Review on the detailed standards for Quantitative Risk Analysis in High Speed Railway Tunnels

고속철도 터널의 정량적 위험도 분석(QRA)을 위한 세부기준에 관한 고찰

  • Published : 2008.12.31

Abstract

To protection of fire accident and to minimize danger of spreading the disaster. in railway tunnel, MCT (the Ministry of Construction and Transportation) published "Rules about the Safety Standard of Railroad (2005.10.27)" and "The Detailed Safety Standard of Railroad (2006.9.22)". QRA(Quantitative Risk Analysis) results are applied to establish the fire protection facilities in railway tunnel so that institute the reasonable application about the fire safety facilities However, it is difficult to perform the fire safety design due to lack of the detailed standards about event scenario, fire intensity, incidence rate of accidents etc. Therefore, This paper introduces the practical method about detailed standards of QRA.

철도터널에서의 화재 등과 같은 불의의 사고를 예방하고 사고 발생시에는 피해를 최소화하기 위하여 철도시설에 대한 안전기준이 필요하게 되었으며, 건설교통부(현 국토해양부)에서는 "철도시설 안전기준에 관한 규칙(2005년 10월 27일)"과 "철도시설 안전세부기준(2006년 9월 22일)"을 고시하여 일반철도와 고속철도 터널에 적용하도록 하였다. 이러한 방재관련 법규는 터널 방재설비의 과다 및 과소 설계를 방지하기 위하여 5가지 주요시설물(방연문, 배연설비, 대피통로 접속부, 대피통로 간격, 연결송수관 설비)에 대하여 안전성 분석결과에 따라 설치하도록 하여 많은 비용과 시간이 소요되는 방패시설물의 합리적인 설치방안을 제시하였다. 그러나, 안전성 분석방법은 기존 사고사례 및 자료를 토대로 화재강도, 가능한 시나리오, 사건발생 가능성, 사고영향, 사고발생확률 등에 대한 세부적인 분석방법에 따라 안전성 분석 결과의 차이가 크므로 이에 대한 구체적인 기준이 필요하다. 따라서, 본 논문에서는 고속철도 터널 안전성 분석에 대하여 단계별로 세부적인 수행방법을 소개하였으며, 이를 참고하여 합리적인 범위 및 기준을 개발하는 데 어느 정도 기여할 수 있을 것으로 판단된다.

Keywords

References

  1. RSSB (Rail Safety and Standards Board), 2004, "Profiles of Safety Risk on the UK Mainline Railway", Report
  2. Det Norske Veritas Ltd, 2002, "Application of QRA in operational safety issues", Health and safety executive
  3. Mattias Persson, 2002, "Quantitative Risk Analysis Procedure for the Fire Evacuation of a Road Tunnel", Lund University
  4. Yoav Arkin, 2002, "Using quantitative risk assessment (QRA) and cost benefit analysis (CBA) to prioritize fire and life safety risk reduction measures in old railway tunnels", AREMA Annual conference
  5. Haukur Ingason and Anders, 2004, "Recent achievement regarding measuring of time-heat and time-temperature development in tunnels", ITA-AITES first conference, pp 87-96
  6. Boon Hui Chiam, 2005, "Numerical simulation of a metro train fire", Cantervery university
  7. E Casale, E Cesmat, J.P Vantelon, M Legrant, E Verbesselt, 2006, "Influence of longitudinal ventilation on the heat release rate of a TGV engine fire", BHR Group AVVT 12, pp 95-109
  8. E.Ruffin, A Carrau & C Cwinklinski, 1999, "Numerical Simulation of Locomotive Fires in the Lyon-Turin Tunnel", International Conference, pp 235-244
  9. 왕종배, 홍선호, 김상암, 박옥정, 2003, "철도터널 및 지하구간에서의 화재사고 위험성 분석연구", 한국철도학회 추계학술대회, pp 271-276
  10. American National Standards Organization, "ISO/DTS 13571 Life threat from fires-Guidance on the estimation of time available for escape using fire data"
  11. 건설교통부, "철도시설 안전기준에 관한 규칙", 건설교통부령 제 476호
  12. 건설교통부, "철도시설 안전세부기준", 건설교통부 고시 제 2006 - 395호
  13. Boras, "Proceedings of the International Conference on Fires in Tunnels", Sweden
  14. Subway Environmental Simulation 4 User Guide
  15. National Institute of Standard and Technology, 2006, "Fire Dynamics Simulator and Smokeview User Guide", BFRL
  16. "SFPE 방화공학 핸드북 제3판 1권, 2권", 한국화재보험협회
  17. 임재현, 김영근, 김동현, 정찬묵, 한국철도학회, 2006, "QRA에 의한 철도터널 방재안전성 평가", 한국철도학회 추계학술대회, pp 21-31
  18. Louise C.Speitel, 1995, "Toxicity Assessment of Combustion Gases and Development of a Suvival Model", FAA
  19. Palsson, 2004, "Risk Management in Hvalfjordur Tunnel", Lund University
  20. David J Bell, Peter J Floyd, "Societal Risks", Middlesex University and Risk & Policy Analysts Limited
  21. M.Rausand, 2005, "Some basic risk concepts", Norwegian University
  22. S.N.Jonkman and J.K.Vrijling, P.H.A.J.M van Gelder B.Arends, 2003, "Evaluation of tunnel safety and cost effectiveness of measures", Safety and Reliability
  23. Det Norske veritas ltd, 2002, "Application of QRA in operational safety issues", HSE
  24. Fathi Tarada, Rudolf Bopp, Samuel Nyfeler, Kwang -soo Jegal, Deog-Su Kim, 2000, "Ventilation and Risk Control of the Young Dong Rail Tunnel in Korea", International conference on majot tunnel and Infrastructure Project
  25. Knoflacher H, Pfaffenbichler P.C, "A comparative risk analysis for selected austrian tunnels", Vienna University
  26. Hakan Frantzich, 1998, "Uncertainty and Risk Analysis in Fire Safety Engineering", Lund University
  27. Bouissou Charlotte, Ruffin Emmanuel, Defert Raphael, Prats Franck, Dannin Eric, "A new QRA model for rail transportation of hazadous goods", INERIS
  28. Dan Modi, "Application of Risk Analysis to Product Safety", Alcon Research Ltd
  29. Stanford University, 2007, "Special Workshop on Risk Acceptance and Risk Communication"
  30. Tara Barden, Jason Bro-wn and et al, "Modeling Train Fires in Fire Dynamics Simulator", WPI
  31. FIT, final reports of the FIT network, "Annex1-Annex4"
  32. 김성찬, 유홍선, 최영기, 김동현, 2004, "화재성장 모델이 객차내 화재 특성에 미치는 영향에 관한 수치해석적 연구", 한국 철도학회지, 제7권 제3호, pp 180-185
  33. 홍선호, 왕종배, 곽상록, 이우준, 2003, "철도안전관리를 위한 사고자료관리 D/B구조에 관한 기초연구", 한국철도학회 추계학술대회, pp 214-246
  34. 신제영, 1996, "누구나 알아야 할 화재진압요령", 한국소방안전협회 통권 91호
  35. IES, SIMULEX, User manual
  36. 건설교통부, 2006, "철도화재 안전성능 평가 및 사고방지 기술개발", pp 141-143
  37. Bjorn Hedskog et al, 1998, "Deterministic analysis of a fire in Stenungsbaden Yacht Club", Lund University
  38. 철도기술연구원, 2006, "철도터널 안전성 분석 평가절차서(감리용)"
  39. M Molaq & L Slutis, "Quantitative Risk Analysis to Optimise Fire Safety During Basic HSL South Tunnel Design", TNO
  40. 김원국, 송범, 전덕찬, 2003, "QRA를 이용한 철도터널 방재설계에 관한 연구", 대학토목학회 정기학술대회, pp 4705-4790
  41. 김선홍, 문연오, 석진호, 김기림, 김찬동, 유호식, 2008, "호남고속철도터널의 정량적 위험도 분석(QRA)을 위한 세부기준수립 및 적용사례", 한국암반공학회 국제학술회의
  42. 김시격, 신태균, 2005, " 터널방재의 최근동향" 대한터널학회, VOL 6 NO 2 pp 51-58