• Title/Summary/Keyword: 최저가입찰

Search Result 24, Processing Time 0.022 seconds

Analysis of Construction Company's Bidding Practice under the Lowest Bidding System (최저가낙찰제하에서의 건설업체의 투찰 형태 분석)

  • Lee, Hyungwoo;Chang, Chul-Ki;Kim, Yong-Su
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.6D
    • /
    • pp.975-983
    • /
    • 2006
  • This study analyzed bidding data for construction projects ordered by the Public Procurement Service under the lowest bidding system since 2001 by using statistical technique in terms of construction types, company sizes, bidding prices. This study brings out construction company's bidding practices and problems caused by the current lowest bidding system and suggests the way to mitigate the problems and to improve the lowest bidding system. The analysis shows the problem of winning a bid in abnormally low price under the lowest bidding system, feared at the start, was realized. As bidding practice has polarized with low and high price, the analysis shows that the lowest bid system's market has a high possibility to be distorted by construction companies' bid strategies. To complement the lowest bidding system's problem, the analysis shows that introduction of the bidding system using particulars where bidders estimate construction quantities and unit prices by themselves is needed.

A Study of Process Model for Estimating Optimal Bidding Rate in the Lowest Bidding System (최저가낙찰제도의 적정 낙찰가율 산정을 위한 프로세스 모형 연구)

  • Ahn, TaeHyoun;Seo, HwaJin;Choi, GwangYeol;Kang, LeenSeok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5D
    • /
    • pp.719-726
    • /
    • 2011
  • The government intensifies screening criteria for the guarantee of reasonable bidding price and the prevention of low bidding price, however, the low tender rate still becomes an issue. This study analyzed the problems of screening criteria for the guarantee of reasonable bidding price, and then derived some major issues such as the restriction of decisive factors for initial construction cost, the rate of activities over five percent of surveyed price and the restrictive review criteria of inadequate activities. To solve thess problems, this study suggests an improved process model for estimating optimal bidding rate that can select a contractor with the guarantee of reasonable bidding price.

Application of Modifiable Bid of BOQ in Garak Market Modernization Project Phase 1 (가락시장현대화사업 1단계 물량내역수정입찰 적용 사례)

  • Cho, Kyung-Je;Kim, Hyung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.111-112
    • /
    • 2015
  • Garak Market Modernization Project Phase 1, which is the public projects worth 1,75 billion won, was delivered by adopting modifiable bid of BOQ on the lowest price award system. The modifiable bid of BOQ system allows bidders to modify quantities based on their own drawings and construction specifications and requirements. It was initiated by the government for minimizing design error and for inducing technical competition between tenders by checking errors. At that time the bidding, it allowed modifying the BOQ all the works. In the construction phase, the responsibility for the design changes, due to mistakes and omissions on design documents and BOQ were disputed between the owner and the contractors. This study analyzed the problem of the system and addressed a need of improvement.

  • PDF

2004 건설정책$\cdot$제도 무엇이 어떻게 바뀌나 - 실적공사비적산제$\cdot$최저가낙찰제 및 저기심의제, 민자유치제도 등의 변화가 핵심 -

  • 이상호
    • 주택과사람들
    • /
    • s.164
    • /
    • pp.30-32
    • /
    • 2004
  • 2004년도 건설 정책 및 제도 변화의 핵심이슈는 공사 원가 산정 제도 개편, 최저가 낙찰제 확대와 관련 제도 변화, 민자유치제도 개선, 턴키/대압 입찰제도 개선, 건설 업역 규제개선, 부정/부패 척결, 지방 분권과 지자체 조달 권한 확대 추진, DDA/FTA 타결에 대비한 제도 정비 등으로 요약해볼 수 있다.

  • PDF

Analysis on Procurement Auction System in Public Procurement Service (공공투자사업의 입·낙찰 분석)

  • Kim, Jungwook
    • KDI Journal of Economic Policy
    • /
    • v.32 no.2
    • /
    • pp.144-170
    • /
    • 2010
  • This paper considers the effect of various types of procurement auction system on competition focusing on the rate of successful bidding. We analyze the number of bidders and the rate of successful bids using online procurement data of the Public Procurement Service. The average number of bidders is 301 and the average rate of successful bids is 87.42% while the weighted average rate is 75.13%. These numbers show that there is quite strong competition among bidders and the rate is lower as the expected price is higher. When we analyze the data of price procurement auction, the rate is also shown to be lower as the expected price is higher. Furthermore, the rate decreases as the number of bidders increases which naturally makes the competition stronger. Meanwhile, the analysis finds that the inclusion of the onsite bidding, the PQ(Pre-Qualification) result, or major-10 winning companies cannot explain the rate much in our data. In case of turnkey-alternative, the average rate of successful bidding for 484 cases record 90.20%. The average is 84.89% with 120 alternatives and 91.97% with 364 cases of turnkey. The reason why the rate of turnkey-alternative is lower than that of price procurement auction is the lack of competition as well as the systematic difference. By setting up a model, we are able to explain the difference in rate caused by the respective reason. When we suppose there are 3 bidders in case of price procurement auction for a project that exceeds 100 billion won, the rate is expected to be around 64%. This implies that difference of 26% is caused by the systemic difference and 3% by the lack of competition. Therefore, we conclude that the difference in rate between turnkey-alternative and price procurement auction is caused mainly by the systemic difference. In case of PPP(Public Private Partnership) projects, among 154 projects in total, only 40% has more than 2 bidders that compete. The average number of bidders is 1.88 which is less than 2, and the average rate of successful bids is 90%. In sum, under the price procurement auction, there is strong competition which is reflected by the rate of successful bids. However, there is room to decrease the rate by strengthening the competition under the turnkey-alternative. Also with PPP projects, we expect the rate can be steadily reduced with revived competition among bidders.

  • PDF

법령과 고시 ②-국가를 당사자로 하는 계약에 관한 법률 시행령 개정

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.7 s.192
    • /
    • pp.35-38
    • /
    • 2006
  • 국가를 당사자로하는 계약에 관한 법률 시행령∙시행규칙 및 회계예규가 일부 개정되었다. 이번에 개정된 주요 내용은 입찰참가자격 사전심사 대상의 확대 및 의무화, 최저가낙찰제 대상공사의 확대, 건설재해 및 제재처분 사항 관련 신인도 평가제도 개선(본지 법령과 고시① 참조), 공사의 현장설명제의 보완, 계약이행보증방법의 변경제도 도입, 부정당업자의 입찰참가자격 제한 범위 확대, 입찰방법 심의기구의 일원화 등이다. 본지는 국가계약법 시행령∙시행규칙 및 회계예규의 주요 개정 내용을 게재한다.

  • PDF

A product auction site that utilizes information on the appropriate price of a product (제품의 적정가격에 대한 정보를 활용한 제품 경매사이트)

  • Jang, Eun-Gyeom;Kim, Hyeon-Hee;LEE, Ki-Ra;Seo, Dong-Kwon
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2022.07a
    • /
    • pp.445-446
    • /
    • 2022
  • 본 논문은 시세정보를 활용한 적정한 가격으로 경매를 할 수 있는 전자상거래를 연구하였다. 일반적인 전자상거래는 물건의 적정한 가격 정보 없이 등록 및 구매가 진행된다. 하지만 본 연구는 시세 조회를 이용한 가격 비교를 통해 거래가 적합한 금액에 이루어지는지 확인할 수 있도록 가격정보를 제공한다. 경매 시스템은 일반적인 경매방식인 최저가에서 시작해 점점 가격을 올려 최후의 구매자에게 판매하는 영국식 경매와 가장 높은 금액을 제시한 순서대로 구매자들의 순위가 정해지며 1순위가 2순위의 금액에 입찰 단위 금액을 포함해 구매하는 비딩 경매를 함께 사용한다. 또한, 시간이 부족하거나 경매가 어려운 사용자들을 위해 자신이 지불할 수 있는 최고가를 설정하면 시스템이 스스로 입찰을 해주는 예약 입찰을 추가해 사용자들에게 편리함을 제공한다.

  • PDF

An Equilibrium Analysis of the Constrained Mean-Price Sealed Bid Auction (제한적 평균가낙찰제 경매방식의 균형분석)

  • Seo, Yong-Mo;Rhee, Byungchae
    • Journal of the Korea Convergence Society
    • /
    • v.10 no.1
    • /
    • pp.205-214
    • /
    • 2019
  • In Korea, the first-price sealed bid auction and the constrained mean-price sealed bid auction(buchal-je in Korean) have been used alternatively as procurement auctions. In this paper, we characterize the constrained mean-price sealed bid auction in the context of mechanism design. We consider the general ?-bidder case in which each bidder has private information. Under the assumptions of uniformly distributed valuations and linear strategies, we derive the equilibrium of the constrained mean-price sealed bid auction. Furthermore, we analyze the efficiency and the expected revenue of this auction mechanism in comparison with the first-price sealed bid auction. Finally, we conclude with the critical remarks on the practical intention of the government which uses this auction.

건설정책 - 건설업 기업환경 개선대책 마련 -건설산업 경쟁력 제고 및 민간투자환경 개선을 위한 4대 분야, 17개 과제 선정-

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.242
    • /
    • pp.22-28
    • /
    • 2010
  • 정부는 지난 8월 11일 건설분야 기업환경 개선대책을 확정 발표했다. 정부가 발표한 '건설업 기업환경 개선대책'에 따르면 앞으로 최저가낙찰제 공사의 덤핑입찰을 차단하기 위해 노무비와 품질 안전 환경 등의 공종에 대한 저가심의가 한층 강화되고, 하도급대금 지급 확인제도를 모든 공사에 확대 적용하며, 주 계약자 공동도급제도도 개선한다. 또한 중소 지역업체의 경영환경 개선을 위해 건설공사 도급하한액을 상향 조정하고 입찰참가자격 사전심사 시 지역업체 시공참여 배점제를 도입한다.

  • PDF

법령과고시 - 정부시설공사 계약예규 개정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.262
    • /
    • pp.48-52
    • /
    • 2012
  • 기획재정부와 행정안전부는 계약 예규를 개정하고 지난 4월 2일부터 시행에 들어갔다. 기획재정부는 이번 계약예규 개정을 통해 등록기간 3년 미만 업체가 공동수급제에 참여할 경우 만점기준을 완화했고, 1억 이상 3억 미만 전문공사의 경우 만점기준이 발주금액에 대한 '3년 실적의 1/2배 이상'에서 '평가면제'로, 3억 이상 50억 미만 전문공사의 경우 '3년 실적의 2배 이상'에서 '1/2배 이상'으로 평가방법을 완화했다. 또한 발주기관에서 공공공사 예정가격을 산정할 경우 반드시 최신 표준품셈을 사용하도록 의무화했으며, 적정 노무비 보장 심사 강화 방안으로, 최저가낙찰제 공사에서 업체가 제출한 노무비가 발주기관에서 산정한 노무비의 80% 미만일 경우 탈락된다. 기획재정부는 이번 개정으로 시공경험이 부족하지만 기술력 등이 우수한 신설 중소 업체가 공공공사에 참여할 수 있는 기회가 늘어날 것으로 기대하고 있으며, 최저가낙찰 시 과다한 노무비 삭감 등으로 인한 건설 근로자 소득감소 및 내국인 건설업 기피 등을 막을 수 있을 것으로 기대하고 있다. 한편 행정안전부는 이번 계약예규 개정을 통해 지방자치단체 입찰 및 계약관련 예규를 현행 11개에서 2개로 통합했고, 지자체가 발주하는 50억원 이상~100억원 미만의 공사의 경우 참가자격 적격심사 항목 중 자산회전율 평가를 삭제했으며, 신용평가 등급을 완화해 지방 중소기업들의 입찰 참가 기회를 확대하기로 했다.

  • PDF