Transactions of the Korean Society for Noise and Vibration Engineering
/
v.20
no.10
/
pp.968-975
/
2010
The high interest for the ground vibrations which is caused by the train service is risen. When the trains are passed, a serious force is applied to ground and the caused vibration is propagated to the area of the building by the ground and rocks. This vibration comes to feel in the residents with the direct vibration, it is radiated in sound. The caused vibration and radiated sound affect the human's life, and this vibration brings about the operation interruption of the equipment which is sensitive to the vibration, or will bring about the structural damage of the building. In this study, the effect of the vibrations caused by the passing trains on the railway station and buildings is investigated by vibration measurement. Indoor and outdoor measurement is carried out by each trains.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2001.05a
/
pp.648-655
/
2001
현재 국내에서는 신항만건설. 경부고속철도 건설, 기존고속도로 신설 및 확장공사 등 대형 국책공사와 도심지 내에서의 아파트부지조성, 고층건물신축, 우회도로, 지하차도, 지하철건설 등 중소형 공사가 증가되고 있으며 이러한 대소형 공사 시에 발생하는 건설소음ㆍ진동은 계획단계에서부터 합리적인 기준설정과 충분한 환경영향평가가 이루어져야겠으며 또한 이러한 평가결과가 공사에 잘 반영되어야 할 것이다. (중략)
Kim, Tae-Ho;Do, Hwa-Yong;Won, Jai-Mu;Yoon, Sang-Hoon
Journal of the Korean Society for Railway
/
v.10
no.6
/
pp.678-684
/
2007
This research has defined the factors of noise in cars during subway train services, which is surfacing as a new environmental trouble. It shows additional accomplishment of a discerning analysis on the standard of noise regulation as well as its seriousness. According to the Enforcement Regulations for Noise and Vibration under the Ministry of Environment and its standard noise regulation figure 70dB, we divided two groups of which train noise figures are over and under 70dB respectively, and used their 359 results about noise, geometric structures and operation elements, for this analysis. The results and suggestions are following. First of all, when we discern the seriousness of noise in a train, the track type has mattered in geometric structure and the velocity in operation elements. Therefore, when we construct subway from now on, we should take the track type in consideration and establish plans to keep proper speed in respect of operation. Secondly, the established discernment model in this research can be used in making alternative plans or improvement of subway trains hereafter, showing relatively high accuracy of estimation. Consequently, the readjustment of geometric structure and operation elements is needed, not to make it over the regulation standard of noise in case the noise in train is serious. The discriminant model of this research can be used as elementary material for comfortable and safe subway trains, making the estimation of noise seriousness possible.
Recently, there has been an increasing number of cases of improving constructability by using electronic detonators with precise delay time in tunnel blasting sites. This case is a case of conducting test blasting using with non-electric detonator and electronic detonator at the site of 『Seoul Metropolitan Area Express Railroad Route A Private Investment Project Section 00』 that requires careful management of vibration and noise. Although this site was designed with a non-electric detonator, it was attempted to improve the advance rate and control vibration and noise by mixing the non-electric detonator and the electronic detonator due to the decrease in the advance rate. As a result of the blasting, the target value was achieved with an advance rate of about 85% and a maximum measured value of vibration and noise is 0.215cm/sec and 73.22dB(A) which were measured below regulatory standards. As blasting works in downtown areas, it is necessary to designate measurement and management objects to continuously manage vibration and noise.
Electronic detonators are now widely used in various construction sites and quarry mines. Including the sites where safety-thing is located nearby, Cases of using electronic detonators are increasing to maximize operational efficiency by improving blast fragmentation or reducing the cost of secondary blasting. This case study is about applying for electronic detonators on zone 00 construction site, which is the part of urban area metropolitan express rail A line project. Although the project was initially planned to utilize non-electric detonators, Electronic detonators are considered as the solution not only for safe and fast excavation, but also to minimize civil complaint and the damage of safety-thing. By applying electronic detonators, we were able to satisfy environmental regulations standards and prevent nearby safety-thing from getting damaged.
On sites where explosives are used, the effects of noise and vibration produced by the blast wave are subject to a number of operational restrictions. Recently, the number of civil complaints has increased and the standard of environmental regulations on secure goods has been greatly tighten. Therefore, work is generally carried out by machine excavation in case of close proximity of safety thing. Machine excavation methods have the advantage as reducing noise and vibration compared to blasting methods, but depending on the conditions of rock intended to be excavated, they are sometimes less constructive than planned. In general, the closer a rock type is to hard rock, the less constructible it becomes. In this paper, we are going to explain the construction of a construction section with a close proximity to a safety thing using electronic detonators. While the project site was designed with a machine excavation methods due to the close(9.9m) proximity of safety thing(the railroad), construction using electronic detonators was reviewed as an alternative method for improving rate of advance time and construction efficiency when expose to hard rock. Through blasting using electronic detonators, construction and economic efficiency were maximized while minimizing impact on surrounding safety things. Because $HiTRONIC^{TM}$, which is produced by Hanwha, has innovative stability and high explosion reliability, it is able to explode with high-precision accuracy. Electronic detonators are widely used in construction sites of railway or highway, other urban burrowing areas and large limestone mines.
Rail vibration in city zone is becoming a serious environmental problem. In order to make a reduction plan for rail vibration, the research was conducted in which many experiments to measure actual rail vibration along the railroad through the central Deajeon area. A digital vibration level meter was used to measure rail vibration. Vibration levels of Z-axis were measured at every second for the duration of the train passing. The measuring station was placed at every 5m for the distance of 55m. A total of 353 different sets of vibration level were obtained. The signals were processed to get $L_{10}$ value and analyzed in terms of distance, train velocity, and number of trains. As a result, it has been found that rail vibration exceed the allowable vibraton limit of 60 dB, at the point of 25 m far from the railroad center, which is regulated by the las of vibration and noise. Train velocity was found to affect a little for vibration level within the zone. It was also found that a trench installed along a railroad could reduce vibration level up to approximately 10 percent. A model test was conducted to investigate the influence of the location and size of trench, on the transfer of vibration. A heavy steel ball was used to generate vibrations. On the basis obtained from this study, it could be concluded that the application of distance-attenuation and the installment of a trench along railroad could be applied as a reduction plan for rail vibration. Because limitions might exist to depend on the effect of distance attenuation, trenchs excavated along a railroad might be suggested as the most efficient solution to reduce railroad vibration.
The measures for environmental regulations have become more strict over the recent years. Due to vibration and noise arising from blasting, every site that chooses to handle explosives has to be under certain restrictions in its use. Especially a site where a safety thing is situated within close proximity, the chosen method is through mechanical excavation. However, various applications of electronic detonators has made blasting possible where mechanical excavation used to be the only alternative. Hanwha Corporation has developed an electronic detonator, $HiTRONIC^{TM}$, which is an advanced fourth-generation detonator with a high accuracy of delay time(0.01%). At this moment, $HiTRONIC^{TM}$ is widely used in highway and railway construction sites, large limestone quarries, and many other blasting sites where blasting had not been an available option before. In this paper, I would like to introduce a case study on construction of utilizing $HiTRONIC^{TM}$ at a large-scale tunnel site.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.