• Title/Summary/Keyword: 초고층 건설공사

Search Result 73, Processing Time 0.018 seconds

Extraction and Analysis of Construction Phase Risk Factors in High-rise Construction Project (초고층 건설공사 시공단계 리스크 요인 도출 및 분석)

  • Kim, Sooyong;Kim, Sunghyun;Yang, Jinkook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.90-98
    • /
    • 2016
  • High-rise buildings construction project have various risk factors. Major risk factors are negative results such as time delay and increase of costs. Therefore, this study was analyzed risk factors in construction stages of high-rise buildings using by PROMETHEE technique. For this, this research were identified risk factors through experts Focus Group Interview(FGI). And, PROMETHEE was used to setup evaluation standard for analysis of high-rise building construction risks. Next, the standard of evaluation index calculation was composed by using the definition level in PDRI. Preference function and evaluation index were identified through questionnaires. Through these processes, this study has calculated the importance of high-rise building construction risks using by PROMETHEE technique. As a result, high degree risk factors were as following. These are 'Operation plan of material lifting', 'Outrigger & Belt Truss Construction', 'Foundation work plan of high-rise building' and 'Considering a Structure concept of high-rise building'.

A Study on Analysis and Improvement of the Process of Furniture Work for High-rise Residential Building (초고층주거건축의 가구공사 프로세스 분석 및 개선방안에 관한 연구)

  • Kim Hyun-Woo;Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.446-449
    • /
    • 2003
  • Recently, large residental buildings including high-rise apartment and a multi-business and commercial-residential building are appearing in the form of Korean construction work. According to this large-size trend a tenn and cost of construction works was largely increased. Therefore, studies of techniques construction management for successful project are lively being progressed. This study introduced Just-In-Time form and Lean Construction concept in order to establish management system of a house construction work taking up much portion on aspects of work scale and materials transportation in finishing works of high-rise residental building architecture. The process of house construction works will be analyzed with these two principles for productivity improvement and then the improvement plan will be suggested. This analysis and proposal can induce the flow of finishing works smoothly and contribute to success of project through saving of a tenn and cost of construction works.

  • PDF

An Algorithm for Hoisting Time Calculation in Super-tall Building Construction (건설 리프트 가감속 능력을 고려한 양중시간 산정 알고리즘 개발)

  • Cho, Chang-Yeon;Shin, Yoon-Seok;Won, Seo-Kyung;Kim, Jung-Yeol;Cho, Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.120-129
    • /
    • 2011
  • An installation of the construction lift has a few limitations by many constrains and these have influences on labor productivity, that can be changed by vertical-transportation management. In the super-tall building construction, a management of construction lift operation is one of the most important factor, but existing methodologies depend on skilled practitioners' experiences. And it is true that the expertise resulted by the experiences does not transfer to the next generation. This study is a part of lifting-management simulation development which aims at the optimal construction lift management. A proposed algorithm is focus on lifting time calculation considering an acceleration capability. This research evaluates the result accuracy using comparative analysis on simulation result and field measuring time.

Development of Space-Model Based on Site Images for Improving Preparation Process of Interior Construction in High-rise Buildings (초고층 마감공사 준비작업 개선을 위한 현장사진기반 공간모델 개발)

  • Hwang, Joon-Young;Kim, Seung-Hyun;Jung, Hyun-Cho;Kim, Hae-Gon;Park, Sung-Ho;Koo, Kyo-Jin;Hong, Tae-Hoon;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.90-98
    • /
    • 2008
  • The technical improvement of high-rise building construction is getting better as the demands of the skyscrapers is increasing. The interior construction has become the essential factor which directly affects the whole project because of skyscraperization. This study has proposed the site image-based space model as the tool for supporting decision-making for preparation and execution of the interior construction. It is expected to make the space model which is suitable for the project characteristics and work packages.

An Analysis of Application by Formwork in Concrete Structural Frame Work for Tall Building in Korea (국내 초고층 골조공사의 거푸집벽 적용성 분석)

  • Kim, Tae-Hoon;Jin, Il-Guan;Shin, Yoon-Seok;Cho, Seong-Soo;Kang, Kyung-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.387-391
    • /
    • 2007
  • A proper selection of formwork greatly affects project success in tall building construction. The tall building construction, however, has not been selected properly using the characteristics by formwork and demands the comprehensive consideration of cost, duration, quality, safety, and environment. Therefore, this study compares and analyzes the application by formwork of five aspects. In order to perform an analysis, the questionnaire was performed to research the priority order of management as determining formwork and application by formwork of tall building construction engineers. This study is expected to help reasonable selection of formwork.

  • PDF

Algorithm Development for Effective Material Management in High-Rise Building Constructions (알고리즘 개발 연구방법론 기초연구 - 초고층 공사에서의 물류효율화를 위한 장비간 통신 방법 모델설정을 중심으로)

  • Cho, Chang-Yeon;Kwon, Soon-Wook;You, Seuk-Joon;Lee, Joo-Hyung
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.230-233
    • /
    • 2009
  • 3D(Difficult, Dirty, Dangerous) 산업의 대표적인 산업으로 인식되는 건설업은 현재 노무기능인력의 고령화와 신규 기능인력 육성의 어려움이라는 문제에 당면하였으며, 이러한 3D 산업이라는 이미지의 탈피 및 노동집약적 사업구조에 대한 변화에 대한 대안으로써 타산업과의 융복합을 통한 이미지 쇄신 및 생산성 향상을 위해 자동화 및 정보화를 위한 노력을 경주하고 있다. 본 연구에서는 건설 자동화 및 정보화를 위한 알고리즘 개발 연구방법론에 대한 기초연구로써, 초고층 공사에서의 물류 효율화를 위한 장비간 통신방법에 대한 모델을 설정하고, 해당 모델에 대해 적용 가능한 알고리즘을 도출하는 프로세스를 규명함으로써, 건설 자동화 및 정보화 연구를 진행하는 단계에서 최적화(Optimization)를 위한 알고리즘 규명에 대한 방안을 제시하고자 한다.

  • PDF

A Analysis and Improvement of Manpower Management For Finish Work in High-Rise Housing Projects (초고층 주상복합 건물 마감공사 출역인력관리 현황분석 및 개선방안)

  • Won, Kyeong-Suk;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.600-603
    • /
    • 2004
  • Recently, Housing projects in the center of the Metropolis are getting higher, larger, more complex gradually, the resources are increasing greatly. Especially, the right manpower in the right place could quite important factor because the construction cites are wide and many subcontractors and labors throw into finish works in High-rise Housing projects. Differing from apartment building projects. it is only four or five years that high rise building projects are started so, there is little data for manpower information. Furthermore it is difficult that the data gathering and managing because manpower management is usually used to execute by subcontractors from supply to demand. Consequently, this study, proposed develop management for accurate manpower plan and efficient collection and practical use of manpower information through analysis of present condition in construction sites

  • PDF

A computation model for Resource-based Lifting loads of the lift-cars for super high-rise buildings (초고층 건축물 리프트카 양중계획수립을 위한 자원기반의 양중부하 산정 모형)

  • Han, Choong-Hee;Lee, Jun-Bok;Won, Seo-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.135-143
    • /
    • 2012
  • Constructing super-tall buildings is significantly different from constructing general ones in every technological and managerial aspects. Especially lift-car operations planning and management is one of core parts among various management techniques required during the course of the whole construction process of the super-tall buildings because vertical movements of physical resources enormously affect the efficiency of the construction processes. However, discrepancy between lifting plans and actual lifting operations causes serious efficiency problems. As an effort to solve the problem, this research suggests an improved method of estimating resource-based lifting load. The computing model developed as a result of this research facilitates more accurate computation of the total operation time and the maximum lifting capacity of the lift-cars. Further, this research can be developed as a decision support system for the total lift-car operations management.

Automated Life-Cycle Management System Based on SCM for Super High-rise Buildings Construction (SCM기반 Automated Life-Cycle Management System 구축방안 - 초고층 빌딩 커튼월을 중심으로 -)

  • Yoon Jeong-Hwan;Kim Yea-Sang;Chin Sang-Yoon;Kim Chang-Duk;Choi Yoon-Ki;Chun Jae-Youl;Lim Hyung-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.430-433
    • /
    • 2003
  • Cost, schedule, quality are the essential parts of success of every construction project. It is especially true in high-rise building construction. Among the construction components in high-rise building construction, curtain walls are very important elements for the project success because they take large portion of cost and schedule. However, curtain wall construction process are very complicated, where many entities including designers, suppliers, contractors and even maintenance contractors are involved. Therefore, control and management of their relationships and production process are critical. It is suggested that this can be solved by the concept of Supply Chain Management which is supported by the automated information technology with Radio Frequency Identification. Such concept is defined as 'Automated Life-Cycle Management System Based On SCM' and this study suggests rode map to establish the system.

  • PDF