• Title/Summary/Keyword: 타워크레인

Search Result 93, Processing Time 0.022 seconds

The study on the safety inspection system model of the tower crane a construction site in Korea (국내 건설현장 타워크레인 안전진단 관리시스템 모델에 관한 연구)

  • Yeon, In-Soo;Seo, Jang-Hoon;Kang, Kyeong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2006.11a
    • /
    • pp.499-507
    • /
    • 2006
  • The tower cranes are widely used in very useful construction machine the sites of constructing high-structure and have a structural sensitiveness. Therefore, the accidents have often happened due to the deficiency of laborer's understanding md lack of safety of structure. Till now, as we have research and studied above, we can properly protect accidents by construction equipments particularly crane as well as most disasters which occur frequently in construction site. The goal of this study is the safety inspection model of the tower crane a construction site, which preventible the collapse accident of tower crane which is constructed by using the correcting frame. In order to accomplish the goal of this study, the field survey, the reference investigation and the structure analysis were performed for the collapse accident of tower nine using the correcting data. This study will be proposed a build-up solutions about operating and release of safety constructions and researched about software safety estimation. Also, preventing safety problems of Tower Crane Construction site as applying safety estimation program and laws and regulations. As a result, The real time control of tower crane inspection system is implemented by to illustrate the application of the adopted optimal design model.

  • PDF

A Study on the Safety Inspection System Model of The Tower Crane a Construction Site in Korea (국내 건설현장 타워크레인 안전진단 관리시스템 모델에 관한 연구)

  • Yoon, In-Soo;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.1
    • /
    • pp.37-49
    • /
    • 2007
  • The tower cranes are widely used in very useful construction machine the sites of constructing high-structure and have a structural sensitiveness. Therefore, the accidents have often happened due to the deficiency of laborer's understanding and lack of safety of structure. Till now, as we have research and studied above, we can properly protect accidents by construction equipments particularly crane as well as most disasters which occur frequently in construction site. The goal of this study is the safety inspection model of the tower crane a construction site, which preventible the collapse accident of tower crane which is constructed by using the correcting frame. In order to accomplish the goal of this study, the field survey, the reference investigation and the structure analysis were performed for the collapse accident of tower crane using the correcting data. This study will be proposed a build-up solutions about operating and release of safety constructions and researched about software safety estimation. Also, preventing safety problems of Tower Crane Construction site as applying safety estimation program and laws and regulations. As a result, The real time control of tower crane inspection system is implemented by to illustrate the application of the adopted optimal design model.

Check system for wearing hard hat with wireless sensor network (무선 센서 네트워크를 이용한 안전모 착용 확인 시스템)

  • Jang, Mun-Suck;Yeom, Mun-Jin;Song, In-Yong;Kwon, Oh-Sang;Lee, Eung-Hyck;Choi, Sang-Bang
    • Proceedings of the KIEE Conference
    • /
    • 2007.10a
    • /
    • pp.209-210
    • /
    • 2007
  • 본 연구에서는 건설현장에서 빈번히 발생하는 안전사고를 줄이기 위해 근로자의 안전모 턱끈 착용을 도와주고 안전관리 감독자가 쉽게 확인 및 관리할 수 있는 전자식 안전모 착용 확인 시스템을 개발하였다. 안전모 착용을 확인하기 위해 마그네틱 근접 센서를 안전모 턱끈에 장착하여 안전모 착용 여부를 검출할 수 있게 하였다. 그리고 무선 센서 네트워크를 구성하기 위해 424.700MHz 주파수를 사용하는 무선 모듈을 개발하여 안전모의형에 장착하여 센서 노드(Sensor Node)를 구성하였으며, 메쉬 토폴로지(Mesh Topology)를 적용하였다. 그리고 중앙 관리실에서 근로자의 상황 인지를 위한 안전모 확인 모니터링 시스템을 개발하였다. 본 시스템으로 인하여 근로자의 안전을 도모하고, 안전 사고에서 근로자의 부상 및 인명 손실을 최소화할 수 있으며, 건설용 엘리베이터 안전 상황 인지, 타워크레인 안전 문제등의 시스템으로 활용이 가능할 것이다.

  • PDF

Construction of Super-block Unit Curtain Wall for High-rise Buildings Utilizing a Specialized Installing Equipment (전용 양중틀을 활용한 초고층 건물의 슈퍼블럭 유닛 커튼월 시공)

  • Chung, Sam-Yong;Lee, Sang-Heon;Ohk, Young-Mu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.174-181
    • /
    • 2004
  • We will introduce a method of construction of super-block curtain wall applied to Tower Palace III which is the highest high-rise complex building in Korea. Up-up method is utilized on Tower Palace III to shorten the term of works and it is that the curtain walls for the belt wall part are installed after the rests. The belt wall structure increases the horizontal structural stiffness of the building. The method of construction of super-block curtain wall is developed and used to raise and install the curtain wails of the belt wall floor. It is that the large block of curtain walls corresponding to three stories is fabricated on the ground in advance and the block is installed at a time by a tower crane. Specialized installing equipment :,s newly developed and applied to install the super-block. curtain wail. The curtain wall of the upper floor of the belt wall part is installed after the super-block. The installing equipment for this floor is developed utilizing a mini excavator and vacuum suctions. The application of this method had made it possible to omit the setting up the scaffold and financial profits such as the shortening of the terms of works was realized. The safety of works was secured and the productivity was also improved.

  • PDF

Development on Breakdown Structure of Construction Site centered Construction Temporary Technology Index (현장중심의 건설가설기술요소 분류체계 구축)

  • Park, Junmo;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.77-85
    • /
    • 2014
  • A construction temporary work is main process and importance trade section. It has many works and facilities such as temporary transfer equipments which tower crane, and lift, and architectural temporary facilities which temporary office, temporary warehouse, and site test laboratory, and construction temporary equipments which scaffoldings, work plates, construction supports, and forms to set and to use in under construction and to remove in the end. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study is organized existing technology systems and new technologies for field works, and developed breakdown structure of construction temporary technologies to be a basic of temporary technologies as review with site managers. For this, it will improve to be a knowledge and information system as a research of a performance and an availability about a construction temporary technology index.

A study on the work environment and accident exposure status of Tower Crane workers (타워크레인 작업 근로자의 작업환경과 사고 노출 실태에 관한 연구)

  • Choi, Seo-Yeon;Cho, Kee-Hong;Park, Dong-Hyun;Choi, Byung-Gil
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.115-123
    • /
    • 2015
  • The study conducted statistical analysis of survey on the 239 workers participating in national Tower Crane installation/dismantlement in order to identify work environment and health hazard exposure of Tower Crane workers. Consequently for work related safety status of Tower Crane workers, the number of installation/dismantlement work was the highest at 15-20 times per month, and safety equipments were not arranged at work and they felt highly anxious when boarding on the Tower Crane. Furthermore, it is found that they feel anxious working in the influence of the weather, noise, vibration, wind, the sun ray, and structure characteristic. They have very low satisfaction in the insecureness of workplace and the work environment, and recognizes that their work affect highly on the health. 81.6% of workers have experienced accident at work, the cause of accidents were mainly due to poor work environment, and the health abnormality they have experienced were mostly fatigue and concentration reduction. For job stress, job demand and conflict in relationship were the highest sections. Total 66.5% of workers complained of musculoskeletal disorder related subjective symptom, and back pain patients were the highest of all groups.

A Study on the Structural Safety of Tower Crane Telescoping Work according to Wind Speed and Load (타워크레인 텔레스코핑 작업의 풍속 및 하중에 대한 구조 안전성 연구)

  • Jung, Sung-Lyoung;Lee, Do-Geun;Paik, Shinwon;Shin, Sang-Yeon
    • Journal of the Korean Society of Safety
    • /
    • v.36 no.1
    • /
    • pp.9-17
    • /
    • 2021
  • This study analyses the load imbalance of the tower crane used in telescoping work for structural safety, owing to the difference in wind speed and balance weight position. This is because wind speed and position of the balance weight have a significant impact on the structural stresses of a tower crane during telescoping work. Therefore, structural analysis was performed on the 290HC model, which is often used at construction sites and has only one cylinder installed. Moreover, two models were classified to determine the load acting on the connecting part of the telescopic cage to slewing platform and the cylinder. Five types of balance weight positions were applied at regular intervals from jibs; moreover, four types of wind load criteria were differently applied. Hence, the telescopic cage columns were destroyed at all balance weight positions at a wind speed of 30 m/s and only at certain locations at a wind speed of 20 m/s. Furthermore, failures occurred for cylinders, torsional, and bending at wind speeds of 30 m/s and 20 m/s, load imbalances above the allowable thresholds considering the safety factor. In addition, the load imbalance in the telescoping work also varied depending on the position of the balance weights. The results of these studies have validated that the current standards of adjusting the appropriate position of the balance weights on the jib are completely valid, with the telescoping work to be executed only at wind speeds of less than equal to 10 m/s.

Theoretical consideration and digital control for automation of tower cranes (타워형 크레인의 자동화를 위한 이론적 고찰 및 디지탈 제어에 관한 연구)

  • 이진우;이충환;김상봉
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1992.10a
    • /
    • pp.993-998
    • /
    • 1992
  • The paper treated the oscillation control of cargo rope and the position control of cart for a tower crane system by adopting the optimal regulator method. Since the tower crane has nonlinearity and it is very unstable when the cargo is mobiling, an insensitive control system with respect to oscillation of cargo rope and disturbance such as wind is required. In this paper, model equation of the tower crane is induced by using Lagrange equation and it is linearized at equilibrium point. The real time control of tower crane syste is implemented by 16bits microcomputer with A/D and D/A convetters to illustrate the application of the adopted optimal desgn method.

  • PDF

Measures to Reduce Tower Crane Accidents During Operation by Improving Signal System and Education for Signalmen (신호체계와 신호수 교육 개선을 통한 양중 작업 중 타워 크레인 사고 저감 대책)

  • Yun, Dong Hun;Park, Jong Yil;Kee, Jung Hun
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.4
    • /
    • pp.68-75
    • /
    • 2019
  • As the tower crane accident emerged as a social issue in 2017, various government measures were prepared. Most of the measures are focused on erecting, climbing, and dismantling phases. Analyzes of 84 serious accidents related to tower cranes from 2000 to 2018 and 104 near misses accidents from 2016 to 2018 revealed that 50% of the serious accidents occurred during the operating phase. The main occupation influencing operating phase accidents was signalman(81.6% of serious accidents), whose communication and competency were governing causes. This result was the same in 294 questionnaires to signalmen. Signal systems and education policies for tower crane signalman in Korea and foreign countries were analyzed, and standardization of wireless signal system and improvement of education system were propose.

Field Survey on Suitable In-service Wind Speed Limit for Tower Crane Operation (타워크레인의 작업 중지 풍속에 대한 현장 실태 조사 연구)

  • Lee, Eui Ju;Shin, Sung Woo
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.1
    • /
    • pp.103-108
    • /
    • 2018
  • Since tower cranes are susceptible to wind loads, the operation of the tower crane should be ceased when it exposed to a strong wind. For this reason, even in Korea, the operation limit for wind loading on the tower crane is regulated by a law. Recently the Korean law in which provided the wind speed limit to cease the tower crane operation has been revised from "instantaneous wind speed of 20 m/s" to "instantaneous wind speed of 15 m/s". Although this revision is expected to reduce safety risks in tower crane operation, some field operators still insist to lower the wind speed limit. However, in many countries "wind speed of 20 m/s" is normally used as the maximum in-service wind speed for tower cranes. Therefore, the investigation of the proper wind speed for regulation would be helpful to secure the safety of the tower crane operation under windy condition. In this study the validity of the revised wind speed limit is investigated with the surveys targeted to both tower crane practitioners and parties of concerned in construction companies, in which various questions was provided for a suitable wind speed limit and the answers were analyzed. The results showed that the revised wind speed limit is acceptable to tower crane practitioners as well as the parties of concerned in construction companies and is satisfying the structural stability requirement for in-service state tower crane. Therefore, it can be concluded that the revised wind speed limit is valid in humanly safety point of view.