• Title/Summary/Keyword: 타당성 분석단계

Search Result 486, Processing Time 0.029 seconds

A Method for Migration of Legacy System into Web Service (레거시 시스템의 웹서비스화를 위한 마이그레이션 기법)

  • Park, Oak-Cha;Choi, Si-Won;Kim, Soo-Dong
    • The KIPS Transactions:PartD
    • /
    • v.16D no.4
    • /
    • pp.583-594
    • /
    • 2009
  • Most of the SOA solutions applicable to businesses and organizations are taking a top-down methodology. It starts with an analysis of an organization's requirements, followed by definition of business models and identification of candidate services and ends with finding or developing required services. Challenges in adopting SOA while abandoning legacy systems involve time and cost required during the process. Many businesses and organizations want to gradually migrate into SOA while making the most of the existing system. In this paper, we propose A Method for Migration of Legacy System into Web Service(M-LSWS); it allows legacy system to be migrated into web service accessible by SOA and be used as data repositories. M-LSWS defines procedures for migration into reusable web services through analysis of business processes and identification of candidate services based on design specification and code of legacy system. M-LSWS aims to migrate of legacy system into web service appropriate for SOA. The proposed method consists of four steps: analysis of legacy system, elicitation of reusable service and its specification, service wrapping and service registration. Each step has its own process and guideline. The eligibility of the proposed method will be tested by applying the method to book management system.

The Analysis of the Importance of Influencing Factors in the Planning Stage of the Long-Term Public Rental Housing of Remodeling Project (장기공공임대주택 리모델링 사업의 기획단계 영향요인 중요도 분석)

  • Jung, Yong-Chan;Jin, Zheng-Xun;Hyun, Chang-Taek;Lee, Sanghoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.3-16
    • /
    • 2024
  • The government announced the Housing Welfare Roadmap (November 2017), to expand the supply of public rental housing by reconstructing aged long-term public rental complexes. Also, remodeling projects for complexes with low business feasibility of reconstruction projects are recognized as an alternative to supplying public rental housing in urban area. This study analyzed influence factors by dividing them into project feasibility, architectural plan, urban & residential environment plan, and legal system groups in order to establish a plan for long-term public rental housing remodeling project. Futhermore, this work conducted the principal component analysis to get the principal component factors among the influence factors of each group, and the weight analysis to calculate weighting of them. In addition, major influence factors were derived by calculating the relative importance score (RIS) of each factor. Lastly this paper validated the major influence factors and applicability of the procedure to select 3 complexes that can be reviewed for remolding project among 33 long-term public rental housing complexes located in Seoul. The results of this study are expected to be useful when establishing a remodeling project plan for long-term public rental housing.

A Study on Development and Site selection of an AIRFIELD (경비행장 개발 및 입지선정에 관한 연구)

  • Park, Sang-Yong
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.30 no.2
    • /
    • pp.3-36
    • /
    • 2015
  • As of end of 2014, the population engaging in aviation activities for leisure has reached approximately 13 million, where approximately 356 cases involve a general aircraft, 200 cases involve light aircraft, and 636 cases involve an ULM. The industry for leisure has become a very promising industry in line with rapidly rising living standards which are expected to further increase in the future. The demand for such services is expected to increase over time. The purpose of this paper is to review the development and site selection of airfields in anticipation of these developments in the industry. While the government also has experience in the review of airfield location and candidate sites, it is not the government that carries out the actual construction. As such, the feasibility of the site needs to be verified in terms of actual construction. This study identified factors for Site Selection of factors through a review of related documents and existing research reports. A questionnaire was also used to collect the views of experts in the field, which was then analyzed. The Research model was confirmed in the layered form for an AHP analysis. The factors for Site Selection were identified as the technical / operational factors and economic / political elements for a two-stage configuration. The third step consisted of technical and operational elements. The final step is was constructed a total of 11 elements (weather, surface conditions, obstacle limitation surface, airspace conditions, operating procedures, noise problems, environmental issues, availability of facilities, construction and investment costs, contribution to the local economy, accessibility, demand / the proximity of demand). The surveys are conducted for more than 10 General and light aircraft pilots, professionals, and instructor. The analysis results showed a higher level in the technical / operating elements (73.2%) in the first step, while the next step sawa higher level of the operational elements (30.9%) than the other. The factors for Site Selection were any particular elements did not appear high, the weather conditions (17.5%), noise problems (19.8%), the proximity of demand (6%), accessibility (5.7%), environmental issues (11.1%), availability of facilities (8%), airspace conditions (7.9%), obstacle limitation surface (12%), construction and investment costs (4.2%) and to operating procedures (4.9%), contribution to the local economy (3.8%).

Multiple Pipelined Hash Joins using Synchronization of Page Execution Time (페이지 실행시간 동기화를 이용한 다중 파이프라인 해쉬 결합)

  • Lee, Kyu-Ock;Weon, Young-Sun;Hong, Man-Pyo
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.27 no.7
    • /
    • pp.639-649
    • /
    • 2000
  • In the relational database systems, the join operation is one of the most time-consuming query operations. Many parallel join algorithms have been developed to reduce the execution time. Multiple hash join algorithm using allocation tree is one of most efficient ones. However, it may have some delay on the processing each node of allocation tree, which is occurred in tuple-probing phase by the difference between one page reading time of outer relation and the processing time of already read one. In this paper, to solve the performance degrading problem by the delay, we develop a join algorithm using the concept of 'synchronization of page execution time' for multiple hash joins. We reduce the processing time of each nodes in the allocation tree and improve the total system performance. In addition, we analyze the performance by building the analytical cost model and verify the validity of it by various performance comparison with previous method.

  • PDF

Numerical Dispersion and Its Control for 1-D Finite Element Simulation of Stress Wave Propagation (응력파 전파 수치모의를 위한 일차원 유한요소모형의 분산 특성 및 제어)

  • 이종세;유한규;윤성범
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.17 no.1
    • /
    • pp.75-82
    • /
    • 2004
  • With an aim at eliminating the numerical dispersion error arising from the numerical simulation of stress wave propagation, numerical dispersion characteristics of the wave equation based one-dimensional finite element model are analyzed and some dispersion control scheme are proposed in this paper The dispersion analyses are carried out for two types of mass matrix, namely the consistent and the lumped mass matrices. Based on the finding of the analyses, dispersion correction techniques are developed for both the implicit and explicit schemes. For the implicit scheme, either the weighting factor for the spatial derivatives of each time level or the lumping coefficient for mass matrix is adjusted to minimize the numerical dispersion. In the case of the explicit scheme an artificial dispersion term is introduced in the governing equation. The validity of the dispersion correction techniques proposed in this study is demonstrated by comparing the numerical solutions obtained using the Present techniques with the analytical ones.

A Study on The Reengineering Tool From conventional System into Design Pattern (기존 시스템에서 설계 패턴으로의 재공학 툴에 관한 연구)

  • Kim, Haeng-Kon;Cha, Jung-Eun
    • The Transactions of the Korea Information Processing Society
    • /
    • v.5 no.9
    • /
    • pp.2334-2344
    • /
    • 1998
  • Appliciltion systems focusing class units, as component abstraction based on source code, has insufficient benefit of independency and reuse of elements. Only few effects are acquired, because it is only inclined implementation. We need design pattern to represent not only the problem abstraction but also information and relationship between system elements for generic solutions of specific domain Also, it is essential to software reverse engineering to catch the correct system through examming the cxisting system and utilizing the acquired knowledges as reusable resource. Namely, software reverse engineering for extracting the design pattern is very important because it improves the understand ability for system analysis and design through extracting the design structure of object-oriented system, and provides rich and high leIel reusabilitv through grasping the standard idioms and relationships between components. In this paper, we defined the extraction algorithm for design patterns with standardized, packaged and quantitative measlIIul thruugh applying reyerse engineering into existing ubject Olicnted system. And we designed the reengineering toul including reverse engineering for autumatic extractiun of design patterns ami reuse fur retrieval. editing and rebuilding oi design patterns. Also we applied the algorithms into Java applications.

  • PDF

Evaluation of Container Terminal Types (컨테이너 터미널 유형 평가 - 생산성 및 비용 분석 중심 -)

  • Yoo, Myoung-Jong;Nam, Ki-Chan;Song, Yong-Seok
    • Journal of Navigation and Port Research
    • /
    • v.27 no.5
    • /
    • pp.577-584
    • /
    • 2003
  • Container terminals are various in terms of layout, cargo handling systems and operational aspects resulting in difference in productivity and economic feasibility. Therefore, by evaluating different terminal types, more comprehensive understanding can be grasped. For this the paper aims at evaluating the three terminal types under operation, the conventional terminal, the unmaned terminal and the indented terminal, with respect to productivity and cost. Based on the results in connection with the situation of Korean container terminal operation, feasibility for each type is discussed with suggestion for the optimal type.

Development of an Optimized Prediction System of Round Trip Occurrence using Genetic Algorithm (유전자알고리즘을 활용한 최적화된 라운드트립 발생 예측 시스템 개발)

  • Lee, Seung Soo;Seo, Jong Won;Kim, Kwang Yeom;Shin, Hyu-Soung
    • Tunnel and Underground Space
    • /
    • v.25 no.6
    • /
    • pp.534-542
    • /
    • 2015
  • Round trip activity occurs discretely due to the abrasion of drill bit in the deep drilling project. Round trip has great impact on the drilling performance because it takes more time to change a drill bit as the depth goes deeper. Therefore, a reliable prediction technology of the round trip should be secured for feasibility analysis and effective management of the drilling project. Lee et al. (2013) developed the TOSA (round trip occurrence simulation algorithm) which can analyze the depth and timing of round trip occurrence at each abrasion state of bit. However, TOSA has weakness that it takes long time for simulation because the number of simulation increase exponentially as increasing the number of simulation section. This study developed the TOSA based round trip performance prediction module using genetic algorithm for simulating in a short time and verified simulation results.

A Process Model for Effective Idea Creation and Administration of Value Engineering at Design Phase Activity (설계VE활동의 효과적인 아이디어 창출 및 관리를 위한 프로세스 모델)

  • Kim, Hong-Hyun;Min, Kyung-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.13-21
    • /
    • 2009
  • The ideas created by the execution of Value Engineering(VE) during design phase are usually proposed in a scattered way due to the characteristic of brainstorming. Because of this process, it is likely that similar ideas are proposed duplicatedly, and the created similar overlapping ideas may lead to different analyses and evaluations respectively. The efficient analysis/evaluation of the such similarly created ideas are not easy and the verification of the adequacy and objectivity of the ideas becomes harder and the objective evaluation gets more difficult as well as consumes much time. In spite of the perfect executions of preparatory step for idea creation, the difficulties in managing the similarly created ideas in quantity systematically result in the reduced reliability of the VE activities during design phase. Thus, this study proposes a process model for the efficient idea creation and management of the VE activities during design phase.

Kingdon의 다중흐름모형을 활용한 연구개발 정책혁신 과정 분석 : 국가전략프로젝트에 대한 예산심의·의결을 중심으로

  • Kim, Ju-Hui
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 2017.11a
    • /
    • pp.515-534
    • /
    • 2017
  • 본 연구는 Kingdon의 다중흐름모형(MSF: Multiple Stream Framework)을 통하여 정부연구개발예산 중 미래성장동력 부문에 대한 예산결정 과정을 살펴보았다. 연구 대상은 대통령 의지로 의제가 발기된 정책의제 국가전략프로젝트이며 비합리적 의사결정에 대한 견제수단으로 활용되는 예비타당성조사가 예산의 결정단계로 이어지는 일련의 과정을 살펴보았다. 연구의의는 3개 흐름에서 행해지는 비합리적 의사결정 케이스를 확인하고, 정부 R&D 사업의 예산결정과정에서 온-오프 스위치 역할을 하고 있는 게이트 키퍼(gate keeper)인 사업 평가자(PM), 구체적 사업계획안을 만드는 부처의 사업기획자, 그리고 자문역할을 하는 전문가집단을 정책혁신가로 바라볼 수 있다는 의의를 발견했다. 공공부문의 정책혁신가는 사업을 기획한 부처와 같이 자기(부처)이익을 추구하지는 않지만 공공가치를 추구하는 독립적인 위치에 있었고, 어느 일면에는 과학기술분야의 성장과 발전을 바라고 있었다. 다시 말해, 연구는 정책혁신가라는 존재가 특정한 개인 또는 집단일 뿐만 아니라 2개 집단 이상의 복수의 정책혁신가가 있을 수 있는 가능성을 확인하였다. 특히, 예비타당성조사에서 PM이 흐름 간의 중개를 상향적 직접적으로 수행하지 않지만, 하향적으로 사업기획자 등 주체들 간 의견을 조정하고 합의를 이끌어 내는 모습은 중요 활동을 하고 있음이 확인되었다. 연구는 정책혁신가의 새로운 형태를 발견하였지만, 정책결정의 전 주기가 아닌 정부예산 이후 국회예산이라는 특정 시기를 대상으로 하였는데, 분석 과정에서 예산과 시간의 제약으로 사업기획을 담당했던 부처 및 기재부공무원, 해당기술 분야 연구자, 국회 관계자 등 관련 주체들의 견해를 고루 담아내지 못한 아쉬움이 있다. 향후 다양한 참여자들의 의견을 수렴할 수 있다면 정책 결정 과정에 정책혁신가의 다층적(Multiple) 존재 여부와 특성을 면밀히 들여다 볼 수 있을 것이다.

  • PDF