Impacts of Contract types on Construction Project Performance - Cost Reimbursable and Lump Sum - (계약방식에 따른 건설프로젝트 성과의 비교분석 연구 - 실비정산방식과 총액계약방식을 중심으로 -)

  • Lee, Yoo-Seob;Hwang, Bon-Gang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.155-163
    • /
    • 2007
  • Multiple parties-owners, engineering and construction contractors, and suppliers involve the delivery process of capital facility projects in the construction industry, and each party obtains or provides their workforce, material, equipment, or service tied into specific contracts. Considering that construction projects are based on the contracted relationship between the parties and that contract types are one of the significant factors determining project success. it is critical for project stakeholder to select appropriate contract types for successful deliveries of projects. With these considerations, this paper assesses impacts of different contract types on project cost, schedule, safety, change, or rework. Analyzing data from real construction projects, the differences in project performance between two contract types, Cost Reimbursable and Lump Sum are measured and statistically tested to investigate if the differences are significant. For this analysis, performance metrics developed by Benchmarking and Metrics program, the Construction Industry Institute are used.

해외건설공사 수행절차(9) - Converted Lump Sum Turnkey 계약방식

  • 해외건설협회
    • 월간 기계설비
    • /
    • s.223
    • /
    • pp.75-78
    • /
    • 2009
  • 전통적으로 주요 EPC(설계, 구매, 시공) 공사는 최초의 엔지니어링 작업(FEED : Front End Engineering Design)을 한 후, 경쟁입찰을 하여 총액계약(Lamp Sum)으로 공사를 수행했다. 최근에 EPC시공자의 위험부담을 줄이는 한편, 발주자는 경쟁적인 시공자를 확보할 수 있는 기회를 확대하면서 협상기간을 단축하교 조기착공을 위해, Lump Sum 가격을 늦게 결정하는 방법을 고려한다. CLST(Converted Lump Sum Turnkey)계약방식은 최초의 엔지니어링 작업을 한 후 경쟁입찰을 통해 1차 계약을 맺고(설계 및 특별 자재 공급에 대한) 공사를 수행하다 설계가 충분히 진행되고 핵심자재에 대한 견적이 입수되어 발주 가능한 시점 및 하도급사를 선정할 준비가 된 시점에서 1차 계약을 변경해 2차 계약을 맺는다. 2차 계약 시 1차 시 맺은 계약조건(직접공사비, 일반관리비 및 이윤, 최대한도 금액이 포함됨)을 기준으로 하되, 발주자가 Open Book 형식으로 공사비를 평가하고 재협상하여 Lump Sum 금액으로 전환해 합의한다. 이후 Lump Sum Tumkey 계약과 동일한 형식으로 공사를 수행한다.

  • PDF

A Performance Analysis of Risk Management for International Engineering Project (해외 엔지니어링 사업의 리스크관리 성과분석)

  • Jung, Wooyong;Lee, Baul;Han, Seungheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.99-107
    • /
    • 2017
  • In recent years, Korean engineering companies are actively entering into the international business. Although international engineering project is known to have lower risk rather that EPC construction project, Korean engineering companies' international sales profit is not as good. Therefore, this study analyzes the risks that are predicted before bid and actually occurred after award. In addition, this study shows the difference of risk depending on lump sum contract and cost reimburse contract. Finally, this study analyzes the difference of risk according to civil engineering and building engineering. This study provides industry to analyze risk more practically and helps academics to focus on risk to be studied more in the future.

Seeking Alternative Models and Research Trends for Big Deals in the Electronic Journal Consortium (전자저널 빅딜 계약의 연구 동향과 대안 탐색)

  • Kim, Sang-Jun;Kim, Jeong-Hwan
    • Journal of Information Management
    • /
    • v.42 no.1
    • /
    • pp.85-111
    • /
    • 2011
  • The purpose of this study was to seek a workable alternative to replace a big deal related to the journal budget for the maintenance of academic libraries with the largest issue on the E-journal consortium. The contents of this study was to present it. It had examined the current situation, strengths, weaknesses and corresponding to replace the big deal contract. After reviewing the literature, we looked into the alternative activities for the big deal such as open access-based, usage-based, consortium improvement-based, publishers lead, and other models. As a result, the 'consortium cost reapportion model' was an alternative for the KESLI. The alternative was in the short term for cost division format, but long-term oriented for a consortium single(bloc) payment type or national licence model. The model was based on the data from the last year. It had evaluated download the PDF and HTML documents, but the three times weighting more than others, and the rest of 14 factors of 0.5 to 5 out of 100 total score. The total amount negotiated by national units 10, 20 and 30 grades for the final step was allocated to the participating library on the KESLI consortium.