The Corresponding Plan for Integrated Environment-the Lowest Cost Bid and The Current Cost Estimate System (최저가입찰제 및 실적공사비적산 환경에서의 대응방안)

  • Kim, Byeong Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.849-859
    • /
    • 2006
  • Earnings of domestic enterprises are expected a serious damage because the lowest cost bid system and the current cost estimate system. In 2005 average successful bid rate for the lowest cost bid project is below 60%, this is not reach at the operating budget of enterprise. Many problems such as illegal construction, low price subcontract, chain enterprise loss com in to practice because of low successful bid rate. In addition earnings of the enterprises expected to be the minimum, because of enlarge execution of the current cost estimate system. This study tries to lend assistance by giving alternative for the construction enterprise by presenting the bid system, investigate and compare foreign system with domestic and analyze correlation of the lowest cost bid and the current cost estimate system.

법령과 고시 - 분리발주 허용 대상 구체화, 발주기관 재량권 대폭 인정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.281
    • /
    • pp.45-50
    • /
    • 2013
  • 기획재정부는 공사의 분할 분리발주 관련규정 등을 정비하고 최저가낙찰제 확대유예 등의 내용을 담은 국가계약법 시행령 개정안을 지난 11월 8일 입법예고 했다. 이 법안은 20일 동안 업계 의견을 수렴한 후 법령안 심사 및 차관 국무회의 등을 거쳐 공포될 예정이다. 이번 국가계약법 시행령 개정안은 그동안 대한설비건설협회가 전사적으로 추진해 온 분리발주 법제화와 최저가낙찰제 연기 방안을 담고 있어 건설업계의 관심이 집중되고 있다. 분할 분리발주 규정은 분리발주가 보다 활성화 될 수 있도록 대상을 구체화했으며, 사업의 계획단계부터 분리발주 가능 여부를 판단토록 개선됐다. 또한 300억 이상에서 100억 이상으로 확대될 예정이던 최저가낙찰제 확대 방안은 오는 2015년까지 2년간 유예되고 최저가낙찰제 대체 방안으로 종합심사제가 제안되는 등 정부의 입 낙찰제도 개선 방향의 가닥이 잡혔다.

  • PDF

Identifying Factors Causing Bid-dropping in Domestic Public Work Projects and Ways of Ending Its Decline (국내 공공공사 낙찰률 하락의 원인 분석 및 개선 방향)

  • Lee, Bok-Nam;Lee, Young-Hwan;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.102-109
    • /
    • 2005
  • The contract price of successful bidders in domestic public work projects has dropped significantly under lowest bidding process. Furthermore, compared to the U.S. and Japan, the bids are substantially lower. The increasing trend for domestic construction companies to bid projects without considering markup or expected profit, with the purpose of gaining experience for future similar work, has contributed to the overall dumping in bid prices. The government has implemented controls in hopes of reducing the price dropping trend but these have yet to work in the market. This study determines the level of significance of the contract price of the successful bidder in domestic public works projects and identifies factors that cause bid-dropping by comparing to those of the US and Japan. By mirroring advance countries' rules and regulations to prevent an abnormally low bidder, recommendation are provided to keep unrealistically low bidders from winning the work.

Analysis on Procurement Auction System in Public Procurement Service (공공투자사업의 입·낙찰 분석)

  • Kim, Jungwook
    • KDI Journal of Economic Policy
    • /
    • v.32 no.2
    • /
    • pp.144-170
    • /
    • 2010
  • This paper considers the effect of various types of procurement auction system on competition focusing on the rate of successful bidding. We analyze the number of bidders and the rate of successful bids using online procurement data of the Public Procurement Service. The average number of bidders is 301 and the average rate of successful bids is 87.42% while the weighted average rate is 75.13%. These numbers show that there is quite strong competition among bidders and the rate is lower as the expected price is higher. When we analyze the data of price procurement auction, the rate is also shown to be lower as the expected price is higher. Furthermore, the rate decreases as the number of bidders increases which naturally makes the competition stronger. Meanwhile, the analysis finds that the inclusion of the onsite bidding, the PQ(Pre-Qualification) result, or major-10 winning companies cannot explain the rate much in our data. In case of turnkey-alternative, the average rate of successful bidding for 484 cases record 90.20%. The average is 84.89% with 120 alternatives and 91.97% with 364 cases of turnkey. The reason why the rate of turnkey-alternative is lower than that of price procurement auction is the lack of competition as well as the systematic difference. By setting up a model, we are able to explain the difference in rate caused by the respective reason. When we suppose there are 3 bidders in case of price procurement auction for a project that exceeds 100 billion won, the rate is expected to be around 64%. This implies that difference of 26% is caused by the systemic difference and 3% by the lack of competition. Therefore, we conclude that the difference in rate between turnkey-alternative and price procurement auction is caused mainly by the systemic difference. In case of PPP(Public Private Partnership) projects, among 154 projects in total, only 40% has more than 2 bidders that compete. The average number of bidders is 1.88 which is less than 2, and the average rate of successful bids is 90%. In sum, under the price procurement auction, there is strong competition which is reflected by the rate of successful bids. However, there is room to decrease the rate by strengthening the competition under the turnkey-alternative. Also with PPP projects, we expect the rate can be steadily reduced with revived competition among bidders.

  • PDF

A Benchmarking Study on Engineering Project Delivery System - A Case Study FIDIC & U.S. Governmental Regulation - (엔지니어링 입·낙찰제도 해외사례 벤치마킹 연구 - FIDIC과 미국 제도를 중심으로 -)

  • Kim, Sang Bum;Kim, Jae Wook;Lee, Jung Dae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.2D
    • /
    • pp.249-258
    • /
    • 2008
  • Korean engineering firms need to improve their performance in order to stay competitive in the globalize environments which has been led by some international movements including World Trade Organization (WTO) and Free Trade Agreements (FTA). There have been various activities and researches focusing on how to improve competitiveness of Korean engineering firms and the out-of-fashion Engineering Project Delivery System (EPDS) has repetitively identified as one of main barriers to deter advancements of Korean engineering industry. Therefore, this research attempted to investigate global standards of EPDS such as International Federation of Consulting Engineers (FIDIC), American Federal Acquisition Regulations (FAR), Brooks Act, and so on. The procedures of international EPDSs along with a few case studies were comprehensively analyzed and compared with Korean EPDS in order to propose recommendations of improving Korean EPDS. Some major differences between international and Korean EPDS were identified and they includes emphasis on qualifications of engineers and/or firms rather than their proposed cost, extensive use of long and short-list, common use of negotiation process, etc. Research findings are envisioned to guide the Korean public engineering sector to innovate Korean EPDS.

정부시설공사입찰제도 - 50억미만 전문공사 적격심사제도를 중심으로

  • Kim, Il
    • 월간 기계설비
    • /
    • no.4 s.189
    • /
    • pp.39-42
    • /
    • 2006
  • 최근 정부계약제도는 하루가 다르게 변해가고 있습니다. 행정자치부에서는 지방정부출범 10년 맞이하여 지방자치단체의 특수성과 성격을 반영한 「지방자치단체를 위한 계약에 관한 법률」을 제정하여 올해부터 본격적인 시행에 들어갔으며, 국가계약제도 역시 정부가 추진하는 건설산업 경쟁력 강화 및 선진화 사업과 맞물려 최저가낙찰제도 확대, PQ 및 적격심사 제도의 개편, 각종 계약관련 하위 규정 통폐합 등 계약 및 입 · 낙찰제도 전반에 걸친 개편작업이 추진되고 있습니다. 본지는 이러한 정부계약제도의 급격한 변화의 흐름과 발맞추어 평소 회원사들로부터 자주 질의를 받았던 내용을 중심으로 정부시설공사입찰실무에(전문공사 50억 미만 적격심사 중심) 대한 내용을 3회에 걸쳐 게재 할 예정이오니 업무에 많은 활용 있으시기 바랍니다.

  • PDF

정부시설공사입찰제도 ② - 50억미만 전문공사 적격심사제도를 중심으로 -

  • Kim, Il
    • 월간 기계설비
    • /
    • no.3 s.188
    • /
    • pp.52-61
    • /
    • 2006
  • 최근 정부계약제도는 하루가 다르게 변해가고 있습니다. 행정자치부에서는 지방정부출범 10년을 맞이하여 지방자치단체의 특수성과 성격을 반영한『지방자치단체를 위한 계약에 관한 법률』을 제정하여 올해부터 본격적인 시행에 들어갔으며, 국가계약제도 역시 정부가 추진하는 건설산업 경쟁력 강화 및 선진화 사업과 맞물려 최저가낙찰제도 확대, PQ 및 적격심사 제도의 개편, 각종 계약관련 하위 규정 통폐합 등 계약 및 입∙낙찰제도 전반에 걸친 개편작업이 추진되고 있습니다. 본지는 이러한 정부계약제도의 급격한 변화의 흐름과 발맞추어 평소 회원사들로부터 자주 질의를 받았던 내용을 중심으로 정부시설공사입찰실무에(전문공사 50억 미만 적격심사 중심) 대한 내용을 3회에 걸쳐 게재 할 예정이오니 업무에 많은 활용 있으시기 바랍니다.

  • PDF

A Study on the Bidder Evaluation System Using the Technology Proposal-Based Best Value System (기술제안입찰형 최고가치 낙찰제도 입찰자 평가체계에 관한 연구)

  • Yeo, Sang-Ku;Lee, Hyun-Chul;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.124-136
    • /
    • 2010
  • International construction market has been depressed significantly after 2000. Exclusive techniques and advanced construction management methods are desperately in demand so as to ensure the competitiveness in unlimited competition. Although public construction delivery system has been revised several times starting with introduction of the lowest bidding system in 1951, there has been no remarkable achievement whenever new system was introduced. This study analyzed the successful stories of developed countries like Europe, USA and Japan to settle successful rating system down and vitalize the best value system in Korea, which was introduced in October 2007. We constructed the bidder evaluation system for domestic situation, and designed the evaluation tool which is useful in utilization. Since this study were analyzed on only same systems of developed countries and domestic similar cases, this study is limited to typical construction in Korea. The study of specialized rating system in the field related should be followed.

Evaluation on the impact of Lowest Bid Contracts on Site Operations in times of Severe Economic Downturn (건설경기 침체기의 최저가 낙찰제 건설현장의 운영 실태분석과 개선 방안 도출)

  • Koo, Bon-Sang;Jang, Hyoun-Seung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.146-153
    • /
    • 2009
  • The year 2008 was a hard year for Korea's construction companies. The real estate downturn resulted in halting new construction and stopping existing work, and inflation of global oil prices caused price hikes in rebar and concrete materials. As a solution to reducing the budget, the newly appointed government announced plans to increase low cost bid contracts from 10 billion to 30 billion won. When such economical and political factors negatively impact the construction market, projects based on low cost contracts are the hardest hit. Many problems already inherent in low cost bid contracts become accentuated. Consequently, this provides an opportune time to actually study and analyze the issues in these projects. This paper introduces the findings made from investigating four projects struggling to make ends meet in the year 2008. Results show that flow of cash (i.e., liquidity), or lack thereof, was the root cause which in turn was hampered by failed mechanisms for design changes, material inflation. Attributing cash flow risk to the bottom of the production structure (i.e., small business subcontractors) was also a problem within the industry. Contractors need a better way to prepare against material price fluctuations, and owners need to assist in expediting payment during times of extreme downturn.

건설.중소기업 관련 분야별 제도, 올해부터 이렇게 달라진다

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.258
    • /
    • pp.74-77
    • /
    • 2012
  • 올해부터, 국토해양부 장관이 고시하는 최저가낙찰제 대상공사에 대하여 포괄대금지급보증제도가 시행되며, 건설근로자 노무비 구분관리 및 지급 확인제가 추진된다. 또한 근로계약 체결시 근로조건 일반사항이 명시된 서면을 근로자에게 반드시 교부해야 하며, 장애인 고용부담이 강화된다. 본지는 올해부터 달라지는 건설 중소기업 관련 개편 시행되는 각종 제도를 소개한다.