KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.1D
/
pp.41-47
/
2006
The construction of traffic facilities has generated a variety of problems in the equality and efficiency when it would be planed and evaluated. One of the reasons for these phenomena isn't the definition of an objective standard about benefit items. Thus, results of evaluation couldn't give a demonstration of confidence. But, the traffic facility construction and its operation costs are securely appeared. Therefor, it will be demonstrated to decide the benefit items in this study. Before deciding the items, user's satisfaction evaluation and economic analysis would be carried. We find out subway user's satisfaction higher than load traffic mode user in satisfaction evaluation, while subway's economic feasibility is lower than load facility, as a result of B/C analysis. In this inconsistent results, we found out that the benefit value is a little lower because of indefinite standard of it's items as comparing Busan Metropolitan City's population with subway's modal split ratio. Accordingly, we enumerate some benefit items in the case of feasibility evaluation as constructing traffic facility. And each of evaluation items' weight is estimated by using ANP. We found out that the weight value of accessibility has the highest one, that of punctuality has second, that of travel time has third, and benefit items according to improvement of user's traffic condition have much more important than those which were considered in the existence economic analysis.
Recently, The government is actively transit road-oriented Traffic System to the eco-friendly and high-efficiency railroad-oriented transportation system for the sustainable green growth. The second plan of Nationwide Railway Network which has been officially announced rearrange to integration, multi-core, open architecture country by the railway network and integrate to the one mega city that rink an important city in one hour 30 minute. But the railroad industry is disadvantageous when it compares with the road industry on the ground that railroad industry peculiarities(a cost-benefit analysis, an environment value, etc) have not reflected in the (preliminary) feasibility study for SOC industry. The government establish Improved methodology of Rail Investment Rating System and improved preliminary feasibility study in railroad project by introduction many content(analysis periods, rate of discount, the benefits of shortening of transit hours, the estimation of traffic accident reduction benefits, investment cost of vehicle substitution and operation and maintenance cost of high speed rail) about the Improved methodology of Rail Investment Rating System. This study is intended to consideration the key content that was included in the Improved methodology of Rail Investment Rating System. In addition, the points to be considered for additional study have been reviewed in this study. We hope we will carry out make a reasonable and objective Rail Investment Rating System and to perform the railway industry of the virtuous cycle such improvement plans are reflected at a hereafter railroad section.
In this paper, as a follow-up PRT studies of "J. Lee & K. Kim[2]", in terms of public transportation systems, economic feasibility of PRT systems was investigated. Based on previous studies, PRT demand was estimated and the required number of PRT vehicles has been calculated and the benefit was estimated. To ensure the economic feasibility, construction cost of a PRT system should be the level of 8 billion won per km, and the annual operating costs of the PRT system construction should be approximately 4.63% level. As a result, how much to reduce PRT construction costs, depending on whether decisions are considered to be economically feasible. Thus, PRT technology development will be conducted by targeting the most lightweight and by minimizing the infrastructure and vehicles of PRT.
With a view to the commercialization of the Korean automatic variable-gauge bogie in the Eurasia railway system, the aim of this research was to perform an economic analysis concerning the possible introduction and operation of this bogie at the present time. For this purpose, we compared the possible types of freight connection service for container transportation, transshipment and the gauge-adjustable system, estimating the total life-cycle cost (LCC) incurred by each system, depending on type and quantity, over the whole process of acquisition, operation, maintenance and disposal. Based on this, we presented a case-by case analysis. Furthermore, in estimating economic feasibility, we analyzed the cost-benefit ratio taking into account not only the objective LCC, but also the reduced time required for the gauge-change and customer convenience. After estimating the LCC and analyzing the cost-benefit ratio of the respective systems, we demonstrated the economic superiority of view of the gauge adjustable system.
Kim, Hwan-Yong;Shin, Min-Ho;Han, Sang-Cheon;Choi, Young-Woo;Kim, Chang-Ho
Journal of KIBIM
/
v.8
no.4
/
pp.41-48
/
2018
Recent technological improvements have made abundant changes in construction industry. In specific, some technical applications, such as Building Information Modeling (BIM) opens up many possibilities. Some studies have articulated the use of BIM and its advantages in construction, but most of them are theoretical, not practical. This study is to provide an insight to such obstacles in BIM research. By investigating a real project that could utilize BIM in planning and construction phases, the authors try to investigate a possible outline of advantages in BIM implementation. The study area was set to a railway construction site in South Korea. The site covers a multiple railway tracks, stations, telecommunication facilities, infrastructure facilities, railway structures, and so numerous. In the site, the authors have identified 12 errors in 7 projects that could be prevented if BIM was utilized before the construction.
Proceedings of the Korean Institute of Industrial Safety Conference
/
2003.10a
/
pp.286-292
/
2003
철도는 1960년대 산업화 이후 급속한 도시화 과정에서 인구의 집중, 도시의 비대화로 인해 늘어나는 교통의 수요와 대량운송 및 정시운행이라는 장점으로 국가산업의 발전과 국민편익에 편리함을 제공하는 등의 지대한 공헌을 하였다. 그럼에도 불구하고, 이러한 발전과 편리함 속에 소음과 진동의 환경공해를 유발하여 철도 주변에 위치하고 있는 거주시설 및 상업시설 등의 거주민들이 생활을 영위함에 있어 불쾌감, 수면방해, 집중력 감소, 시설물의 피해 등의 영향을 주고 있다.(중략)
In this paper, we reviewed the evaluation methodologies of railway project considering the benefit incidence. Generally railway projects are much more reduced tile energy consumption, traffic accident and environmental pollution than road projects. But conventional B/C analysis of railway project does not measured including those benefits. Also there is a few attention to an incidence of benefits producing from railway construction. So we developed the evaluation method of railway project contained the railway oriented benefits and also considered of the benefit incidence producing from railway construction.
KSCE Journal of Civil and Environmental Engineering Research
/
v.37
no.2
/
pp.379-387
/
2017
As the average load factor of High-Speed Rail (HSR) trains increased up to 98%, it caused uncomfortable crowdedness in the cabin and deteriorated the level of service to the HSR users. In this paper, we estimated the willingness-to-pay (WTP) of the HSR users for mitigating the crowdedness in the cabin. The contingent valuation method based on the stated preference data was used and the tobit model was applied for the estimation of WTP. It can be concluded that WTP for mitigating the crowdedness in the HSR trains is proportional to the congestion level of train and income level of user. Males, first-class users, not-assigned ticket users, and monthly pass users have relatively higher WTPs, while homemakers, travelers in weekends, commuters and leisure travelers have relatively lower values. The results can provide the fundamental information to estimate the benefits of mitigating crowdedness or the magnitude of governmental subsidy to railway operators for additional introduction of HSR trains.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.