• Title/Summary/Keyword: 철도설계 자동화

Search Result 25, Processing Time 0.034 seconds

Automated Design of PSC Sleepers in High Speed Railway Turnouts (고속 철도 PSC 분기침목의 자동화설계)

  • 오병환;임시내;최영철
    • Proceedings of the KSR Conference
    • /
    • 2002.10b
    • /
    • pp.1106-1111
    • /
    • 2002
  • The design of sleeper in high-speed railway turnouts is complicated and time-consuming because the length and loading position of sleepers change continuously along the turnout line. It is, therefore, necessary to develop an automated design program which can design automatically the PSC sleepers in turnout region. In this study, a computer program for automatic design of turnout sleepers was developed based on graphic user-interface(GUI) environment. The structural analysis is performed considering the varying loading position of vehicular wheels. The sleepers are treated as located on elastic supports. The user can choose the desirable shape of sleepers before starting the detail design. The present study allows more realistic and automatic design of PSC sleepers in high-speed railway turnouts.

  • PDF

An Automated Design Technique of Box Culverts for the Railroad (철도암거 자동화 설계)

  • 김진구;이종민;조선규
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.660-665
    • /
    • 2002
  • A concrete box culvert has been widely used as a typical structure in case of crossing the railroad and highway. Due to the simplicity of it's own shape, in company with the development of computers many studies on the computer-aided automatic design have been continuously carried out. In this paper, an automated design algorithm has been proposed by the analysis of the existed design data of box culverts. From a viewpoint of the users, a data base system has been constructed to carry out the total design process completely through the minimum input data and by means of direct input method on the monitor screen. And an automatic design program for railroad box culverts, in which one-stop process from the structural calculation to the quantity estimation is possible, has been developed.

  • PDF

Design on Analysis Tools for Black Box of Train (열차용 블랙박스 분석 도구 설계)

  • Kim, Jeong-Bin;Jang, Dong-Wook;Kim, Kwnag Ryul;Han, Kwang-Rok;Sohn, Surgwon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2009.04a
    • /
    • pp.605-608
    • /
    • 2009
  • 최근 철도의 고속화, 자동화됨에 따라 철도 사고 역시 항공기 사고처럼 대형화 되고 인명피해 역시 매우 커지고 있다. 따라서 사고 발생시 사고원인을 신속하고 정확하게 분석하기 위해 철도 차량에 블랙박스의 설치를 법제화 하고 있고, 이에 대한 연구를 진행하고 있다. 사고의 정확한 판단을 위해서 블랙박스에 기록된 데이터를 분석하하는 분석 소프트웨어를 개발하였다. 본 논문의 블랙박스 분석 소프트웨어는 신속하고 정확하게 사고 원인을 규명할 수 있고, 구간별 운행 패턴과 기관사의 습관등을 파악할 수 있어, 운행을 개선 할 수 있어 사고를 미연에 방지 할 것으로 기대한다.

Development of Intelligent Planning and Analysis Method for Railroad Alignment Improvement (지능형 철도 선형개량 계획 및 분석 기술 개발)

  • Kim, Jeong Hyun;Lee, Jun;Oh, Jitaek;Lim, Joonbum
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.5
    • /
    • pp.651-657
    • /
    • 2023
  • Railroad alignment improvements and operating speed increase occupy considerable portion in recent railroad market. Developing countries have limitations to construction of new high speed railroads due to the burden of budgets and the lack of demands, and the projects of operating speed increase arepracticallyrecommended. Thisstudy developed the methodologyto provide the railroad alignment design alternatives and the costs by upgrading the "Intelligent Railroad Alignment Design Program (ei-Rail)" which has been used to obtain the alignment plans and construction costs for railroad construction projects. The program provides the cost for alignment improvement, design drafts and the effects of operating speed increase with the input of target improvement speed and the prevailing railroad alignment on the numerical map. It is then expected for the ei-Rail program to be used for the supporting tool for the railroad alignment improvement projects.

Development of Automated Design Program for Electric Railway Pole Foundation (전철주기초 설계 자동화 프로그램 개발)

  • Kim, Jung-Moo;Chung, Won-Yong;Jeon, Yun-Bae;An, Seung-Hwa;Song, Kyu-Seok;Kim, Jong-Nam;Lee, Su-Hyung
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.692-697
    • /
    • 2010
  • In this paper, a design program for electric railway pole foundation was developed by applying the estimation study performed by Korean Railway. There are two kinds of shapes in the cross-section of electric railway pole foundation: rectangle and circle. In foundation designing, The rectangular foundation should be satisfied with vertical, horizontal and moment equilibrium equations. On the other hand, the circular foundation should be satisfied with horizontal and moment equilibrium equations. The design program was coded into MFC(Microsoft Foundation Class) by MS Visual C. The equation's roots in the program were obtained by Incremental Search method. Dialog and property sheet(Wizard Mode) input windows were selected for user-friendliness. The biggest advantage of this program is to find an optimum depth in a given section.

  • PDF

Applicability of Optimum Algorithm for Automated Design of Electric Railway Pole Foundation (전철주기초 설계 자동화를 위한 최적화 알고리즘의 적용성 검토)

  • Lee, Gi-Yeol;Park, Yong-Dae;Chung, Won-Yong;Song, Kyu-Seok;Lim, Sun-Taek;Kim, Jong-Nam;Lee, Su-Hyung
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1047-1053
    • /
    • 2009
  • This paper examined an applicability of optimum algorithm to develope an electric railway pole foundation automated design system. Based on the optimization theory that considered subgrade and bearing capacity characteristics, decided an optimum section of electric railway pole foundation. In this research, Optimum algorithm used the feasible direction method in structural analysis and design efficiently. Design variables are considered geometric properties and anchor bolt area of the electric railway pole foundation as optimum construction cost. Constraints are considered settlement., overturning and activity of foundation. And, also composed flexural and shearing strength. According to optimum analysis result., optimization theory is available more economical design comparing with railway pole foundation that is constructed by current standard drawing, and applicability verified in automated design system development.

  • PDF

Railway Conflict Detection Design for KORAIL Command Center Intergration Signal Equipment Construction Project (철도청 사령실통합 신호설비 구축 프로젝트에서의 경합검지의 설계)

  • Lee Ju-Wang;Kim Bum-Sik;Bum Young-Hyun;Hong Hyo-Sik;Yoo Kwang-Kyun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1519-1525
    • /
    • 2004
  • 현재 사용되고 있는 열차운행관리 시스템(Railway Traffic Management System, RTMS)에서 경합 검지 및 해소업무는 역 및 선로의 정보(상태)연계 및 자동화의 미비로 인하여 착발선 결정, 착발시간 결정, 교행역, 대피역등에서 발생하는 경합 검지 및 해소(Railway Conflict Detection and Resolution)의 결정이 신속하게 이루어지지 못하고 있다. 본 논문은 국내외적으로 적용하고 있는 열차 경합 검지 방법을 조사 비교하여 가장 적절한 알고리즘을 개발, 구현하여 현재 진행중인 철도청 사령실 통합 신호설비 구축사업 프로젝트에 적용하고자 한다.

  • PDF

Logic design of the Flaw Evaluation in the Rolling stock axle for Phassed Array ultrasonic inspection method (위상배열 초음파 탐상방식에 의한 차측 결함평가용 논리설계)

  • Kim, Hi-Yooung;Lee, Hung-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2008.09a
    • /
    • pp.98-105
    • /
    • 2008
  • 철도차량 차축의 초음파 탐상은 기존 펄스-에코방식을 사용하여 A-Stan으로 영상화하여 결함평가가 이루어 졌다. 하지만 이 방법은 작업자의 판단에 의존하므로 신뢰성이 멀어졌다. 위상배열 초음파 탐상 검사는 단일 탐촉자에 여러개의 진동자를 배열하여 여러 각도에서 탐상이 가능하므로 차축처럼 종류 및 모양이 다양한 구조물의 탐상에 효과적이다. 또한 C-Scan방식으로 영상화 하므로써 작업자가 결함을 판단하는데 있어서 객관적인 평가방법이다. 이 논문에서는 위상배열 초음파 탐상 검사에 대하여 설명하고 차축결함평가를 위한 자동화된 설비의 논리설계를 분석하고 그 실험의 방법과 결과론 고찰하고자 한다.

  • PDF

Design of Structure for Loop Bound Analysis based on PS-Block (PS-Block 구조 기반의 반복횟수 분석 구조 설계)

  • Kim Yun-Kwan;Shin Won;Kim Tae-Wan;Chang Chun-Hyon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2006.05a
    • /
    • pp.195-198
    • /
    • 2006
  • 실시간 프로그램은 항공기, 선박, 철도 예매 시스템 등 다양한 분야에서 사용되고 있으며, 그 개발자는 논리적, 시간적 정확성을 고려해야 한다. 시간적 정확성은 실시간 프로그램에서 가장 중요한 부분이며, 이를 위한 데드라인은 개발자에 의해 정의된다. 따라서 개발자는 데드라인의 정의를 위하여 기준점을 제시할 수 있는 정적 실행시간 분석이 필요하다. 정적 실행시간 분석에서 프로그램의 반복횟수의 분석은 큰 비중을 차지한다. 기존 연구에서 반복횟수의 분석은 사용자 입력에 의존하였고 현재 반복횟수 분석을 자동화하는 연구가 진행 중이다. 하지만 반복횟수의 분석은 반복횟수에 영향을 주는 제어변수의 결정정책에 따라 결과가 달라진다. 따라서 본 논문에서는 PS-Block구조를 기반으로 반복 횟수에 영향을 주는 제어변수들을 종합적으로 분석하여 보다 정밀하고 사용자의 입력을 자동화하는 반복횟수의 분석이 가능한 방법을 제시한다. 이로써 정적 실행시간 분석은 반복횟수의 정밀한 분석을 통하여 분석 결과의 정확도를 높이고 신뢰성을 향상시킬 수 있다.

  • PDF

New Database Table Design Program of Real Time Network for High Speed Train (한국형 고속 전철의 실시간 네트워크를 위한 새로운 데이터 테이블 설계 프로그램)

  • Cho, Chang-Hee;Park, Min-Kook;Kwon, Soon-Man;Kim, Yong-Ju;Kim, Sung-Shin
    • Proceedings of the KIEE Conference
    • /
    • 2003.07b
    • /
    • pp.1338-1340
    • /
    • 2003
  • 현재의 공장 자동화, 국방, 항공, 철도, 금융 등을 포함하는 실시간 시스템은 여러 개의 컴퓨터가 다수의 장소에서 서로의 데이터 교환을 통한 협동 작업으로 여러 가지 기능 및 업무를 수행한다. 이는 마치 멀티프로세서를 가진 컴퓨터같이 생각할 수 있으며 이와같은 시스템에 있어서 업무 수행의 효율은 각 프로세서의 계산 능력에 비례함과 동시에 각 노드간의 데이터 전송 능력에 비례한다고 할 수 있다. 이와 같은 실시간 시스템이 올바르게 동작하기 위해서는 한정된 시간 내에 일정한 양의 데이터의 전달을 확정적으로 보장해 줄 수 있는 네트워크를 필요로 하는데 이를 실시간 네트워크(Real time network)라고 한다. 현대의 분산제어 시스템에 있어서 확정적인 시간 내의 데이터 전달은 전체 제어 시스템의 응동 특성에 중요한 요인이 된다. 본 논문은 한국형 고속 전철의 시제차(Prototype train)에 적용된 국제 표준 실시간 네트워크인 열차 통신 네트워크(Train Communication Network)에 관련한 내용이다. 실시간 네트워크는 실시간성을 보장하기 위해서 상호 교환될 데이터가 필요에 따라(온라인 상에서) 변경되는 것이 아니라 오프라인 디자인의 결과로 미리 결정되어진다. 즉 통신장치 사이에 전달되는 네트워크 데이터는 미리 설계된 네트워크 테이블을 기초로 정해진 시간에, 정해진 데이터가, 정해진 방식으로 전달되어 진다. 본 논문에서는 실시간 네트워크의 오프라인 설계를 하기 위한 도구로서 개발되어진 네트워크 데이터 테이블 작성 프로그램에 대해서 설명한다.

  • PDF