• Title/Summary/Keyword: 철근콘크리트 공종

Search Result 17, Processing Time 0.011 seconds

Reinforced-Concrete Works Productivity and Influence Factor Analysis on Nuclear-Power-Plant Project (원자력발전소 건설현장의 철근콘크리트 공종 생산성 및 영향요인 분석)

  • Huh, Young-Ki;Lim, Jin-Ho;Kim, Kyoung-Uk;Ahn, Young-Chul;Oh, Jae-Hun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.4
    • /
    • pp.314-321
    • /
    • 2014
  • Nuclear power plant projects are being increased all over the world. The construction of nuclear power plants needs huge money and time, which makes conducting a detailed analysis of productivity through the whole process. Reinforced-concrete works productivity field data was collected for more than one year and analyzed from a nuclear-power-plant project in Korea. The productivities of formwork, rebar-work, and concrete pouring were $0.54m^2/man{\cdot}day$, $0.06ton/man{\cdot}day$, $1.98m^3/man{\cdot}day$, respectively. Moreover, it is revealed that 'Day of the Week' is a driver of the formwork activity and 'Overtime' is for all of the three. The results will be a great interest of industry personnel estimating time and cost of a new nuclear power plant.

거푸집공사의 재해 위험성 평가에 관한 연구

  • 오준호;고성석
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2002.05a
    • /
    • pp.109-114
    • /
    • 2002
  • 건설공사의 공종 중 거푸집공사는 전체공사기간의 대략 25%를 차지하고 있으며 공사비 비율은 일반적으로 전체공사비의 10~15%, 철근콘크리트공사비의 20~30%를 차지하고 있어 구조물의 안전성, 경제성 및 작업성과 품질관리에 중요한 역할을 한다. 또한 거푸집은 콘크리트가 양생되면 곧 해체되는 가설구조물로써 작업상에서 많은 위험요소를 포함하고 있으며 특히, 아파트공사의 경우 전체 재해발생의 17%로 가장 높은 비율을 차지하고 있다. 이와 같이 거푸집공사는 가장 우선적으로 관리하여야 할 위험공종이며 전체공기를 좌우하는 주공정으로서 이를 재해발생의 측면에서 제어하는 것이 안전관리에 있어서 가장 효율적이며 큰 효과를 나타낼 수 있는 것으로 생각된다.(중략)

  • PDF

Development of Historical Data Selection Model Using Non-parametric test in Public Sector - focused on Reinforced Concrete Works of Multi-housing Projects - (비모수 검정기반 공공부문 실적단가 선정모델 개발 -공동주택 철근콘크리트 공종을 중심으로-)

  • Lee, Hyun-Ki;Jeon, Jae-Yong;Park, Sung-Chul;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.87-95
    • /
    • 2008
  • The government wants to apply the construction cost estimating method based on historical data published in the first six months of 2004. Construction companies, however, require the proposed cost estimation model, to be improved which makes it difficult to predict a reasonable construction costs. This paper presents an improved historical data selection model after analyzing the problem of previous method throughout comparing contracted unit prices of reinforced concrete works selected by the previous model to market prices. The model which can select more feasible data would assist participates such as general contractors and sub-contractors to earn a proper profits.

A Study on the Application of BIM for Reinforcement Concrete Structural Work (철근 콘크리트 공사에서의 BIM 적용 연구)

  • Ahn, Jae-Hong;Lim, Nam-Gi
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.158-166
    • /
    • 2018
  • The application of the BIM for architectural and structural work accompanied many trials-and-errors on project based on BIM by this time Ten years have passed since BIM issued, but it is not activated. This study suggests ways to activate BIM for architectural and structural work. The reason for choosing the structure construction is as follows. Construction cost is a high proportion of structural construction cost. On the other hand, the number of related materials is small, and the first in the 3D modeling process is structure modeling. And build BIM-based Structural Database by quantity take-off. This study shows the applicability of BIM through practical cases. This study is expected to provide suggestion for the successful implementation of BIM-based projects.

사망재해를 통한 아파트공사 철근.콘크리트공종 재해예방 투자에 관한 연구

  • 김시억;손기상
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2000.11a
    • /
    • pp.405-410
    • /
    • 2000
  • 면적 99,268.38$km^2$속에 4,700만명 인구가 살고 있는 현실에서 우리의 주거 형태는 점점 고층화, 대형화 될 수밖에 없는 실상이다. 여기에 건설공사 역시 위험이 검증되지 않은 신기술 형태가 가미되고, 업종에 종사하는 근로자의 유형 역시 노령화되어 건설공사 현장 재해는 날로 증가 되고있는 것이 지금의 현실이기도 하다.(중략)

  • PDF

Schedule Risk Management of Reinforced Concrete Construction at the Preconstruction Phase (착공전 단계에서의 철근콘크리트 공사 공정리스크 관리 방안)

  • Ryu, Han-Guk;Kim, Sun-Kuk;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.119-127
    • /
    • 2005
  • According to the recent systemic changes such as construction market reduction, five days per week system, introduction of construction duration reduction bidding system and post-construction sale system, the bidding competition have been enhanced. However, there are many construction schedule risks which could delay construction completion. Without the proper identification of construction schedule risks and the structured construction schedule risk management, the competitive advantages of construction project could not be made. Previous researches to solve the problem have been focused on the construction schedule categorization, construction schedule management, and the system development to manage the construction schedule risk. Therefore, this study selected the reinforeced concrete construction as the studied work due to the major impact characteristics on the total construction duration and the quite accident rate, and then proposed the real construction schedule risks of reinforced concrete construction and the construction risk management method based on the previous studies, many times of expert interviews and brainstorming.

A Process Improvement in Building Constructions using Value Stream Analysis - Focused on slab works - (가치흐름 분석을 통한 건설공사의 공정개선방안 - 슬래브 공사를 중심으로 -)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook;Jang Chan-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.527-530
    • /
    • 2002
  • The purpose of this study is to present an improvement of the form work process. The current slab form work has waste factor by unnecessary process and not complete integration with the finishing process. Therefore the study used value stream analysis methodology for effective improvement of slab form work process. The main contents of the study are as follows; 1) Understanding of non-value adding activities in existing slab form work process 2) Process integration by value stream mapping 3) Effect analysis of time-cost reduction. The study recommends that, as a future research, development of tool and technique for the non-value adding activities are eliminated in building construction.

  • PDF

Analysis of the Crew Productivity and Influence Factor for Special-Plant Reinforce Concrete (특수 플랜트 철근콘크리트 공종의 작업조 생산성 및 영향요인 분석)

  • Huh, Young-Ki;Lim, Jin-HO;Ahn, Young-Chull;Oh, Jae-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.42-43
    • /
    • 2014
  • Few studies on crew productivity has been conducted, although the data is significant for time and cost estimation. Crew productivity data was collected for over 9 months from a nuclear power plant and analysed in order to identify factors driving the productivity. It was revealed that the crew productivity of form work, rebar work and concrete pouring work was 45.64(㎡/crew·day), 2.93(t/crew·day), 110.25(㎡/crew·day) on average respectively. Moreover, 'nightwork', 'No. of workers per crew' and 'total work amount' were identified as drivers.

  • PDF

Analysis of Inundation Pattern of Excavation Site Using Hydrodynamic Model (동수역학 모델을 이용한 굴착공사 현장 침수 양상 해석)

  • Yoo, Dong Hyun;Lee, Ka Young;Sim, Ye Jin;Song, Chang Geun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.300-300
    • /
    • 2020
  • 최근 전체 산업재해율은 계속적으로 감소 추세를 보이는 반면, 건설업의 재해율은 증가하는 추세를 내타내고 있다. 이러한 건설업 공종별 재해유형은 임시구조물과 관련된 가설공, 굴착공, 철근콘크리트공의 재해율이 타 공종에 비해 높게 나타난다. 이는 공종 진행에 따라 변화되는 건설현장의 위험요소를 사전에 인지하여 제어·관리할 수 있는 사고예측 기술 및 대응 기술의 부재로 안전사고가 높게 발생한 것으로 판단된다. 이러한 상황 속에서 건설현장에서 빈번하게 발생하는 다양한 재해 상황에 대하여 공사별, 규모별, 공정별 대응 체계를 마련하고, 굴착공사 중 침수 발생 시 피해를 최소화할 수 있는 실용적인 긴급대응 방안을 확보함으로써 경제적인 손실뿐만 아니라 인명피해를 최소화하는 방안 마련이 필요하다. 공사 현장 재해 상황 중 침수는 태풍 또는 집중호우 시 공사구간이 침수되어 근로자 수몰 등의 피해가 발생하고, 절토면이 붕괴되는 등 2차적인 피해로 이어진다. 이러한 침수의 원인은 공사 현장의 저지대 위치, 집중호우 시 최대 강우량에 대한 대비 소홀, 양수기 부족 및 고장, 인접 배수로 배수기능 불량 등의 복합적인 원인들로 인하여 발생한다. 또한 굴착공사 현장의 침수는 공사기간 동안 개별 공종에 따라 침수발생 양상이 달라질 수 있다. 따라서 각 공종별 발생 가능한 침수 양상에 대한 예방/대응 기술이 필요하다. 본 연구에서 사용되는 HDM-2D 수리 동역학 모델은 2차원 흐름해석 프로그램으로 복잡한 하천지형이나 공사현장과 같은 불연속면에서 유속 및 수심 등을 계산한다. 또한 마름/젖음 현상 등 복잡한 수리현상에 대한 정교한 모의 기능 및 침수해석 등 어떠한 계산영역이나 흐름조건에서도 정확하고 안정적인 모의를 할 수 있다. 본 연구에서는 공사현장과 같은 불연속면에서 각 공종에 따라 발생할 수 있는 침수양상에 대한 모의를 진행하고 각 공종별 침수양상을 비교분석 하였다. 이를 통해서 굴착공사 현장 침수피해 예측 모델을 개발하여 개발된 기술을 사용하여 기후변화에 따른 강우량 증가와 이에 따른 수재해로 인한 건설현장 침수 발생 및 인명, 재산피해를 최소화하고자 한다.

  • PDF

A Guideline for Construction Management Plan Based on the Characteristics of $CO_2$ Emissions: A Case Study for a High-Rise Residential Building Project ($CO_2$ 배출 특성을 고려한 건설폐기물 관리방안 수립기준: 고층 주거건물 건설 프로젝트를 대상으로 한 사례조사)

  • Kim, Jee-Hye;Shin, Dong-Woo;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.150-158
    • /
    • 2007
  • As the amount of $CO_2$ emission in Korea is ranked 9th and the increasing rate of $CO_2$ emissions highest in the world, it is strongly necessary to devise methods to decrease the amount of $CO_2$ in each industry as the basis of establishing environmentally sustainable production system. This paper aims to identify the characteristics of $CO_2$ emissions from construction wastes throughout the simplified LCA (Life Cycle Assessment) and suggest the strategic guideline for the construction waste management plan to decrease $CO_2$. As a result of LCA on the case of a high-rise residential building project, total sum of $CO_2$ emission generated from construction wastes appeared as 6,818,123kg-$CO_2$ and $CO_2$ emission per unit floor area as 21.01kg-$CO_2/{\beta}{\ge}$. The principal waste materials generating more than 95% of $CO_2$ are materials such as reinforcing bar, temporary materials, cement, ready-mixed-concrete, concrete products, and tile, which have relatively high unit emission rate of $CO_2$ in the process of production. Besides, more than 92% of $CO_2$ was generated from the activities such as structure work, plaster work, temporary work, and tile and stone work, which are generally executed in the early phase of the whole construction period. Reflecting these results, the guideline for the construction waste management plan was recommended. If the waste management plan is established considering the guideline suggested, there would be high potential to decrease the amount of $CO_2$ generated from construction wastes.