Korean Journal of Construction Engineering and Management
/
v.12
no.1
/
pp.13-22
/
2011
Many studies on cause and prevention of claim have been carried out but they were mostly intended to come up with the improvement measures, improvement system or the measures to deal with the claim, which consequently lacked the substantial ways to identify the details of claim for prevention purpose. That is, there's in fact no tool, in preparation for potential claims, to identify and review the major potential causes at design stage to mitigate the claim and thus, it's necessary to develop the tool such as checklist needed to prepare the claim-supporting documents, check the relevant laws as well as to identify the cause of claim. Hence the study, given the fact that cause of claim is mostly generated at the design stage though the claim itself tends to occur at the construction stage, was aimed at developing the checklist based on contract document such as design documents at design stage for public construction projects in a bid to prevent the potential claim occurred at the design stage.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.46-53
/
2001
Differing Site Conditions('DSC') Claims among construction claims are on the increase as a direct result of the steady construction of Social Overhead Capital Facilities initiated by Government. As DSC claims generally became apparent during the intial stage of the construction project, it is necessary to timely review and study the proposal on the prevention of DSC claims because delayed settlement will incur more substantial damages to all parties concerned. This research is focused on the identification and analysis of the causes for DSC claims as applicable to design-build project in public sector and it presents the possible short term, medium and long term proposals on the improvement of causes related with DSC claims. The major results of this research are summarized as follows: 1. Improvement of contractor's tender practice 2. Contractor's division of responsibility on the site survey 3. Improvement of owner's exculpatory clause 4. Flexibility on the adjustment of contract amount The proposals stated above could be useful in resolving the DSC claims between owner and contractors.
Sung, Nak Won;Kim, Young Suk;Lee, Mi Young;Lee, Jung Sun
KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.1D
/
pp.115-123
/
2006
Recently, construction claims have been increased for protecting the rights of construction participants and effectively adjusting the changes under the contract. Thus, the importance of claim management has been emphasized in the construction industry. In domestic construction industry, some claim issues involved in construction activities are often being developed into disputes and even litigations because of the absence of methods or systems for the dispute resolution, and the lack of judicial precedents which can be provided as the references for resolving a particular dispute. In general, the judicial precedents related to the disputes and litigations occurred among construction participants would be extremely valuable in evaluating and analyzing current claims issues. However, such useful information has not been effectively accumulated and utilized in resolving the similar or sometimes identical types of disputes, thus requiring a large amount of additional costs, time and efforts. The primary objective of this study is to propose a web-based decision support system for construction claim management, which enables contractual participants to easily access and use the information of the judicial precedents related to the current construction claims. The decision support system is composed of 'prevention' and 'settlement' modules for avoiding and systematically resolving the construction claims.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.341-344
/
2002
Claims are on an increasing trend in the domestic construction field with changes of negative thought about them. But there are still many factors of causing disputes Potentially due to old customs that an owner is predominant over a contractor. Unless these factors are solved, it is obvious that many disputes will occur henceforward. This study derives claim factors that must be solved first of all through analyzing how claim factors influence construction management factors such as time, cost, quality, and presents countermeasures that may prevent these claims.
Korean Journal of Construction Engineering and Management
/
v.6
no.1
s.23
/
pp.205-211
/
2005
Turnkey projects accounting for some $10\%$ of the total volume of the projects in the domestic market have been often implemented without the process of full-scale review or study because of clients' lack of expert and expertise. Moreover, many projects have been executed under the terms and conditions of the contact which were found to be unilaterally in favor of the clients. The study, as part of effects to mitigate the claims that would possibly be caused by the potential problems with the typical turnkey projects, were intended to identify the elements of the claims virtually being occurred at the construction sites, and then analyze the degree of influence on the project so as to be able to incorporate the outcome into the plan at the working-levels. As a result of experts' review, through the survey, of the elements once extracted, those having relatively higher degrees of influence on turnkey projects were determined, and the investigation aimed at estimating the amount of claims in terms of value were conducted to eventually identify, evaluate and verify the elements that had affected the Project together with the degree of influence.
Korean Journal of Construction Engineering and Management
/
v.19
no.4
/
pp.70-81
/
2018
Claims in the construction industry can have a serious impact on the profitability of the project or can even result in project failure if it fails to take appropriate prevention. In order to properly prevent and respond to the potential claims and legal disputes throughout the project execution, it is necessary to continuously accumulate informations and clearly define the roles and responsibilities of the important activities systematically. Based on these needs, this study develops and verifies the project information management system(PMIS) that can prevent and respond possible claims for construction projects. Developed system includes such management modules as schedule, cost, PM/CM, design, collaboration, and claims. The system was validated by adopting it to the practical projects. The results showed that information systems tailored to the construction claim need to elevate users' familiarity to be more useful. Besides, the system can be more functional when used by both owners and contractors.
In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Proposing the response devices to the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.239-242
/
2007
Many contractors have overlooked the construction contract general conditions and it was a bad construction practice. Today, construction project is very complex and complicated. This requires a networked contract document and results in a complicated contract conflict hardly to be solved. Therefore, to reduce the construction dispute and to enhance construction practice, clarification of definition of Owner, several conditions to be revised, insertion of design supervision were suggested in this paper.
This study, with reference to data on economic conditions in Shandong Province, China, looked into trade and investment activities in Korea and major cities of Shandong - Qingdao, Yantai, Weihai and Jinan - and investigated claim cases between the two countries by type. In addition, we investigated the matter empirically by conducting a survey administered to 300 Korean companies investing in Shandong Province and, based on the data, tested hypotheses for inferential analysis. The findings are as follows: i) while hypotheses in which the size of a firm, represented by import and export volume, has a positive relation with the frequency of trade claim filings (H1) and with the financial value of the trade claims (H2) were quoted, company size proved to have a significantly negative relation with the time required to obtain a claim decision, which rejects the third hypothesis (H3) in which the relation was thought to be positive: ii) while products, as represented by the type of business, showed a clearly significant difference with the frequency of trade claim filings (H4) and with methods of preventing and responding to claims (H6), they did not show a significant link to the type of trade claim (H5). This study is a theoretical and empirical overview of Korean companies based in Shandong Province of China, and can be used to address the practical needs of the Korean companies looking to start business in Shandong Province.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.54-62
/
2001
Although claims and disputes may be never avoided in construction industry, until 1998, there are no systematic claims in the public sector in Korea. But, because of IMF, Contractors have been recognized that cost management is essential factor and contractual right can be demanded against the Public Orderer. Many affirmative effect such as, appearance of new professional service, prevention of lower quality construction, restrain of unnecessary budget expenditure, arrangement of duplicated or triplicated liability and revision of unnecessary administrative control may be anticipated through alleging claims, but in site representative manager and construction company may have ambiguous fear, somebody tried to allege claims. Therefore, to activate systematic construction claims, 32 public construction project claims alleged by contractors from 1998 to 2001 were analyzed, inactivated reasons of claims were examined and contractor's action plan to allege claims was suggested in this paper.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.