Comparison of Pure Reinforcement Quantity to Development & Splice Reinforcement Quantity using High-strength Reinforcing Bars (고강도 철근 사용에 따른 순수 철근량에 대한 정착 및 이음 철근량 비교)

  • Cho, Seung-Ho;Na, Seung-Uk;Roh, Young-Sook
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.72-80
    • /
    • 2018
  • Whilst it is common to construct high-rise buildings and long-span structures in the construction and building industry, there might be a number of problems such as excessive re-bars arrangement, deterioration of concrete quality, unnecessary quantity take-off and so forth. As these types of buildings and structures are getting more popular, it is widespread to apply high-strength materials such as high-strength concrete and re-bars to sustain durability and stability. This research aims to investigate the effectiveness of the high-strength reinforcing bars on the underground parking in a rigid-frame structure. In this study, the reinforcing bars with different yield strength were applied to corroborate the usefulness and practicability of the high-strength re-bars on the underground parking in a rigid-frame structure. The test results show that the quantity of reinforcement bars is lowered, as the yield strength of the re-bars are grown in general. However, the quantity of reinforcement bars on the development and splice has a tendency to increase slightly. Despite of the increase of the development and splice, the total quantity of reinforcing bars was reduced since the increasing ration of the pure quantity is higher than the development and splice. Base on the test results, it would be possible to achieve the reduction of reinforcing bars arrangement and lowering the amount of work to be done during a construction phase. Moreover, the reduced amount of bar arrangement will make it possible to improve workability and constructability of reinforced concrete structures. Ultimately, we will be able to attain improved quality and efficiency of construction using reinforced concrete.

Development Properties of Rebar in Tension with High Strength Concrete (인장을 받는 고강도철근콘크리트 부재의 정착성능 평가)

  • Park, Su-Hee;Lee, Bum-Sik;Kim, Sang-Yeon;Park, Seoung-Sik;Bae, Kee-Sun;Kim, Seong-Deok
    • Land and Housing Review
    • /
    • v.2 no.1
    • /
    • pp.53-60
    • /
    • 2011
  • In this study, development tests varying with concrete strength, development length, and the rate of fiber mix ratio are carried out to evaluate the development characteristics of high-strength concrete member with 80MPa, and the applicability of estimated standards of development length in KCI 2007. As a result, it can be expected that minimum development length of KCI 2007 is applicable to high-strength concrete member with 80MPa. Although the mixed fiber(NY+PP) to secure fire resistance performance of high-strength concrete is included up to 0.1%, it does not affect the development characteristics.

Development Length of High-Strength Straight Bars (550MPa) in Nuclear Power Plant Structures (고강도철근(550MPa)의 원전구조물 적용을 위한 직선철근의 정착설계)

  • Lee, Byung Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.110-111
    • /
    • 2018
  • Because of the congestion problems, the high-strength reinforcements are expected to be used in nuclear power plant structures in the near future. According to ACI 349-13, it is permitted to use the high-strength(550MPa) straight bars in design of development length, but there is no special equation for high-strength bars. In order to reflect the anchorage capacity and behavior properties of high-strength straight bars with large-diameter(43 & 57mm), it is necessary to find the modified factor or develop the new development length equation for large-size and high-strength bars.

  • PDF

Simplified Design Equation of Splice Length of Deformed bars in Compression (압축을 받는 이형철근의 단순화된 이음 설계식)

  • Chun, Sung-Chul;Lee, Sung-Ho;Oh, Bo-Hwan
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2010.05a
    • /
    • pp.33-34
    • /
    • 2010
  • A compression lap splice becomes an important issue due to development of ultra-high strength concrete. Based on the basic form of design equations for development lengths of deformed bars and hooks in tension, simplifed design equation of deformed bars in compression was proposed using regression analyses.

  • PDF

Bond Behaviors of Epoxy Coated Reinforcements Using Direct Pull-out Test (직접 인발 시험을 이용한 에폭시 도막 철근의 부착 특성)

  • Kim, Jee-Sang;Lee, Sang-Hyun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.3
    • /
    • pp.298-304
    • /
    • 2017
  • The corrosion of reinforcements embedded in concrete causes some durability problems in reinforced and prestressed concrete structures. The epoxy coated reinforcements are one of the effective and reliable methods to prevent corrosion of reinforcements. However, it has been known that the epoxy coating reduces the bond capacity of reinforcement to concrete. This paper investigates the bond behaviors of epoxy coated reinforcements experimentally using direct pull-out test. Bond behaviors of epoxy coated bars for various reinforcement diameters of 10, 19 and 29mm and thicknesses of cover concrete of 1, 2, 3, and $4.5c/d_b$ (ratio of cover to bar diameter) are examined. Total 66 specimens were manufactured and tested according to the RILEM standard method. As the diameters of the epoxy coated reinforcements increase, the difference of bond strength between epoxy coated reinforcements and uncoated bars also increases. Epoxy coated bars showed more than 85% bond performance compared to those of uncoated bars. A new formular for estimating basic development length of epoxy coated reinforcement based on equilibrium equation is proposed using this experimental result.

Behavior of 550MPa 43mm Hooked Bars Embedded in Beam-Column Joints (보-기둥 접합부에 정착된 550 MPa 43 mm 갈고리철근의 거동)

  • Bae, Min-Seo;Chun, Sung-chul;Kim, Mun-Gil
    • Journal of the Korea Concrete Institute
    • /
    • v.28 no.5
    • /
    • pp.611-620
    • /
    • 2016
  • In the construction of nuclear power plants, only 420 MPa reinforcing bars are allowed and, therefore, so many large-diameter bars are placed, which results in steel congestion. Consequently, re-bar works are difficult and the quality of RC structures may be deteriorated. To solve the steel congestion, 550 MPa bars are necessary. Among many items for verifying structural performance of reinforced concrete with 550 MPa bars, the 43 mm hooked bars are examined in this study. All specimens failed by side-face blowout and the side cover explosively spalled at maximum loads. The bar force was initially transferred to the concrete primarily by bond along a straight portion. At the one third of maximum load, the bond reached a peak capacity and began to decline, while the hook bearing component rose rapidly. At failure, most load was resisted by the hook bearing. For confined specimens with hoops, the average value of test-to-prediction ratios by KCI code is 1.45. The modification factor of confining reinforcement which was not allowed for larger than 35 mm bars can be applied to 43 mm hooked bars. For specimens with 70 MPa concrete, the average value of test-to-prediction ratios by KCI code is 1.0 which is less than the values of the other specimens. The effects of concrete compressive strength should be reduced. An equation to predict anchorage capacity of hooked bars was developed from regression analysis including the effects of compressive strength of concrete, embedment length, side cover thickness, and transverse reinforcement index.

Development Length of High-Strength Standard Hooked Bars (550MPa) in Nuclear Power Plant Structures (고강도철근(550MPa)의 원전구조물 적용을 위한 표준갈고리 정착설계)

  • Lee, Byung Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.99-100
    • /
    • 2018
  • Because of the congestion problems, the high-strength reinforcements are expected to be used in nuclear power plant structures in the near future. According to ACI 349-13, it is permitted to use the high-strength(550MPa) hooked bars in design of development length, but there is no special equation for high-strength bars. In order to reflect the anchorage capacity and behavior properties of high-strength bars with large-diameter(43 & 57mm), it is necessary to develope the new development length equation for large-size and high-strength bars.

  • PDF

Clip-type Binding Implement Effect on Anchorage Behavior of 90-Degree End-Hooked Transverse Reinforcement in Reinforced Concrete Columns (클립형 연결장치로 결속된 90도 갈고리를 갖는 띠철근의 정착거동)

  • Park, Kyoung-Yeon;Yun, Hyun-Do
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.24 no.4
    • /
    • pp.72-80
    • /
    • 2020
  • The purpose of this study is to secure the same or more structural performance and constructability for the details of hooks cross-constructed at 135 degrees used as external-ties standard detail in RC columns, therefore, to the purpose of improving constructability, the clip-type binding implement was suggested and A total of 28 pull-out specimens were prepared with the parameters of concrete compressive strength and clip-embeded length, clip installation location to examine the anchorage behavior of the clip-type binding implement. The experiment was carried out. The results of the experiment confirmed that the anchorage strength of the clip-type binding implement was higher than the details of hooks cross-constructed at 135-degree regardless of the diameter of tie and concrete strength, embeded clip length, clip installation. and The 90-degree end hook with clip-type binding implement was showed a similar an anchorage behavior of 135-degree end-hooked transverse reinforcement, consequently, The 90-degree end hooked with clip-type binding implement is evaluated to be the same anchorage behavior and performance as standard 135-degree end hook detail.

Shear Strength of SFRC Deep Beam with High Strength Headed Reinforcing Tensile Bars (고강도 확대머리 인장철근을 가지는 SFRC 깊은 보의 전단강도)

  • Kim, Young-Rok;Lee, Chang-Yong;Kim, Seung-Hun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.5
    • /
    • pp.111-117
    • /
    • 2019
  • Shear experiments were carried out to evaluate shear performance of SFRC deep beams with end-anchorage of SD600 high strength headed reinforcing tensile bars. The experimental variables include the end-anchorage methods of tensile bars (headed bar, straight bar), the end-anchorage lengths, and the presence of shear reinforcement. Specimens with a shear span ratio of 1 showed a pattern of the shear compression failure with the slope cracks progressed after the initial bending crack occurred. Specimens with end-anchorage of headed bars (H-specimens) showed a larger shear strengths of 5.6% to 22.4% compared to straight bars (NH-specimens). For H-specimens, bearing stress reached 0.9 to 17.2% of the total stress of tensile bars up to 75% of the maximum load, and reached 22.4% to 46%. This shows that the anchorage strength due to the bearing stress of headed bars has a significant effect on shear strength. The experimental shear strength was 2.68 to 4.65 times the theoretical shear strength by the practical method, and the practical method was evaluated as the safety side.

Bond Characteristics of Ultra High Performance Concrete (초고성능 콘크리트(UHPC)의 부착특성에 관한 연구)

  • Kook, Kyung-Hun;Shin, Hyun-Oh;Kwahk, Im-Jong;Yoon, Young-Soo
    • Journal of the Korea Concrete Institute
    • /
    • v.22 no.6
    • /
    • pp.753-760
    • /
    • 2010
  • Ultra high performance concrete (UHPC), is characterized by its high compressive strength and advanced tensile behavior that is much superior to those of conventional concrete. In order to apply this new material in practice, the bond characteristics of UHPC were evaluated in this study. Pull-out tests between UHPC and deformed steel rebar were carried out according to the modified RILEM test method, and were verified by finite element analysis. From the test results showed that UHPC presents 5 to 10 times higher bond strength compared to normal strength concrete, this study suggested remarkably reduced development length and concrete cover comparing to existing specifications. The test results of 700 MPa high strength steel rebar demonstrated the applicability of high strength steel to UHPC. In addition, the transfer length measurements of seven-wire strand in UHPC specimens indicated that the transfer length limit set by the current design code is very conservative for UHPC.