• Title/Summary/Keyword: 터널등

Search Result 1,610, Processing Time 0.025 seconds

A study on the enlargement of 2-lane road tunnel under construction (시공중인 2차로 도로터널의 확장 방안에 대한 연구)

  • Choi, Hae-Jun;Kim, Dae-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.1
    • /
    • pp.33-50
    • /
    • 2011
  • Recently interest in enlargement of existing tunnel located in downtown or mountain area have been considerably increased along with requirements and discussion on the road-widening. Therefore, it is necessary to study the construction method and stability of tunnel to enlarge the existing tunnel in design. In this study, the design concept on the alignment, excavation method, reinforcement to enlarge the existing tunnel is described on the basis of the enlargement of 2-lane road tunnel under construction. This paper suggests a proper design method for the enlargement of an existing tunnel in useful practice.

A Study on the Design Loads of NATM Tunnel Concrete Lining (NATM 터널 콘크리트라이닝 설계하중에 관한 연구)

  • 천병식;신영완
    • Tunnel and Underground Space
    • /
    • v.11 no.2
    • /
    • pp.96-108
    • /
    • 2001
  • A concrete lining of NATM tunnel is the final product of a process that involves planning and evaluation of user needs, geotechnical investigations, analysis of ground-lining interaction, construction, and observations and modifications during construction. The designer must consider the lining in context of the many function, construction, and geotechnical requirements. Also, the loss of supporting capacity of shotcrete lining due to poor rock qualities and shotcrete erosion must be considered. The values, shapes, and estimating methods of rock load and water pressure are very different with every designers. Estimating methods of rock loads used in the design of NATM tunnel concrete lining are investigated. Structural analyses are done in various load combinations, and the member forces(moment, axial force and shear force) are compared. The adequate load combination of rock load and water pressure is proposed.

  • PDF

Modern High-Power TBM with Advanced Procurement System (오늘날의 고성능 TBM과 선진 장비조달 방안)

  • Jee, Warren W.
    • Tunnel and Underground Space
    • /
    • v.23 no.3
    • /
    • pp.161-168
    • /
    • 2013
  • Recently, the application of High-Power mechanized tunnelling technology has been expended around the world. Especially, High-power Modern TBM machines are used in a successful results. Essential for the great success of this modern TBM in difficult rock conditions are based on the development of machine power, suitable better cutter developments, and also developed assesment technology regards on the extensive site investigations. OPP (Owner Procurement Process) system is a proven alternative contract delivery method that is potentially applicable to many tunnel projects. Using the OPP, the owner specifies and procures the TBMs and tunnel lining in advance of the tunnel contract procurement and provides TBM to a tunnel contractor with a goals of reducing project risks and accelerating project schedule. Depending on the blasting vibrations and noises, mechanized tunnelling will be more important particularly in city areas.

Development of Tunnel-Environment Monitoring System and Its Installation III -Measurement in Solan Tunnel- (터널 환경 측정 시스템 개발 및 측정 III -솔안터널 측정결과 분석-)

  • Park, Won-Hee;Cho, Youngmin;Kwon, Tae-Soon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.5
    • /
    • pp.637-644
    • /
    • 2016
  • This paper is a follow-up to previous papers entitled, "Development of Tunnel-Environment Monitoring System and Its Installation" I [1] and II [2]. The target tunnel of these studies is the Solan Tunnel, which is a loop-type, single-track, 16.7-km-long tunnel located in mountainous terrain and passing through the Baekdudaegan mountain range. It is an ordinary railway tunnel designed for both freight and passenger trains. We analyzed the environmental conditions of the tunnel using temperature and humidity data recorded over approximately one year. The data were recorded using the Tunnel Rough Environment Measuring System (TREMS), which measures environmental data in subway and high-speed train tunnels and is installed in three locations inside the tunnel. Previous studies analyzed environmental conditions inside tunnels located in or near a city, whereas the tunnel in this study is located in a mountainous area. The tunnel conditions were compared with those measured outside the tunnel for each month. Hourly changes during summer and winter periods were also analyzed, and the environmental conditions at different locations inside the tunnel were compared. The results are widely applicable in studies on the thermal environment and air quality of tunnels, as well as for computer analysis of tunnel airflow such as tunnel ventilation and fire simulations.

Convergence Monitoring Technologies for Traffic Tunnels - State of the Art (터널의 내공변위 자동화 계측기술 분석)

  • Chung So-Keul
    • Tunnel and Underground Space
    • /
    • v.15 no.1 s.54
    • /
    • pp.1-8
    • /
    • 2005
  • Measurement of convergence was/is carried out manually throughout the world for tunnels under construction. However, manual method has certain limitations in terms of applicability for the tunnels in operation. This paper describes state of the art of convergence monitoring systems which are available for measuring displacement of existing tunnels. These technologies are analyzed as follows: 1 The Sofo system using the fiber optic sensors has been applied to the stress measurement of the tunnel lining. It has not yet been used for the monitoring of tunnel convergence because of its cost and reliability 2. A TPMS(Tunnel Profile Monitoring System) using tilt sensors and displacement sensors is used for the convergence monitoring of highway tunnels, subway tunnels and underground ducts. 3. A BCS(Bassett Convergence System) using a pair of tilt sensors can be used for the convergence monitoring of tunnels, however the accuracy of the measurement has to be improved because it uses AC input voltage during data acquisition. The system has to be validated before it can be applied to the tunnels in operation. Convergence monitoring systems using TPMS and/or BCS are recommended to be evaluated and improved by a series or tests in tunnels under construction in order to be applied to the main measuring section and the tunnels in operation.

Experimental study on the longitudinal load transfer of a shallow tunnel depending on the deformation tunnel face (II) (얕은 터널의 굴진면 변형에 따른 종방향 하중전이 특성에 대한 실험적 연구(II))

  • Kim, Yang Woon;Lee, Sang Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.5
    • /
    • pp.499-509
    • /
    • 2016
  • In recent years, the use of underground spaces becomes more frequent and the demands for urban tunnels are rapidly increasing. The urban tunnels constructed in the ground with a shallow and soft cover might be deformed in various forms on the face, which would lead, the tunnels to behavior 3-dimensionally, which may have a great impact on the longitudinal load transfer. The tunnel face might deform in various forms depending on the construction method, overburden and the heterogeneity of the ground. And accordingly, the type and size of the distribution of the load transferred to the ground adjacent to the tunnel face as well as the form of the loosened ground may appear in various ways depending on the deformation form of the tunnel face. Therefore, in this study was conducted model tests by idealizing the deformation behavior of the tunnel face, that were constant deformation, the maximum deformation on the top and the maximum deformation on the bottom. And the test results were analyzed focusing on the deformation of the face and the longitudinal load transfer at the ground above the tunnel. As results, it turned out that the size and the distribution type of the load, which was transferred to the tunnel as well as the earth pressure on the face were affected by the deformation type of the face. The largest load was transferred to the tunnel when the deformation was in a constant form. Less load was transferred when the maximum deformation on the bottom, and the least load was transferred when the maximum deformation on the top. In addition, it turned out that, if the cover became more shallow, a longitudinal load transfer in the tunnel would limited to the region close to the face; however, if the cover became higher than a certain value, the area of the load transfer would become wider.

Behavior and pillar stability of enlarged existing parallel tunnels (기존 병설터널의 확폭에 따른 터널 거동 및 필라 안정성 분석)

  • Lee, Myeong-Han;Kim, Bumjoo;Jang, Yeon-Soo;Yun, Ji-Nam;Park, Hyun-Gon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.5
    • /
    • pp.537-546
    • /
    • 2013
  • Traffic congestion in existing tunnels has increased due to increased traffic volume and enlarged vehicles. Enlarging existing tunnels has advantages over constructing new tunnels by reducing land purchasing costs as well as minimizing natural environment destruction. In fact, many overseas projects for enlarging existing tunnels have been reported. Thus, it appears that the demand on enlarging existing tunnels continues to rise in Korea in near future. Nonetheless, the studies related to the enlarged tunnels have been relatively rare since there have been few tunnel enlargement projects in Korea. In the present study, the tunnel behavior and the stability of rock pillar when enlarging existing parallel tunnels were investigated by performing FE analysis and using existing theory and empirical relationships. Four different enlarging cases, depending on the enlargement types and directions, were examined in the study. According to the results, for the tunnels with the same pillar width after enlarged, the uni-laterally enlarged tunnel indicated 5 to 20% higher crown settlement compared to the bi-laterally enlarged tunnel, and for the tunnel with the narrowest pillar, the highest shotcrete stress was observed. Also, the strength/stress ratio for rock pillar was more than 1.0 for all four enlargement cases, and the Matsuda's method was found to give higher strength/stress ratio by about 50% compared to the Peck's method.

Application of risk evaluation and safety management system in urban deep tunnelling (도심지 대심도 터널에서의 리스크 평가 및 안전관리시스템 적용)

  • Moon, Joon-Shik;Jeon, Kichan;Kim, Younggeun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.725-744
    • /
    • 2022
  • As the construction of infrastructure using the underground tunnel in urban area have been rapidly increased, various accidents and collapses of tunnel including structure have been occurred in deep urban tunnelling. The concern and worry relating to the risk and safety of the tunnel during excavation is becoming the key issues in deep urban tunnelling. In this study, it was conducted for deep urban tunnel at GTX (Great Train Express) line which was located in Seoul metropolitan area to determine the risk characteristics for tunnel according to urban tunnelling. Also, it was reviewed the risk analysis and evaluation of the tunnel, shaft and station. And after a review of risk analysis and evaluation for risk register and hazard identification by using a risk matrix method, safety management of the tunnel according to excavation was evaluated to be secured. This study is expected to be applied as useful approach in deep urban tunnelling if you need to review the risk and safety management system of tunnel according to mitigation measures in complex urban tunnelling.

도로안정성을 고려한 친환경적 터널 갱문 설계 및 시공사례

  • Wi, Yong-Gon;Kim, Do-Hyeong;Kim, Yeong-Geun;Kim, Il-Hwan;Gwon, Jae-Seok;Lee, Won-U
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2004.04a
    • /
    • pp.199-217
    • /
    • 2004
  • 터널 설계에 있어 갱구부의 위치 및 갱문형식의 선정은 터널 및 갱구사면의 안정성뿐만 아니라, 주위환경과의 조화 및 자연환경 훼손 최소화 등과 같은 환경적인 측면에서도 매우 중요한 부분이다. 현행 국내의 경우 경제성과 시공성 위주의 갱구부 위치 선정으로 과다 절취구간이 발생되어 환경훼손, 민원문제 발생, 과다한 용지 매입비용 등의 여러 가지 부작용이 발생되고 있다. 또한, 갱문 형식의 선정에 있어서 갱구부의 지형여건 및 제반 환경적 영향을 고려하지 않고 원통절개형과 면벽식 갱문의 획일적인 적용으로 주변지형과의 부조화를 이루는 사례가 다수 발생하고 있으며, 갱구부 상단의 유실된 토석이 완충공간의 부족으로 도로 노면상에 낙하되는 사고가 발생하고 있어 그에 대한 대책이 필요한 실정이다. 이와 같은 문제점을 보완하기 위해 갱구부 절취구간 최소화를 위한 구체적인 최소토피고 기준을 마련하였으며, 갱구상단 지형경사의 완급, 갱문주위의 배수기능, 낙석${\cdot}$산사태 등의 발생가능성 등을 고려한 새로운 갱문형식을 제안하고 체계적인 검토를 수행하였다. 이를 통해 점차 강화되는 환경보호정책 방향에 부응하고 자연환경 훼손을 최소화하며, 특히 해빙기와 집중호우시 낙석${\cdot}$눈사태로부터 도로의 안전을 확보할 수 있는 터널 갱문부 설계기준을 제시하였다. 또한, 실제 고속도로 터널의 설계 적용사례를 통하여 본 설계기준의 적용성을 분석하였으며, 실제 갱문 시공사례를 소개하여 향후 설계 및 시공에 도움이 되고자 하였다.

  • PDF