• Title/Summary/Keyword: 케이블요소

Search Result 236, Processing Time 0.044 seconds

Bonding Stress Analysis of Cable Fairings used in Small Guided Missiles and Strength Tests of Bonding Materials (유도무기 케이블 페어링의 강도 해석 및 접착재 강도 시험)

  • Goo, N.-S.;Yoo, K.-J.;Shin, Y.-S.;Lee, Y.-H.;Cheong, H.-Y.;Kim, B.-H.
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.33 no.6
    • /
    • pp.76-82
    • /
    • 2005
  • Cable fairings of guided missiles are generally used for protection of electric cables under aerodynamic heating and mechanical loading. The stress distributions between a cable fairing and missile main body along a cable fairing are necessary for its design. In this paper, a method for bonding stress and strength analysis of a cable fairing has been investigated and its computer program developed. Tensile and three-point bending tests of generally used bonding materials were also conducted to supply basic material properties for design of cable fairings.

IP-TV와 디지털케이블TV의 유사성 분석

  • Hwang, Bu-Gun;Kim, Yong-Gyu;Kim, Mi-Jeong;Choe, Seong-Jin
    • Broadcasting and Media Magazine
    • /
    • v.12 no.1
    • /
    • pp.24-39
    • /
    • 2007
  • 본 연구에서는 다양하게 정의되고 있는 IP-TV 정의 및 매체 특성을 살펴보고, 이를 통해 IP-TV의 개념을 분명히 하였다. 또한 IP-TV 서비스를 위해 필요한 플랫폼, 네트워크, 콘텐츠 및 IP-TV 성패에 영향을 주는 여러 요소들을 디지털케이블 TV와 비교 분석하였고, 분석 결과 디지털케이블 TV와 IP-TV는 물리적 측면이나 서비스 제공 콘텐츠 측면에서 거의 동일함을 알 수 있었다.

Twinax Cable Modeling for Use in HANbit ACE64 ATM Switching Systems (HANbit ACE64 ATM 교환기 시스템의 Twinax 케이블 모델링)

  • 남상식;박종대
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.24 no.12A
    • /
    • pp.1985-1991
    • /
    • 1999
  • In this paper, complete and general two-port lumped Spice-network model is developed for a lossy transmission line. This model is realized as a Spice subcircuit, by means of standard lumped network elements and mathematical functions. It is used as a component in the time-domain simulation of a high-speed data transmission line such as IMI(Inter Module Interface) data path in HANbit ACE 64 ATM switching system. The only required Spice network elements are resistance and frequency-dependent controlled-voltage sources. Such frequency-dependent sources are realized by utilizing the standard Hspice mathematical functions FREQ, DELAY, and POLY.

  • PDF

Experimental and Numerical Study for Tensioning Air Beam System (텐셔닝 에어빔 시스템(TABS)의 휨실험 및 수치해석)

  • Baek, Ki-Youl;Jung, Mi-Roo;Kim, Jong-Su
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.750-753
    • /
    • 2010
  • 본 논문에서는 텐셔닝 에어빔 시스템(Tensioning Air Beam System: 이하 TABS)의 휨실험 및 수치해석를 통하여 TABS의 성능을 고찰하고자 한다. TABS는 스위스의 엠파(EMPA)에서 Tensairity라는 이름으로 처음 제안되어져, 다수의 연구결과가 발표되었으나 설계에 있어 중요한 변수인 압력, 케이블 장력과 시스템 구조성능의 상관관계가 명확치 않으므로 실제 구조물의 적용에는 정성적, 정량적인 자료가 불충분하다고 할 수 있다. 따라서 텐셔닝 에어빔의 구조성능 파악을 목적으로, 다양한 압력조건과 케이블의 초기장력에 대한 구조실험을 실시하였고, 유한요소법을 이용한 해석결과와 실험값을 비교하여 제안모델의 유효성을 검토하였다.

  • PDF

막.케이블.트러스구조의 범용해석프로그램;McS

  • 김승덕
    • Computational Structural Engineering
    • /
    • v.5 no.3
    • /
    • pp.29-36
    • /
    • 1992
  • 우리의 경제발전과 함께, 막구조 및 케이블구조를 이용한 특수 대공간 구조물이 더욱 더 늘어날 전망이며, 이들 구조물의 구조해석은 일반적인 범용ㅇ 구조해석 프로그램으로는 해석이 불가능하다. 즉, 대부분의 범용 구조해석 프로그램이 초기강성을 가진 구조물을 해석할 수 있는데 반해, 막구조 및 케이블 구조는 초기강성이 매우 약한 구조체이므로, 초기 불안정현상을 나타내고, 따라서 해석이 불가능하게 된다. 이러한 구조적 특징을 가진 막구조 및 케이블구조를 해석하기 위하여, 막 케이블 및 트러스요소로 구성된 복합구조체를 해석할 수 있는 범용 구조해석 프로그램인 McS(Membrane and Cable/Truss Structures)가 개발되었으며, 그 Flow-chart는 표1에서와 같다. McS는 현재, 한국에서는 성균관대학교 자연과학캠퍼스의 VAX-11, 1명진단조공업주식회사의 SUN 워크스테이션에서 작동중이며, 일본에서는 동경대학 생산기술연구소의 M-380 및 T.I.S. & Partners의 IBM 워크스테이션에서 작동중에 있다.

  • PDF

An Analysis of the Long-term Behavior of the Cable System in the Suspension Bridge (현수교 케이블 시스템의 장기거동 분석)

  • Ryu, Duck-Yong;Kim, See-Dong;Jung, Hie-Young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.3 s.55
    • /
    • pp.135-144
    • /
    • 2009
  • The cable system of suspension bridges is a very important non-elastic element which caries an external load by a tension force of the cable, such that creates the integrity of a structure. It is not easy to find if cable system have been changed by the maintenance activities such as repairs or reinforcement. Sometimes the maintenance can cause structural deformations and changes of the tension force in cables. In most cases, the cable stayed bridges are managed by health monitering system, however, the main cable of suspension bridges need to develop more accurate and efficient monitoring system. The Namhee Bridge was constructed 35 years ago and it has been continually repaired and reinforced after then. This study describes the behavior of the cable system by analysing many of inspective reports and by using the results of hanger rope test and for the shape of main cables surveys.

Construction of Roof Structure for Jeju Worldcup Stadium (제주월드컵경기장 지붕구조물의 시공)

  • Lee Ju-Young;Kim Chan-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.174-179
    • /
    • 2002
  • The cable stayed roof structure of Jeju worldcup stadium is erected with correct prestressed force that is required by the structural engineer who designs this structure. This study evaluated and adapted the erection process of cable, the erection force and the measurement of cable force for Jeju worldcup stadium. The process of erection is required not only to calculate election force but also to check structural stability, post process, construction period and using cranes. Considering the site conditions and technical problems, this study can attain successfully the erection of cable stayed roof structure of Jeju worldcup stadium with allowable errors.

  • PDF

3-D Aeroelastic Model Test of a Cable-Stayed Bridge with a Main Span of 1,200m (주경간장 1,200m 사장교의 3차원 풍동실험)

  • Sin, Seung-Hwan;Kim, Yeong-Min;Gwak, Yeong-Hak;Lee, Hak-Eun
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.70-70
    • /
    • 2011
  • 사장교의 적용지간이 증가하여 초장대화하면서 구조안전성을 확보하기 위한 다양한 노력이 시도되고 있다. 본 연구에서는 현재까지 시도된 적이 없는 주경간 1,200m 사장교의 내풍안정성을 검토하기위하여 3차원공탄성 모형을 제작하고 풍동실험을 수행하였다.(그림1 참조) 실험대상 구조물은 내풍안정성 증대를 위해 유선형 박스거더를 채용하고 케이블이 거더와 함께 비틀림에 저항하도록 2면 케이블을 적용하였다. 구조적인 측면에서는 보강형 자중감소를 위해 전경간을 강박스로 계획하였으며 측경간에 부반력제어를 위한 Counter Weight을 적용하였다. 실험대상 구조물은 완성계, 가설계95%, 가설계50%, 가설계45%로 모형을 해체하면서 진행하였고 가설단계 별로 내풍케이블의 수량과 형상을 달리하여 내풍안정성 개선효과를 확인하고자 하였다. 3차원 풍동실험 결과 완성계에서 교량의 안전성에 심각한 문제를 발생시킬 수 있는 와류진동, 플러터, 버페팅과 같은 유해한 진동현상이 발견되지 않았으며, 시공중 내풍안정성 확보를 위하여 대상교량에 내풍케이블을 설치하고 내풍케이블의 수량 및 배치형상에 따른 진동제어 효과를 검토하였다. 본 실험은 현재 풍동실험 요소기술을 이용하여 1,200m급 사장교 풍동실험을 수행하였고 이에 따라 교량이 초장대화 되면서 스케일다운에 따른 보강형질량, 케이블 간격 등 실험모형 제작상 문제점을 확인 할 수 있었으며 이러한 경험을 토대로 향후 1,000m 이상급 초장대 사장교 내풍설계를 위한 기초자료로 활용이 가능할 것으로 사료된다.

  • PDF

EMC Performance Improvement of Distribution Automation Circuit-Breaker by Modified Installing Method of Control Cable (제어케이블의 설치기법 개선에 의한 배전자동화용 개폐기의 EMC 성능 향상)

  • 김언석;김재철
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.17 no.5
    • /
    • pp.60-67
    • /
    • 2003
  • The goal of this paper is to improve EMC performance of circuit breaker. Circuit breaker and control cubicle are interconnected by multi control cable. Also many control cables are laid on each apparatus. These control cables are directly connected by electronic components. So control cables are very important to improve EMC performance of circuit breaker. This paper suggests installing a ground conductor in parallel(PGC) to control cables. Also this paper suggests using shielding cables as secondary cables of voltage transformer in circuit breakers, and grounding both ends of shielding. After applying suggested methods, we verified EMC performance of circuit breaker is improved.

A Study on the Dynamic Behavior of Cable-Stayed Bridge Considering Geometric Nonlinearity of Cables (케이블의 기하학적 비선형성을 고려한 사장교의 동적거동에 관한 연구)

  • Park, Young Suk;Chung, Si Youn;Lee, Myong Woo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.9 no.4
    • /
    • pp.15-25
    • /
    • 1989
  • This paper presents the results of the numerical analysis on the behavior of cable-stayed bridge considering geometric nonlinearity of cables. Finite element method is used and geometric nonlinearities are considered on the analysis of cable-stayed bridge. The governing equilibrium equations are derived by the principle of virtual work, and modified Newton-Raphson method and Newmark-${\beta}$ method are employed in response calculations. The validity of this study is demonstrated by comparing the examples with analytical results by other method and testing results.

  • PDF