on the idealized tunnel structure and the effect of white noise, common in most measurement data, is also investigated to better understand the suitability of the proposed models. As a result, model 1 based on uniform stiffness reduction method is shown to be relatively insensitive to the noise, while model 2 with the smeared crack concept is proven to be easily applied to the field situation since the effect of stiffness reduction is rather small. Finally, real deformation data of a rail tunnel in which health monitoring system is in operation are introduced to find the possible damage and it is shown that the prediction shows quite satisfactory result.

  • PDF

Performance Estimation of Tunnel Lining Concrete Reinforced Steel Fiber (강섬유 보강 터널 라이닝 콘크리트의 성능 평가)

  • Jeon, Chan-Ki;Kim, Su-Man;Lee, Myung-Soo;Lee, Jong-Eun;Jeon, Joong-Kyu
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.11a
    • /
    • pp.579-582
    • /
    • 2005
  • Tunnel lining is the final support of a tunnel and reflects the results of the interaction between ground and support system. Recently it is very difficult to support and manage the tunnel because the cracks on tunnel lining cause problems in supporting and managing tunnels. Therefore the analysis of the cracks is quite strongly required. The major role played by the steel fiber occurs in the post-cracking zone, in which the fibers bridge across the cracked matrix. Because of its improved ability to bridging cracks, steel fiber reinforcement concrete(SFRC) has better crack properties than that of reinforced concrete. In this study, mechanical behaviour of a tunnel lining was examined by model tests. The model tests were carried out under various conditions taking different loading shapes, thicknesses and leakage of lining, and volume content of steel fiber. From these model test, the cracking load, the failure load, defection and cracking position and type were examined and the characteristics of deformation and failure for tunnel lining were estimated and researched.

  • PDF

The Application of Hydration Heat to Form Removal of Lining Concrete in Tunnel (수화열을 고려한 터널 라이닝 콘크리트 거푸집 탈형)

  • Lee, Jong-Kil;Jung, Hyung-Mok;Kim, Kook-Han;Namgoong, Yeong-Hwan;Park, Chan-Kyu
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.11a
    • /
    • pp.347-350
    • /
    • 2005
  • The strength level for removal of lining concrete in tunnel is increased from 2.94MPa to 4.9MPa in 2004. This result in the increase of concrete curing time, and construction time would be delayed. In this study, in order to improve the efficiency of construction cycle and satisfy the strength criterion, a curing method is adopted, which is considering the hydration heat in the lining concrete member. As a result, it is shown that the concrete curing time for form removal is about 20hrs without the adjustment of concrete mix design. And construction cycle time is not changed compared to that before the change of strength criterion.

  • PDF

Performance of Shotcrete Lining due to Tunneling and Groundwater Interaction Using a 3D Stress-pore Pressure Coupled Analysis (응력-간극수압 3차원 연계해석을 이용한 터널시공과 지하수의 상호작용으로 인한 라이닝 거동특성 연구)

  • Yoo, Chung-Sik;Kim, Sun-Bin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.465-474
    • /
    • 2005
  • This paper presents the interaction effect between tunneling and groundwater on tunnel behavior. A parametric study is then conducted on the various tunneling situations frequently encountered in Seoul area using a 3D stress-pore pressure coupled finite-element model with emphasis on the effects of ground and lining permeabilities. It is shown that the ground and lining responses are significantly influenced by the relative permeability between the ground and the lining, and that the circumferential pre-grouting is effective in minimizing the tunnelling and groundwater interaction.

  • PDF

Assessment of lining load for drainage type cable tunnel considered water-passing capacity of tunnel filter material (부직포 통수능을 고려한 배수형 전력구터널의 라이닝 하중산정)

  • Kim, Dae-Hong;Kim, Kyoung-Yul;Lee, Dae-Soo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1369-1376
    • /
    • 2005
  • In case of the drainage type tunnel, the residual water pressure is likely to act on the tunnel lining due to the decrease of water-passing capacity of the filter material. Therefore, this study discussions a method to predict the lining load with the consideration of water passing capacity of the filter material through the literature review and numerical analysis. It is expected from the results of case studies that the design load acting on the concrete lining in the drainage type tunnel could be assumed to be about 50% of the hydrostatic water pressure in steady-state ground-water condition.

  • PDF

Case Study of Carbonation on Lining Concrete in Vehicular Tunnel as Ventilation System (도로터널의 환기방식에 따른 라이닝 콘크리트의 중성화 사례 연구)

  • Choo, Jin-Ho;Maeng, Doo-Young;Hwang, In-Baek;Noh, Eun-Chul
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.417-422
    • /
    • 2005
  • The appropriate ventilation system in vehicular tunnel should be the most economical solution with regard to both construction and maintenance. The damages on tunnel lining was affected by formula of ventilation system in long vehicular tunnel. In this study, carbonation, one of main experimental items in precision safety diagnosis, was analyzed by contouring damage area with ventilation system. Considerations of carbonation were also given to the design and maintenance which manage the long-term safety in tunnel.

  • PDF

An experimental study on the reduction method of earth pressure acting on the cut-and-cover tunnel lining (개착식 터널의 라이닝에 작용하는 토압경감대책에 관한 실험적 연구)

  • Kim, Sang-Yoon;Im, Jong-Chul;Park, Lee-Keun;Bautista, Ferdinand E.
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.952-957
    • /
    • 2004
  • Cut and Cover Method is generally used in shallow tunnels and tunnel entrances with thin soil cover. In this type of cons0truction, backfilling is considered to be the most important process. In this process even though the backfill material is thoroughly compacted, compaction and self-weight due to vehicular vibration and pressure exerted by the soil cause the backfill material to undergo self-compression which leads to settlement. The settlement of the backfill material subjects the tunnel lining under excessive earth pressure which cause cracking and deformation. In the model test performed installation of geotextile on the sides and top of the tunnel was able to reduce the earth pressure acting on the tunnel lining.

  • PDF