In order to minimize the maintenance cost at local lines, Information & Communication Technology based onboard train control system is being developed. Unlike the central traffic control based fixed block system, this system use a moving block method and railway driver direct control switch and railway crossing. The purpose of this paper is to analyze the concerned main operational issues are as follows: the preparation of train operation, drivability, the role of driver and controller, block system and cost. We defined the role of driver and driver's input data for train service, and we designed the business process of driver using UML tool. We considered the aspect of drivability, DMI is needed to support the braking moment for the driver and driver training simulator. We designed the driver business process for control of switch and railway crossing. We analyzed the fixed block system and moving block system to confirm the difference with the existing operational method. The cost analysis structure is also needed for the operation cost comparison.
Lee, Jae-Ho;Park, Sungsoo;Kim, Seong Jin;Ahn, IL Yeup
Journal of the Korean Society for Railway
/
v.20
no.5
/
pp.602-611
/
2017
In railway systems, the exchange of information between running trains and wayside equipment is a very important role in various applications such as position detection and train control. Track circuits have been used as the medium for information transmission between trains and wayside. However, track circuits must be installed continuously along the track on the ground, resulting in an inevitable increase in installation and maintenance costs. One of the most promising solutions to reduce these costs is to mix continuous information transmission (via wireless communication) and discontinuous information transmission (via transponder). In this study, we designed antennas of railway high-speed transponder readers and tags for wireless power transmission, which can be used to transmit information from ground to high-speed trains with a maximum speed of 400km/h. We also verified system performance through computational simulation and prototyping.
Simulator is used to verifying the function and performance of train control system before verifying with actual train. In this case, it is important that the simulation result should be coincide with the result with actual train. In this paper, the process of the development of automatic train operation (ATO) is described. ATO is in charge of automatic train control such as speed regulation and precision stop control. Identical interfaces from the ATO to the actual train was made in the simulator. Therefore ATO communicates to the simulator in the same way to the actual train. Futhermore, the train dynamic properties was measured by experiments and these were applied to the train model. Hence the response of the train in the simulator to the acceleration command is similar to that of the actual train. The simulation result of precision stop control is compared with the result in the actual train test to show the fidelity of the train model derived in the study and the superiority of this simulator.
The Journal of Korean Institute of Electromagnetic Engineering and Science
/
v.26
no.8
/
pp.710-717
/
2015
In this paper, we design an array antenna structure based on a patch ESPAR(Electronically Steerable Parasitic Array Radiator) antenna with three elements for reliable communication in high-speed railway wireless communication. The ESPAR antenna consists of the active element with a single RF-chain and the parasitic elements surrounding an active element. The ESPAR antenna is capable of beamforming by adjusting the reactance of the parasitic element. We propose a vertical array antenna structure based on the patch ESPAR antenna and simulate it according to the change of the number of antennas and the distance between antenna rows. The simulation results show that we can get the maximum beam gain and highest directivity when the distance between antenna rows is ${\lambda}$.
Korea Railroad Research Institute has developed the driverless rubber-tired K-AGT (Korean-Automated Guideway Transit) system from 1999 to 2005 and has done its performance and reliability tests on the test line at Gyeongsan-city. Radio Frequency Communication-Based Train Control system of K-AGT, which employed Advanced Automated Train Control scheme, detects train position using the radio propagation delay between wayside and vehicle radio equipment. In this paper, we investigate whether the transmission power of radio system can be reduced to the permitted level announced by the Ministry of Information and Communication for license-free ISM(Industrial Scientific Medical) frequency bands. We first determine radio propagation model, using the measured data at test line, and perform simulation for radio coverage prediction. From the simulation results, we identify that the radio system operated with reduced power can provide good link quality in total test line.
In the system necessary for safety such as the train control system, to make train control information be sent correctly is very important. In the case of the system such as RF-CBTC(Radio Frequency-Communication Based Train Control), sometimes failure in correctness of train controlling information may happen because the information is sent throughout wireless transmission between on-board system of a train and wayside transmitter, and then, it is exposed to noises. Of RF-channel interference, there are various forms. Under the environment of mobile telecommunications, adjacent-channel interference and Co-channel interference are in trouble, and under the environment of the wireless LAN, inter-symbol interference is in trouble. Also, the system of the cellular CDMA mobile telecommunication is affected on the RF-channel interference such as Doppler effect, multi-cell interference, and other users' intervention. In this paper, we analyzed the effect of the train control information related to fading, intervention and other noises made in the underground interval and explained the transmission characteristics numerically. Furthermore, we calculated the mean of the error terms by increasing users in the system of the cellular CDMA. As the method for decrease the error term of sent information, we represented the way adjusting the arrangement of antennas, and we did the model related to the system of RF-CBTC in which the location of an antenna is calculated with really measured value of the transmission characteristics and the way confirming reliability of the wireless transmission.
통합공공용 주파수로 분배된LTE(Long Term Evolution) 718~728Mhz(상향) 및 773~783MHz(하향)에서 재난안전 통신망, 철도무선 통신망, 차세대 해상무선 통신망 등과 같은 LTE기반의 공공통신망(Public Network, 이하 공공망)이 상호 공존하여 사용하는 방안에 대하여 연구하였다. 두 개 이상의 복수의 LTE 네트워크가 동일 주파수를 사용하여 서비스하는 경우 통신 커버리지가 겹치는 영역에서의 간섭은 불가피하다. 셀 간 간섭에 의하여Mission Critical한 요구사항이 중요시되는 공공망에서의 품질 열화가 야기되며, 경우에 따라 심각한 상황을 초래할 수 있다. 본고에서는 국내 공공망의 현황을 살펴보고 네트워크 공유방식에 대한 기술 및 표준화 동향, 그리고 해외의 사례를 알아보았다. 국내 통합공공용 주파수에서 동일 주파수를 사용하게 될 공공망 간의 간섭을 최소화 하여 네트워크를 구축 및 연계를 위해서 개별 공공망간의 네트워크를 공유하는 방안을 고려하였다. 국내 공공망의 효율적인 네트워크 연계를 위해서는 개별 공공망의 서비스 특성과 내부 환경을 반영 할 수 있는 연계 방식이 추가적으로 필요하다.
The Journal of Korea Institute of Information, Electronics, and Communication Technology
/
v.14
no.5
/
pp.375-384
/
2021
The development of the European Railway Traffic Management System (ERTMS) began in 1989 as part of the European Union policy to establish a unified and interoperable railway route in Europe. It is a trend that ERTMS/ETCS(European Train Control System) is becoming an international standard in the railway signaling system. As the solution to this situation, the domestic railway signaling field is also at a time when it is more necessary to develop the technology of the train control system considering interoperability. The European Railway Agency (ERA) has proposed B3R2 (Baseline 3 Release 2) for new ETCS-equipped trains after 2020.12.31. In Korea, Baseline 2.2.0 to 2.3.0d on Gyeongbu Line, Honam Line, Jeolla Line, and Gyeongchun Line was installed and now is under operating. As the Baseline upgrade continues, technical considerations and economic considerations are an occurring trend. In this paper, we analyzed the main functions and compatibility of the currently distributed European standard ERTMS/ETCS Baseline 3 and presented a plan to apply the domestic KTCS(Korean Train Control System) Baseline in the near future.
In the Republic of Korea, the LTE-based public safety (PS-LTE) network is being built for the 700 MHz frequency band. However, the same bands are also assigned to the LTE-based high-speed railway (LTE-R) network. Therefore, it is essential to utilize the co-channel interference management schemes for the coexistence of two LTE networks in order to increase the system throughput and to reduce the user outage probability. In this paper, we focus on the downlink (DL) system for the coexistence of PS-LTE and LTE-R networks by considering non radio access network (RAN) sharing and LTE-R RAN sharing by PS-LTE users (UEs) to analyze the UE throughput. Moreover, we also utilize the cooperative communications schemes, such as coordinated multipoint (CoMP) for the coexistence of PS-LTE and LTE-R networks in order to reduce the UE outage probability. We categorize the coexistence of PS-LTE and LTE-R networks into four different scenarios, and evaluate the performance of each scenario by the important performance indexes, such as UE average throughput and UE outage probability.
The Journal of the Korea institute of electronic communication sciences
/
v.10
no.8
/
pp.875-882
/
2015
Recently, An introduction of communication based train control system both into greenfield and brownfield of urban transit network has been actively reviewed. However, since a number of line sections and rolling stock depots tends to be constructed based on track circuit for various reasons, necessity of inter-operation between two distinct train control system (CBTC, ATC) increases. Therefore, we propose a design of on-board signalling device that allows inter-operation of CBTC and ATC lines and a method to secure safe connection between these two lines without derailing point machine.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.