• Title/Summary/Keyword: 콘크리트 방식 공법

Search Result 78, Processing Time 0.025 seconds

An Experimental Study on Evaluation of Bond Strength of Arc Thermal Metal Spaying According to Treatment Method of Water Facilities Concrete Surface (수처리 시설물 콘크리트 표면처리 방법에 따른 금속용사 피막의 부착성능 평가에 관한 실험적 연구)

  • Park, Jin-Ho;Lee, Han-Seung;Shin, Jun-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.107-115
    • /
    • 2016
  • In this study, the bond strength of metal spraying system by surface treatment of concrete (waterproof/corrosion method) in water treatment facilities was evaluated. The results showed that the system with Sa-P-R-(S) (sanding-perviousness surface hardener-surface roughness agent-metal spraying-sealing) led to the desirable performance. The bond strength, the coefficient of water permeability and air permeability were 3.7MPa, $0.68{\ast}10^{-8}cm/sec$, and $0.45{\ast}10^{-16}m^2$, respectively. In scanning electron microscope analysis, the microstructure of specimen coated with perviousness surface hardener was much denser than that without it. Therefore, the specimen coated with sanding-perviousness surface hardener-surface roughness agent-metal spraying-sealing had the best bond performance and was the most suitable system to concrete surface in water treatment facilities.

An Experimental Study on the Structural Performance of Lateral Resistance in Steel Elevator Pit (강재엘리베이터 피트 측압저항 구조성능에 관한 실험적 연구)

  • Hong, Seong-Uk;Kim, Tae-Soo;Baek, Ki-Youl
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.3
    • /
    • pp.1-8
    • /
    • 2019
  • Steel elevator pit was developed for the purpose of minimizing the excavation, simplifying the construction of the frame and economical efficiency by improving the problems that occurred in the existing reinforced concrete. It is common to apply conventional RC method through excavation to underground structures such as underground floor collector well and elevator pit. In recent years, the use of steel collector well and steel elevator pits to reduce construction costs by minimizing the materials of steel and concrete has been continuously increasing. The steel elevator pit is an underground structure and then the performance of the welding part and the structure system is important. Specimen with only steel plate and concrete without studs could support the load more than 3 times than the specimen with deck only. Therefore, even if there is no stud, the deck (steel plate) rib is formed and the effect of restraining the steel plate and the concrete during the bending action can be expected. However, since sudden fracture in the elevator pit may occur, stud bolt arrangement is necessary for the composite effect of steel plate and concrete. It is expected that the bending strength can be expected to increase by about 15% or more depending with and without stud bolts.

Study on the Extension of Reinforced Concrete Slabs (철근콘크리트 바닥판 평면확장 공법에 대한 연구)

  • Kim, Jin-Pyeng;Kim, Sang-Sik;Choi, Kwnag-Ho;Jeon, Byong-Gap;Lee, Jung-Yoon
    • Journal of the Korea Concrete Institute
    • /
    • v.18 no.3 s.93
    • /
    • pp.321-330
    • /
    • 2006
  • In order to remodel old aged reinforced concrete buildings, it is often required to extend the residence area of the buildings by increasing the slab area. The slab area is usually extended by attaching a new slab to the existing slab with hinged joint or rigid joint. Transmission of the loads of the attached slabs to the existing slabs depends on the connecting methods, such as hinged or rigid connection. In this research, 8 specimens and 24 RC slabs connected by rigid joints were tested. The new slab was connected to the existing slab by three types of rigid joints using dowel bars and longitudinal tensile bars. Main parameters of the slabs were three types of the rigid joints, anchor length of steel bars(0, 50, 60, 100, and 120mm), development length of steel bars(100, 200, and 300mm), and the spacing of the steel bars(150, 200, 300, and 450mm). The test results indicated that the flexural strength of the RC test slabs having various types of rigid joints was approximately the same to that of the slab without any connections.

A Structural Performance Test of a Full-scale Pretension PSC Girder (실물모형 프리텐션 PSC 거더의 구조성능 시험)

  • Kim, Tae Kyun;Lee, Doo Sung;Lee, Sung Chul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.1741-1751
    • /
    • 2013
  • The main purpose of this study is to investigate the static behavior of a prestressed concrete (PSC) girder using pre-tension method. A 30m long full-scale pretension PSC girder is fabricated by the portable fabrication system and tested. All results have been compared to those obtained from F.E.A results. Deflections at the middle of girders have been measured for evaluation. Also, strains of concrete at the middle of span have been measured. From the results of experimental, the load when initial crack was developed was obtained to be 1.75 time the unfactered design load in the full-scale girder specimen. Also, the data of specimen are satisfied the desgin requirements of ductility on the Korea Bridge Design Specification(2010). In service state, the vertical deflection at center of test specimen when a initial crack was developed is satisfied the vertical deflection requirement under live load of the Korea Bridge Design Specification(2010). To verify the experimental results, we numerical analyze the test and confirmed that the data were similar with results from the test above. The pretension girder fabricated in site were found to have enough strength for safety under and after construction.

Experimental Study on the Penetration Depth and Concentration of Corrosion Inhibitor Using Press-in Method Into the Inside of Concrete (콘크리트 내부로의 압입공법을 사용한 방청제의 침투깊이 및 농도에 관한 실험적 연구)

  • Cho, Hyeong-Kyu;Yoo, Jo-Hyeong;Lee, Han-Seung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.5 s.57
    • /
    • pp.160-168
    • /
    • 2009
  • After steel bar was corroded it removes concrete contaminated, it does steel bar corrosion protection, repairing method and corrosion inhibitor spreading method are difficult to secure corrosion protection performance. Accordingly, in this research before Research and Development to penetrate corrosion inhibitor to high pressure by steel bar position, it measures penetration depth through corrosion inhibitor high pressure penetration experiment and amount of nitrite by position and then it predicts penetration depth in accordance with water-cement ratio, pressure, pressure time and it computed water-cement ratio, pressure, pressure time to be more than 0.6 mol ratio of chloride ion and nitrite to have outstanding corrosion protection performance. As a result of experiment, water-cement ratio gives the biggest influence to penetration of corrosion inhibitor and also the more depth of specimen becomes deep, concentration of penetrated corrosion inhibitor does not equal and becomes low.

An Analytical Study for the Stair Joints Constructed with Prefabricated Form System (선시공 조립식 거푸집 공법을 이용한 계단 접합부의 접합방식에 따른 해석적 연구)

  • Lee, Eun-Jin;Jin, Byung-Chang;Chang, Kug-Kwan
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.301-304
    • /
    • 2008
  • The stair joints constructed with prefabricated system are general method doing structure design at hinge. If you regarded joints to come in contact with a flight of stairs and a slope of stairs as hinge, the moment performance of joints is not in the least moment, so as the bending moment of the stair case is increased, the reinforcement increase. Also the use is decreased because increasing the joint damage of the vibration & fatigue load. No less the reason constructed with pin the stair joints because the construction efficiency of field work is useable. Recently, they are considering the construction efficiency, while the semi-rigid detail for bending performance of joints is proposed, but for now they don't reflect the detail. Therefore, we proposed that reflecting the method at design semi-rigid joints. We compared the moment performance with the stair joints designed at the rigid joints, semi-rigid joints and pin joints. The nonlinear behavior of staircase core statically indeterminate structure. The result of research is that a bending stiffness modulus bring to reflect the semi-rigid performance, the performance of the semi-rigid joint is better than pin joints, and that is judged the system better seismic and vibration performance because have excellent ductility more than rigid joint.

  • PDF

A Study on the Development and the Practical Approach for Repair Method of RC Structures Subjected to the Chemical Attack (화학적 침식을 받은 콘크리트구조물의 보수기술 개발과 실용화연구)

  • Moon, Han-Young;Shin, Dong-Gu;Kwon, Young-Jin
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.2
    • /
    • pp.155-162
    • /
    • 2005
  • This paper presents an invetigation into the cause of deterioration of wet surrounding RC structures subjected to checmical attacks such as sewage. The antibacterial-reforming agent is developed after determining the permeability of the RC structure. After application of the anitbacterial-reforming agent through SEM, the permeability, compressive strength properties and the micro-structure of the concrete were evaluated for durability. In addition, the antibacterial-reforming agent was combined with a protective coating for the wet surrounding RC structure and evaluated for durability. The combined effect of the antibacterial-reforming agent and the protective coating were evaluated in field tests in both sewer system and tunnel sites.

Reaction Characteristics of the CAC with Various Gypsum Type and Mixing Ratio (석고 종류 및 혼입률에 따른 CAC 반응 특성)

  • Choi, Sun-Mi;Kim, Jin-Man;Koo, Ja-Sul
    • Resources Recycling
    • /
    • v.30 no.1
    • /
    • pp.83-91
    • /
    • 2021
  • Ladle furnace slag is a byproduct of the steel-making process, and it contains the mineral β-C2Sandtherapid-settingmineral (dependingonwhichreducingagenthasbeenused). Ladle furnace slag is often treated through slow cooling, which causes the slag to lose its reactivity. In this study, the properties of air-quenched CAC and pulverized ladle furnace slag containing gypsum were evaluated, and the optimal mixing ratio was determined for broadening their usage. Consequently, the properties of CAC aredemonstrated by the dissolution of gypsum after a period of three hours and the content of gypsum after a period of one day. The optimal mixing ratio of anhydrate and hemihydrate gypsum is found to be within 30% and that of dihydrate gypsum is found to be higher than 35%. Furthermore, based on the results of CAC with dihydrate gypsum, the applicability of the by-product dihydrate gypsum has been verified.

An Experimental Study on Heating Manufacture of Recycled Aggregate by Design of Experiment (실험계획법을 이용한 가열방식의 순환굵은골재 제조를 위한 실험적 연구)

  • Nam, Eun-Yong;Hwang, Sun-Bok
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.8 no.1
    • /
    • pp.11-17
    • /
    • 2013
  • The use of wasted concrete can settle the environmental pollution and shortage of natural aggregate. However, recycled aggregate includes substantial amount of cement paste, so that these aggregates are more porous, and less resistant to mechanical actions than natural aggregates. Recently, the new manufacturing processes of high quality recycled aggregates were suggested such as heating. In this paper, for the purpose of manufacture of high quality recycled aggregates, the heating processes was considered to the existing process of recycled aggregates. To find the optimum process, the experiment was performed through the statistical design of experiment. The heating temperatures of 4 levels (300, 450, 600 and $750^{\circ}C$) and heating duration time (5, 20, 40, 60minute) were main experimental variables. Through the test results, it was found that the optimum manufacturing condition of coarse recycled aggregate was evaluated to be $600^{\circ}C$ and 40minute.

  • PDF

An Experimental Study of Tension Properties on New Developed Up-Set Coupler (Up-Set Coupler 이음철근의 인장특성에 대한 실험적 연구)

  • Sim, Jong-Sung;Park, Cheol-Woo;Kang, Tae-Sung;Kim, Tae-Soo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.5
    • /
    • pp.109-115
    • /
    • 2008
  • As structures are getting super-rise and large-sized, introducing the construction methods such as prefabrication of bar-meshes and complex method are being actively discussed to pursue the high quality of reinforced concrete, the simplification of field works, and the reduction of duration, as well as the study on how to connect reinforcing rods, which occurs while applying the same methods, is in progress Also, the pressure welded joint is a kind of method that heats the ends of reinforced bars locally and joint them, and after the pressure welding, the vulnerable part in the reinforced bar occur. Thus, in the construction field, the throughout quality control is necessary because of the delayed duration and the lowered construct ability. In this study, of the traditional lap splice method and the mechanical splice one, the screw coupler, we tried to look into through experiments the prefabrication method of bar-meshes, a typical joint method usually used for the joint parts for PSC structures applying the reinforced bar with its big diameter, and a newly-developed up-set coupler method. And we also examined the characteristic of tensile.