A Numerical Analysis to Estimate Disposal Spacing and Rock Mass Condition for High Efficiency Repository Based on Temperature Criteria of Bentonite Buffer (벤토나이트 완충재 설계 기준 온도에 따른 고효율 처분시스템 처분 간격 및 암반 조건 산정을 위한 수치해석적 연구)

  • Kim, Kwang-Il;Lee, Changsoo;Kim, Jin-Seop;Cho, Dongkeun
    • Tunnel and Underground Space
    • /
    • v.31 no.4
    • /
    • pp.289-308
    • /
    • 2021
  • This study conducts coupled thermo-hydro-mechanical numerical modeling to investigate the maximum temperature and conditions for securing mechanical stability of the high-level radioactive waste repository when temperature criteria of bentonite buffer are 100℃ and 125℃, respectively. In case of temperature criterion of buffer as 100℃, the maximum temperatures at the interface between canister and buffer are calculated to be 99.4℃ and 99.8℃, respectively for a case with disposal tunnel spacing of 40 m and deposition hole spacing of 5.5 m and for the other case with disposal tunnel spacing of 30 m and deposition hole spacing of 6.5 m. In case of temperature criterion of buffer as 125℃, spacings of disposal tunnel and deposition hole could be decreased to 30 m and 4.5 m, respectively, which reduces the disposal area up to 55% compared to the disposal area of KRS+. According to analysis of mechanical stability for various disposal spacings, RMR of rock mass for KRS+ should be larger than 72.4 which belongs to good rock in RMR classification to prevent failure of rock mass. As disposal spacing is decreased, required RMR of rock mass is increased. In order to prevent failure of rock mass for a case with disposal tunnel spacing of 30 m and deposition hole spacing of 4.5 m, RMR larger than 87.3 is needed. However, mechanical stability of the repository is secured for all cases with RMR over 75 considering the enhancement of rock strength due to confining stress induced by swelling of the bentonite buffer and backfill.

Waterproofing performance evaluation according to each waterproofing material due to segment construction error (세그먼트 시공오차에 따른 이음부 지수재별 방수성능 평가)

  • Heo, Seung-Mu;Jung, Hoon;Lee, Seok-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1023-1037
    • /
    • 2018
  • The interest in the use of shield TBM (Tunnel Boring Machine) on the tunnel excavation has been increased rapidly in Korea. The shield TBM tunnel is generally designed as non-drainage tunnel. Consequently, if water leakage through the segment joints happens, big problems on the usage and stability of tunnel can be occurred. In this study, the variation of waterproof capacity of hydrophilic rubber waterstop and gasket, respectively by the construction error and excessive displacement of segment was studied. The test results show that hydrophilic rubber waterstop has favorable on the offset, however unfavorable on the gap. On the other hand, gasket has unfavorable on the offset, however favorable on the gap.

Installation Standards of Urban Deep Road Tunnel Fire Safety Facilities (도심부 대심도 터널의 방재시설 설치 기준에 관한 연구(부산 승학터널 사례를 중심으로))

  • Lee, Soobeom;Kim, JeongHyun;Kim, Jungsik;Kim, Dohoon;Lim, Joonbum
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.6
    • /
    • pp.727-736
    • /
    • 2021
  • Road tunnel lengths are increasing. Some 1,300 tunnels with 1,102 km in length had been increased till 2019 from 2010. There are 64 tunnels over 3,000 m in length, with their total length adding up to 276.7 km. Safety facilities in the event of a tunnel fire are critical so as to prevent large-scale casualties. Standards for installing disaster prevention facilities are being proposed based on the guidelines of the Ministry of Land, Infrastructure and Transport, but they may be limited to deep underground tunnels. This study was undertaken to provide guidelines for the spacing of evacuation connection passages and the widths of evacuation connection doors. Evacuation with various spacing and widths was simulated in regards to evacuation time, which is the measure of safety, using the evacuation analysis simulation software EXODUS Ver.6.3 and the fire/smoke analysis software SMARTFIRE Ver.4.1. Evacuation connection gates with widths of 0.9 m and 1.2 m, and spacings of 150 m to 250 m, were set to every 20 m. In addition, longitudinal slopes of 6 % and 0 % were considered. It was determined to be safe when the evacuation completion time was shorter than the delay diffusion time. According to the simulation results, all occupants could complete evacuation before smoke spread regardless of the width of the evacuation connection door when the longitudinal slope was 6 % and the interval of evacuation connection passage was 150 m. When the evacuation connection passage spacing was 200 m and the evacuation connection gate width was 1.2 m, all occupants could evacuate when the longitudinal slope was 0 %. Due to difference in evacuation speed according to the longitudinal slope, the evacuation time with a 6 % slope was 114 seconds shorter (with the 190 m connection passage) than with a 0 % slope. A shorter spacing of evacuation connection passages may reduce the evacuation time, but this is difficult to implement in practice because of economic and structural limitations. If the width of the evacuation junction is 1.2 m, occupants could evacuate faster than with a 0.9 m width. When the width of a connection door is 1.2 m with appropriate connection passage spacing, it might provide a means to increase economic efficiency and resolve structural limitations while securing evacuation safety.

Effect of Spacing of Multi-Piers on Roughness (다열기둥의 배치간격이 조도에 미치는 영향)

  • Yoon, Sung-Bum;Lee, Sang-Mok;Kim, Sun-Hyung;Lim, Chae-Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.515-518
    • /
    • 2006
  • 수많은 교각들이 규칙적으로 배치되어 있는 복개하천이나 하천종단교량 등의 경우 개별적인 교각의 후면부에서 발생하는 와류로 인한 에너지 손실이 누적되어 흐름에 큰 저항요인으로 작용한다. 격자기둥의 형상과 종방향 및 횡방향 배치간격이 배수시스템의 통수능에 미치는 영향을 파악하기 위해 본 연구에서는 사각형 및 둥근장방형 격자기둥에 대한 기초적인 수리 실험을 실시하고 그 결과를 분석하였다.

  • PDF

Evaluation of Drain Capacity in Tunnel Drainage System using Drainboard (바닥배수판을 이용한 터널 배수시스템의 통수능 평가)

  • Bae, Gyu-Jin;Lee, Gyu-Phil;Lee, Sung-Won;Shin, Hyu-Soung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.1
    • /
    • pp.13-20
    • /
    • 2006
  • This study proposes a new concept of a tunnel central drainage system by using a drain board to make a breakthrough on difficulties in the installation of conventional drainage system and draw-down of its drain capacity especially in long tunnels. A fundamental study has been performed for evaluation of the drain capacity of the planar drainage system adopted in this study. In fact, the system proposed makes possible to omit the side, transverse as well as central drainage pipes required in the conventional system, even if its drain capacity and any guideline for design are not available to date. In this circumstance, it is carried out to investigate the correlation between drain capacities and, shapes and posit ions of the columns of the drain board in terms of a variety of water inflows through hydrological model tests. It is shown from the tests that a drain capacity is highly influenced by the shape and the distance between the columns of a drain board in flowing direction, and a round rectangular shape of the columns leads to the highest capacity of drainage. And also, the shorter distance between the columns in flowing direction, the higher drain capacity would be achieved.

  • PDF

Interactions between pre-existing large pipelines and a new tunnel (기존 대구경 파이프라인과 신설터널간의 상호작용)

  • Jeong, Sun-Ah;Choi, Jung-In;Hong, Eun-Soo;Chun, Youn-Chul;Lee, Seok-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.2
    • /
    • pp.175-188
    • /
    • 2009
  • When a new tunnel is excavated by the drill and blast method near pre-existing underground structures or tunnels due to the region restricted condition such as urban area, the ground will be relaxed by the excavation. In this case, issues can be created in terms of stability of pre-existing underground structures. One of major factors determining the stability of pre-existing underground structures can be a separation distance between pre-existing underground structures and a newly excavated tunnel. The region of ground relaxation defined by the plastic zone due to new excavation can be varied by separation distance. In this study, in other to estimate an influence of new tunnel excavation in terms of separation distance on the stability of pre-existing large pipelines, two-dimensional scaled model tests using plaster were performed for six models which have a different separation distance, The results show that based on the analysis of induced displacement during tunnel construction, the displacement decreases as the separation distance between large pipeline and new tunnel is increased until the distance is 2.5 times of pipeline diameter. Beyond this point, however, the displacement has become stabilized.

소단면 터널에서 에멀젼폭약의 사압현상과 대책

  • Min, Hyeong-Dong;Jeong, Min-Su;Jin, Yeon-Ho;Park, Yun-Seok
    • Proceedings of the KSEE Conference
    • /
    • 2008.10a
    • /
    • pp.17-28
    • /
    • 2008
  • 국책사업이나 SOC의 확충을 위한 도로 및 철도의 건설에서 적용되는 터널의 단면크기를 보면, $50m^2$에서부터 $100m^2$이상의 중 대단면 터널이 주를 이루고 있으나, 전력구, 통신구, 소규모로 운영되는 광산의 채광용 터널, 용수를 위한 도수로터널 등 특수한 용도로 설계, 시공되고 있는 터널에서는 $20m^2$이하의 단면크기를 갖는 경우가 있다. 이러한 소단면 터널의 경우에는 협소한 작업공간으로 인하여 적용공법 뿐만 아니라 장비의 사용 또한 제약을 받게 되어 작업효율이 저하되고 공사기간이 늘어나게 되는 등 여러 가지 문제점을 안고 있다. 특히, 에멀젼 폭약을 사용하는 발파에서 먼저 기폭된 발파공의 충격압력에 의해 인접공의 폭약이 예비압축(Precompression)되어 사압현상을 일으키고 잔류약을 발생시키는 사례가 종종 발생하고 있다. 사압현상은 당해 발파의 실패와 함께 2차적인 사고의 위험요인이 될 수 있으므로 이를 방지하기 위한 대책을 수립하여야 한다. 이를 위해 기존 문헌을 통하여 사압현상의 원인과 발생 가능성을 검토하였고, 국내에서 주로 사용되는 에멀전폭약의 수중 내충격성시험과 충격압력 전달시험을 실시하여 사압현상의 발생정도를 측정하였으며, 사압현상이 발생한 소단면 터널현장을 대상으로 대책을 수립하여 적용하였다. 심발방법을 변경하여 전단의 충격압력을 견딜 수 있는 공간격을 확보하고 뇌관의 초시간격을 적절하게 배치한 발파패턴을 적용한결과, 사압현상을 억제하고 잔류약의 발생을 감소시켜 계획 굴진장을 확보하고 파쇄석의 크기를 감소시키는 등 양호한 결과를 얻을 수 있었다.

  • PDF

Optimization of tunnel support patterns using DEA (차분진화 알고리즘을 적용한 터널 지보패턴 최적화)

  • Kang, Kyung-Nam;An, Joon-Sang;Kim, Byung-Chan;Song, Ki-Il
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.1
    • /
    • pp.211-224
    • /
    • 2018
  • It is important to design tunnel support system considering the various loads acting on the tunnel because they have a direct impact on the stability of tunnels. In Korea, standardized support patterns are defined based on the rock mass classification system depending on the project, and it is stated that it should be modified appropriately considering the behavior of tunnel during construction. In this study, the tunnel support pattern optimization method is suggested based on the convergence-confinement method, earth pressure, axial force of rock bolt, and moment acting on the shotcrete. The length and spacing of the rock bolts and the thickness of the shotcrete were optimized by using the differential evolution algorithm (DEA) and the results were compared to the standard support pattern III for railway tunnel. Rock bolt length can be reduced and the installation interval can be widened for shallow tunnel. As the depth of tunnel increases, the thickness of shotcrete increases linearly. Therefore, the thickness of shotcrete should be thicker than the standard support pattern as the depth of tunnel increases to secure the stability of tunnel.

Retraction: A numerical study on the fire smoke behavior by operating the fire prevention system in tunnel-type structure (논문 취소: 터널형 구조물의 방재시설 가동에 따른 화재연기 거동에 관한 수치 해석적 연구)

  • Lee, Ho-Hyung;Choi, Pan-Gyu;Lee, Sang-Don;Heo, Won-Ho;Jo, Jong-Bok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.189-199
    • /
    • 2019
  • In this study, behaviors of fire smoke in the operation of disaster prevention facilities (smoke damper, jet fan) in a tunnel-type structure (soundproof tunnel) were investigated numerically and results of the investigation were compared and analyzed. Through the simulation and analysis, it was found that there was a significant change in the patterns of fire smoke between the opening of the ceiling of a fire vehicle and the closing, and it was shown that the critical temperatures of PC and PMMA, main materials of a soundproof tunnel were not exceeded. In addition, the simulation of installation intervals of smoke dampers showed that the maximum temperature of a soundproof tunnel without smoke dampers was $552^{\circ}C$ while it reached $405^{\circ}C$ when smoke dampers were installed at the installation interval of 50 m. The simulation of the operation of a jet fan showed that the maximum temperature of a soundproof tunnel without a jet fan was $549^{\circ}C$ while it reached only $86^{\circ}C$ when a jet fan was operating. Therefore, it is highly expected that they could create a favorable environment for evacuation and protection of soundproofing materials, and it would be necessary to promote basic studies on tunnels serving various functions and purposes.

Supporting The Tunnel Using Digital Photographic Mapping And Engineering Rock Classification (디지털 사진매핑에 의한 공학적 암반분류와 터널의 보강)

  • Kim, Chee-Hwan
    • Tunnel and Underground Space
    • /
    • v.21 no.6
    • /
    • pp.439-449
    • /
    • 2011
  • The characteristics of rock fractures for engineering rock classification are investigated by analyzing three dimensional point cloud generated from adjusted digital images of a tunnel face during construction and the tunnel is reinforced based on the supporting pattern suggested by the RMR and the Q system using parameters extracted from those images. As results, it is possible saving time required from face mapping to tunnel reinforcing work, enhancing safety during face mapping work in tunnels and reliability of both the mapping information and selecting supporting pattern by storing the files of digital images and related information which can be checked again, if necessary sometime in the future.