• Title/Summary/Keyword: 추진공법

Search Result 112, Processing Time 0.023 seconds

In-Situ Application of the Steel Pipe jacking with Grouting (그라우팅을 병행한 강관추진공법의 현장 적용성 연구)

  • Jung, Min-Hyung;Lim, Ho-Jung;Shin, Chang-Sub;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.1 s.53
    • /
    • pp.152-160
    • /
    • 2009
  • The pipe jacking method which is a non-excavation method is frequently used due to constructability and economical efficiency in a medium or small-sized pipeline construction. However, jacking process of the method still causes problems that the base ground is disturbed and loosen. These lead to surface settlement, strength decrease and leakage of water. Therefore, this study presents in-situ application of the steel pipe jacking with grouting, and it is that jacking and grouting are progressed simultaneously. To verify this, the steel pipe jacking with grouting and the existing steel pipe jacking have been constructed on the same ground condition. It has been proved that the steel pipe jacking with grouting is in-situ applicable according to results of monitoring surface settlement, in-situ density, GPR geophysical prospecting and large scale direct shear test.

A Study on the Application of Roof Panel Shield Method (RPS 공법의 적용성 연구)

  • Kim, Jung-Hyi;Jung, Byung-Chul;Shin, Eun-Chul;Kim, Jong-In
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1585-1592
    • /
    • 2008
  • 산업사회의 발전에 따라 사회 기반시설분야도 복잡다양해지고 특히 도시기능이 활발해지면서 지금의 도심지에는 지하철, 상수도, 하수도, 전력구, 통신구, 지하보차도, 지하상가, 지하주차장 등 여러 가지 용도의 지하공간이 요구되고 있으며, 이러한 지하 구조물을 축조하는데 있어 도로상에 차량 증가로 인한 교통 혼잡이나, 지하매설물의 장애로 인하여 기존의 개착식 공법으로 시행하지 못하고 지하터널공사로 시행하는 경우가 빈번하다. 기존 국내 외 터널공법 관련문헌과 현재 사용되는 터널공법의 실제 시공에 관한 정보를 수집하여 장 단점, 시공시 주의사항, 적용조건등의 조사내용을 바탕으로 RPS 공법을 고안하였다. 소규모 지하구조물을 구축하기 위한 RPS 공법은 출발갱내에서 상부에 파이프 루프를 시공한 후 광폭 유압 패널이 장착된 철제 선도관을 추진시켜 선도관을 원압잭에 의하여 압입한 후 P.C. 콘크리트 구조물을 거치하고 원압으로 압입 추진토록 하였다. 또한, 대규모 지하구조물 축조시에는 구조물 예정상단부에 지반조건에 따라 파이프 루프공법 또는 소구경 Semi-Shield 공법을 이용하여 루프를 시공함으로써 상부의 침하를 방지하고, 측벽은 광폭유압 패널을 이용하여 여굴의 최소화 및 곡선부 시공을 용이하게 하였다.

  • PDF

Case study on design and construction for cross-connection tunnel using large steel pipe thrust method in soil twin shield tunnels underneath airport (공항하부 토사 병설 쉴드터널에서 대구경 강관추진에 의한 횡갱 설계/시공사례 연구)

  • Ahn, Chang-Yoon;Park, Duhee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.5
    • /
    • pp.325-337
    • /
    • 2021
  • On the road and rail tunnels, the evacuation pathway and facilities such as smoke-control and fire suppression system are essential in tunnel fire. In the long twin tunnels, the cross-connection tunnel is usually designed to evacuate from the tunnel where the fire broke out to the other tunnel. In twin shield tunnels, the segment lining has to be demolished to construct the cross-connection tunnel. Considering the modern shield TBM is mostly the closed chamber type, the exposure of underground soil induced by removal of steel segment lining is the most danger construction step in the shield tunnel construction. This case study introduces the excavation method using the thrust of large steel pipe and reviews the measured data after the construction. The large steel pipe thrust method for the cross-connection tunnel can stabilize the excavated face with the two mechanisms. Firstly, the soil in front of excavated face is cylindrically pre-supported by the large steel pipe. Secondly, the excavated face is supported by the plugging effect caused by the soil pressed into the steel pipe. It was reviewed that the large steel pipe thrust method in the cross-connection tunnel is enough to secure the construct ability and stability in soil from the measurement results about the deformation and stress of steel pipe.

The Effects of a Launching Nose on Main Girder Erected by Incremental Launching Method (압출공법에 의한 가설시 추진코가 주형에 미치는 영향)

  • Oh, Kwi Hwan;Kim, Chul Young;Park, Young Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.12 no.4
    • /
    • pp.1-10
    • /
    • 1992
  • Since the structural system of a prestressed concrete bridge erected by Incremental Launching Method is varying continuosly during construction, the main girder bears alternating stress resultants different from those under a service load condition. The magnitude of these stress resultants depends on span lengths, nose length and stiffness ratios between girder and nose. A parametric study is performed for various span lengths, nose lengths and stiffness ratios. In order to analyze structural systems varying at every launching step two programs are developed; a pre-processor which automatically produces a data file for each stage and a main-processor which can summarize the results of all stages. From the results, the relationships between optimum nose length and stiffness ratio are proposed for various span lengths.

  • PDF

암반 내 쉴드터널의 영향해석과 시공

  • Tetsushi, Sonoda
    • Tunnel and Underground Space
    • /
    • v.10 no.3
    • /
    • pp.271-277
    • /
    • 2000
  • 쉴드터널 공법은 도시의 지하철도, 상ㆍ하수도, 전기ㆍ통신 등을 설치하기 위한 터널 건설 수단으로 활용되고 있다. 일본은 1960년경부터 도시의 근대화를 추진하면서 infrastructure를 정비하였으며 이에 따라 쉴드터널 공법의 적용이 급속히 증대하였다. 도시의 지하에 터널을 건설함에 있어 가장 중요한 것은 기존 도시구조물에 대한 영향을 최소로 줄여서 도시기능을 보전하는데 있다.(중략)

  • PDF

Analysis of Heaving and Settlement Test of Scale Model Depending on Shape of the Pipe during Pipe Roof Excavation (비개착 추진공법에서 관의 형태에 따른 축소모형 융기 및 침하 실험분석)

  • Eum, Ki-Young;Choi, Chan-Yong;Cheon, Jeong-Yeon
    • Journal of the Korean Geosynthetics Society
    • /
    • v.9 no.4
    • /
    • pp.9-15
    • /
    • 2010
  • In this study, a non-open cut method using a round or square pipe which has been commonly employed in Korea was experimentally evaluated and the behavioral features resulting from the friction while the pipe is penetrated into the ground was identified through the scale model test. To that end, a test device was fabricated by type of penetration pipe, by which the surface displacement caused by surrounding friction resistance was monitored. To simulate the settlement and heaving by excavation stage, the test was conducted based on generalized friction condition and surface displacement and the result therof was compared and analyzed, considering the type of penetration pipe.

  • PDF