• Title/Summary/Keyword: 철도건설기준

Search Result 139, Processing Time 0.024 seconds

A Study on Safety Standards of a Railway Crossing (철도 건널목 안전기준에 관한 연구)

  • Jeong, Yeon-Jeong;Lee, Seong-Mo;Park, Chang-Ho
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.1
    • /
    • pp.83-95
    • /
    • 2009
  • The railway crossing is very dangerous because the track intersects with the road there. Thus, The laws were designed for safety of the railway crossing and they are classified as to the acts for the road and the railroad. For safety of the railway crossing, there are 'Road/Railroad Crossing Improvement Promotion Act', 'Enforcement Decree of Road/Railroad Crossing Improvement Promotion Act', 'Rules on Construction of Railroad', 'Rules on Safety Standards of Railroad Installations', and 'Enforcement Ordinance of Cable way/Railway Track Act' in the acts for the railroad and there are 'Road Traffic Act', 'Enforcement Ordinance of The Road Traffic Act', 'Ruled on Structure and Facility Standards of The Road', 'Rules on Structure And Facility Standards Of The Rural Road' and 'Rules on Structure and Facility Standards of The Installations for Bicycle' in the acts for the road. Both the acts for the road and the railroad have standards for the structure of the railway crossing. However, they have different standards. Besides, they don't have standards for new facilities which were recently installed for safety of the railway crossing. Therefore, we suggest new standards for safety of the railway crossing.

Geoid Height Estimation Using Rail-road Reference Points (철도기준점을 활용한 지오이드고의 추정)

  • Heo, Joon;Song, Yeong-Sun;Kim, Sung-hoon;Moon, Cheung-Kyun
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.4
    • /
    • pp.499-505
    • /
    • 2009
  • This paper evaluated applicability of railroad reference points for determinating geoid heights. For this research, reference points on the Honam express raildroad which contain ellipsoid heights estimated by GPS/Leveling and orthometric heights by leveling were used. Geoid heights were calculated uisng orthometric and ellipsoid heights of 360 railroad reference points, and the RMSE's with respect to different intervals of reference points were analysed which were induced by interpolation methods. The results showed that no significant difference of RMSE's among interpolation. methods. RMSE's of 0-4km interval of reference points were determined within 2cm and 5-8km were within 3cm. Also, this research confirmed that GPS leveling with Geoid model is not auurate enough to be used for railroad surveying as yet.

Risk Analysis Based on Accident-Category for Railway Work Zones (철도건설현장의 사고유형기반 위험도 분석)

  • Park, Mi-Yun;Choi, Eun-Soo;Park, Joo-Nam;Choi, Seung-Sun
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.2
    • /
    • pp.260-266
    • /
    • 2009
  • The theory of risk is applied frequently in analysis of railway accidents. The aim of risk analysis is to search potential causes and contribution factors of accidents by checking the total system of construction field. This paper analyze a pattern and a cause of accident occupied in construction field, calculate risk index considering accident frequency and severity, and then provide the relative risk assessment. Based on this, this paper will provide the methodology of qualitative risk assessment guiding to reach a consistency of risk index with risk assessment.

A Field-test Study of the Design Standards of Elevated Structures for Rubber-wheeled Light Rail Transit: Braking Force (고무차륜형 경전철 고가구조물 설계기준에 관한 현장 계측 시험 연구(1): 제동하중)

  • Shin, Jeong-Ryol;Lee, An-Ho;Park, Jae-Im;Shin, In-Jo
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.2
    • /
    • pp.133-139
    • /
    • 2014
  • Due to the absence of design guidelines for elevated light-rail structures in Korea, most elevated light-rail structures have been designed and constructed based on the design codes of conventional railway bridges and on the codes recommended by foreign vehicle manufacturers. This is the main reason why most elevated light-rail structures are massive or over-designed or poorly constructed economically. In this paper, the authors carried out field tests to analyze the braking forces caused by braking a train running at speeds of 50km/h, 60km/h, and 70km/h, acting on the elevated structures of rubber-wheeled Light Rail Transit (LRT) trains. The authors also briefly describe the analyzed results of the braking force acting on the substructures of elevated light-rail structures. The test-results presented here in this paper can be referenced when establishing design guidelines or standards for elevated structures of LRT systems.

Analysis of the Finishing Failure in the Railway Station Platform and Deduction of Improvement Plans (철도역사 승강장 연단부 마감 탈락에 대한 원인 분석 및 개선 방안)

  • Ko, Sewon;Yu, Youngsu;Koo, Bonsang;Kim, Jihwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.46-53
    • /
    • 2022
  • The railway platform is an important facility closely related to the safety of passengers, trains, and images of railway facilities, and requires thorough facility management. However, the problem that the finishing material (plastering mortar) for the joint finishing of dissimilar materials (concrete+granite) falls off in the direction of the track at the platform podium is occurring multiple times across the country. Since these problems threaten the safety of train operation and the safety of passengers, immediate and continuous management is required. This study tried to derive improvement plans through the analysis of the drop-off problem of finishing materials occurring at the platform podium. The status of missing finishing materials for the platform podiums of about 200 railway stations and the related design and construction standards of the Korea National Railway were investigated. After that, the cause of the drop-off of the finishing material was analyzed, and as a result, it was found that the main cause was the boundary between the roadbed and the architectural process that occurred during construction. Subsequently, in connection with the derived causes and design, construction standards, (1) improvement of finishing materials or construction methods, (2) design of finishing materials that are easy to adjust height, (3) design of separate finishing methods, (4) improvement methods and durability were suggested.

Proposal for Specification of Counter-measurement in Frost-Heave System in Railway Underpass Box Structures in North Korea Considering Climate Condition (북한지역 기후조건을 고려한 철도횡단구조물의 동상방지방안 제시)

  • Kim, Mun-Su;Cho, Kook-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.1
    • /
    • pp.99-110
    • /
    • 2017
  • As a part of several Eurasian initiatives, the Korean government is trying to reconnect railways through North Korea to the Asian continent. If South Korea could build a network using railway, it would be a chance to develop a robust economic environment and to motivate economic growth. In the railway reconnection project between North and South Korea, the most important part of the railway roadbed sector is repair or improvement, and then construction of a new line through North Korea. There are not many big differences in the geological conditions; however, climate condition varies greatly during winter. The most significant condition in the safety of railway operation is frost-heaving. However, since South Korea has a relatively mild climate condition compared with North Korea, design and construction specifications under severe weather conditions in winter have not been prepared. This study proposes a plan for revising the railway design standard for underpass structures through an analysis of international standards, leading to site construction to prevent frost-heave.

Review on the detailed standards for Quantitative Risk Analysis in High Speed Railway Tunnels (고속철도 터널의 정량적 위험도 분석(QRA)을 위한 세부기준에 관한 고찰)

  • Choi, Won-Il;Choi, Jeong-Hwan;Moon, Yeon-Oh;Kim, Seon-Hong;Yoo, Ho-Sik
    • Tunnel and Underground Space
    • /
    • v.18 no.6
    • /
    • pp.393-407
    • /
    • 2008
  • To protection of fire accident and to minimize danger of spreading the disaster. in railway tunnel, MCT (the Ministry of Construction and Transportation) published "Rules about the Safety Standard of Railroad (2005.10.27)" and "The Detailed Safety Standard of Railroad (2006.9.22)". QRA(Quantitative Risk Analysis) results are applied to establish the fire protection facilities in railway tunnel so that institute the reasonable application about the fire safety facilities However, it is difficult to perform the fire safety design due to lack of the detailed standards about event scenario, fire intensity, incidence rate of accidents etc. Therefore, This paper introduces the practical method about detailed standards of QRA.

Study on the Priority of Blockchain Adoption to Railway System through AHP Method (AHP를 이용한 블록체인 철도분야 적용 우선도에 대한 연구)

  • Han, Sumin;Won, Jongwun;Chang, Tai-Woo;Lee, Seok
    • The Journal of Society for e-Business Studies
    • /
    • v.25 no.4
    • /
    • pp.111-124
    • /
    • 2020
  • Blockchain was proposed in 2007 and began to be applied to actual services soon afterward. The railway system covers railroad construction and railway services. Because of the public characteristics of the railway system, it is expected that significant advantages can be obtained through the introduction of blockchain. Many benefits can be gained by applying the blockchain to them, but it is impossible to apply the blockchain to every part immediately due to the limitations of time and resources. Therefore, it is necessary to derive services or functions to which the blockchain will be applied and to select the part of them first. Since there are various evaluation criteria to derive the priority of blockchain adoption, systematic consideration is required. In this study, AHP was applied to calculate weights for evaluation criteria and systematical evaluation. Through the results of this study, it is expected that it is possible to build a roadmap for a next-generation railway system.

Evaluation of Track Irregularity Effect due to Adjacent Excavation on Serviced Railway Line (철도시설물 인접굴착공사에 따른 운행선 궤도의 궤도틀림 영향 평가)

  • Choi, Jung-Youl;Park, Dong-Ryong;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.4
    • /
    • pp.401-406
    • /
    • 2019
  • The three-dimensional precision numerical analysis was performed using the finite element model applied with the railway track model consisting of rails, sleepers, and track elastic springs(ballast, rail pad). As a result of analyzing the track deformation level of the existing tracks due to the excavation work adjacent to the railway facilities, it was found that the track irregularity evaluation criteria (allowed values) of both conventional and high-speed railways lines were satisfied. Based on the numerical analysis using the track model, it was analyzed that the results of the prediction of the track irregularity due to the excavation work and the level of the track deformation occurring at the actual site could be approximated as closely as possible.