• Title/Summary/Keyword: 철도수송수요

Search Result 83, Processing Time 0.018 seconds

A Comparison Study on the Design of Dynamic Response appears on Bridge as operation of Light Railway Train (한국형 경량 전철 주행시 동적 응답 처리의 설계 기준 비교 연구)

  • Yeon, sang-ho;Kang, sung-won
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2008.05a
    • /
    • pp.792-795
    • /
    • 2008
  • AGT system is a kind of light railway train. AGT system use of concrete track and rubber tire, so it can be reduce the noise and vibration, compare to the normal train system. And, the dynamic responses of normal bridge are influenced by the dynamic characteristics of bridge, the speed of vehicle and the surface roughness of railway. But the AGT system bridge is influenced not only the above facts but also the guiderail unevenness, because, AGT vehicle steered by guiderail. So, in this study, optimized service condition is suggested for the design and operation of AGT system, by the means of experimental study. The experiments are executed for PSC bridge with length of 30m, at the AGT test line in Kyongsan. The test results are compared and investigated according to the prominence. In the test result, the guiderail prominence influenced on the dynamic response of bridge. It shows a increase as compared with no guiderail prominence in the dynamic response value acceleration, displacement, stain.

  • PDF

A Study on the Construction Demand for Network of Metro Railroad in Busan-Ulsan-Gyeongnam Area - In the place of National Road No.7 - (부울경 광역도시철도망 구축 필요성에 관한 연구 - 국도 7호선 중심으로 -)

  • Choi, Yang Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.771-778
    • /
    • 2011
  • Preliminary feasibility study on Busan metro line #1 in Yangsan line (Nopo-Bukjeong) depending on active volume of mass transportation between Yangsan city and Busan city was conducted. As the study concluded that it's valid, the necessity to establish the metro railroad network connecting to Busan, Ulsan and Gyeongnam Province is demanded to improve the transportation issues in Ungsang area vulnerable to metro service and to drive the balanced development between metropolitan cities. In addition, the volume of transportation depending on methods in target areas and road traffic assignment are surveyed to put a stress on the necessity to establish the metro railroad network. As the demand of transportation for alternative lines is predicted, the budget and benefits for construction for each alternative line set for the rough economic analysis depending on traffic volume for each method and traffic assignment results. The total project budget necessary for construction of proposal line #1 set as effective one among target three lines in this project is calculated in 794.32 billion won. Construction accounts for the most expensive in expenses for project and contingency allowances, purchases for vehicles and collateral expense are followed in orders. However, compensation for lands is not counted. In particular, according to economic analysis in proposal #1, ratio of benefit/cost (B/C) is 0.584, net present value (NPV) is -217.47 billion won, the internal rate of return (IRR) is analyzed in 0.604 %. At the current stage, it is not economically feasible, but the B/C is 0.737 in long-term upon construction of Yangsan line between Wolpheong and Yongdang which is proposal line #3. Therefore, when Busan metro basic plan is reorganized to aim the benefit of residents in Ungsang area vulnerable to the metro service, we think it must be necessary to establish the metro railroad network connecting to Busan-Yangsan-Ulsan which is proposal line #2 by extending the existing Sinjeong line and including this task line in high-ranked plan related to metro railroad.

On the Study of Design Guidelines and a Design Case to Enable the Replacement of LRT Stations by Stops (경전철 역사를 대체하는 정류장 도입을 위해 필요한 설계지침의 도출 및 적용 사례에 관한 연구)

  • Kim, Joo-Uk;Park, Kee-Jun;Lee, Ji-Eon;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.5
    • /
    • pp.3499-3510
    • /
    • 2015
  • To cope with the increased demand on the intra-city transportation by urban rails, the introduction of the light rail transit (LRT) systems has been expedited in Korea due to the possible reduction of both the development and operation costs from adopting LRT systems. The LRT systems have so far been designed, constructed and operated based on the corresponding law and regulations. It has been conceived that fully complying with the existing guidelines may incur some extra costs on LRT. In addition, the present design of LRT stations seems to require unnecessarily long flow of passengers traffic, particularly for disabled people. In this paper, as an approach to solving the aforementioned issues, an introduction of 'LRT stops' has been studied where the stops are similar in concept to bus stops and are intended to replace the stations of a bigger scale in general. Specifically, necessary guidelines for design have been developed by modifying the existing ones to be fit with LRT stops. A design case was also presented to evaluate them. The effective use of the results reported here will provide an opportunity of cost reduction in connection with the construction and operation, and also let people benefit from convenient use of rails, thereby resulting in enhanced transportation welfare.