• Title/Summary/Keyword: 철근량 분석

Search Result 160, Processing Time 0.024 seconds

Assessment of Optimum Reinforcement of Rebar for Joint of PHC Pile and Foundation Plate (고강도 콘크리트 말뚝과 기초판 접합부의 최적 철근보강량 산정)

  • Park, Jong-Bae;Sim, Young-Jong;Chun, Young-Soo;Park, Seong-Sik;Park, Yong-Boo
    • Land and Housing Review
    • /
    • v.1 no.1
    • /
    • pp.67-73
    • /
    • 2010
  • Method of protruding steel bar embedded in PHC pile for connecting with foundation plate is an intermediate form of fixed and hinged connection and has often been used in architectural structures such as apartment complex. However, mechanical properties of this method have not been proved and its construction process is not simple. In this study, therefore, by analyzing previous research and by considering ratio of steel bar and concrete in PHC pile, which is minimum reinforcement of rebar, the newly optimized method of reinforcing joint of PHC pile and foundation plate is suggested with respect to PHC pile type (PHC 450, PHC 500, and PHC 600). To assess mechanical properties (ultimate tensile and shear strength) of joint of PHC pile and foundation plate, full scale experimental tests are performed. As a result, all cases are satisfied with required design criteria and can be practically applied. Our results indicate that reduction of rebar reinforcement compared to previous method would lead cost saving in PHC pile construction.

Simplified Analysis of Pile Bent Structures and Minimum Reinforcement Ratio (단일 현장타설말뚝의 간편해석 및 최소 철근비 분석)

  • Kim, Jae-Young;Hwang, Taik-Jean;Jeong, Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.27 no.5
    • /
    • pp.33-43
    • /
    • 2011
  • In this study, simplified analysis (discrete analysis of column and pile) of pile bent structures was performed on the basis of the equivalent base spring model. And the minimum reinforcement ratio in pile bent structures was evaluated by taking into account various factors. To obtain the detailed information, simplified analysis was performed for column-pile interactions and the behavior of a column-pile was estimated and highlighted. Based on this study, it is shown that previous design method based on virtual fixed point theory cannot adequately predict the physical behavior of pile bent structures. It is found that the maximum bending moment is located within craking moment of the pile when material non-linearity is considered. It is also found that the minimum reinforcement ratio (=0.4%) is appropriately applicable for the optimal design of pile bent structure under ultimate lateral loading.

HCP Evaluation Considering Property of Cement Mortar and Steel Corrosion (건조 상태의 시멘트 모르타르 특성과 철근 부식량을 고려한 HCP 평가)

  • Ryu, Hwa-Sung;Yoon, Yong-Sik;Kwon, Seung-Jun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.2
    • /
    • pp.113-120
    • /
    • 2017
  • HCP(Half Cell Potential) method has been widely used since it is recognized as a efficient NDT(Non Destructive Technique) for corrosion detection. This work is for an evaluation of relation between corrosion amount and measured HCP in dried condition through ICM(Impressed Current Method) for accelerating corrosion. For the work, cement mortar specimens with three w/c ratios and four cover depths are prepared, and corrosion test based on ICM is performed for 6 hours, 18 hour, and 42 hours with constant 20V of electrical charge, respectively. From the test, corrosion amount increases with reduced cover depth, increasing w/c ratio, and extended corrosion period, where corrosion amount is evaluated to linearly increases with measured HCP in dried condition. In order to evaluate corrosion amount through measured HCP, the measured HCP level is firstly determined and then corrosion amount is to be compared with measured HCP, which is evaluated to be more reasonable with higher C.O.V.

An evaluation of compressive lap splice of the D22 rebar by concrete strengths (콘크리트 강도변화에 따른 D22mm 철근의 압축이음 성능 평가)

  • Lee, Sung-Ho;Chun, Sung-Chul;Oh, Bo-Hwan
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.1081-1084
    • /
    • 2008
  • Column specimens were constructed with main parameters significantly affecting the strength of the compression lap splice, such as lap length, spacing of lapped bars, amount and location of transverse reinforcements, and concrete strength. An experimental study has been conducted with column specimens in concrete strength of 40 to 60 MPa. Diameters of lapped reinforcing bars are 22 mm. An axial load was monotonically applied to the column specimens. All specimens failed in a brittle sudden manner and cover concrete was blasted out at maximum load. Compression lap splice strengths of specimens were evaluated from strains measured at the beginning of the lap length. Effects of the main parameters on the strengths of compression lap splice are assessed. Similarly to strengths of tension lap slice, the compression splice strength is found to be affected by lap length, spacing of lapped bars, transverse reinforcements.

  • PDF

Steel Design of Continuously Reinforced Concrete Pavement based on the Width of Transverse Crack (횡방향 균열 폭에 기초한 연속철근 콘크리트포장의 철근설계)

  • Kim, Kyeong-Jin;Kim, Dong-Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.1 s.53
    • /
    • pp.106-114
    • /
    • 2009
  • The steel design based on the width of transverse crack which is the major factor to affect a long-term performance of continuously reinforced concrete pavement was developed. For this study, twenty-one cities of Texas were selected and the temperature data was collected at those locations during the past ten years. From the data, zero-stress temperatures were calculated by the PavePro program and the widths of transverse crack were analyzed by the CRCP program. The variables used to this numerical analysis were slab thickness, coefficient of thermal expansion of concrete, steel ratio, and design temperature. The total of 448 factorial runs were made and the regression analysis was performed using the results. Steel ratios from the regression equations were backcalculated and a steel design table was proposed.

Seismic Performance of Hollow Rectangular Precast Segmental Piers (프리캐스트 중공 사각형 철근콘크리트 교각의 내진성능)

  • Lee, Jae-Hoon;Park, Dong-Kyu;Choi, Jin-Ho;Shin, Sung-Jin
    • Journal of the Korea Concrete Institute
    • /
    • v.24 no.6
    • /
    • pp.705-714
    • /
    • 2012
  • Precast reinforced concrete bridge columns with hollow rectangular section were tested under cyclic lateral load with constant axial force to investigate its seismic performance. After all the precast column segments were erected, longitudinal reinforcement was inserted in the sheath prefabricated in the segments, which were then mortar grouted. Main variables of the test series were column aspect ratio, longitudinal reinforcement ratio, amount of lateral reinforcement, and location of segment joints. The aspect ratios were 4.5 and 2.5, and the longitudinal steel ratios were 1.15% and 3.07%. The amount of lateral reinforcement were 95%, 55%, 50%, and 27% of the minimum amount for full ductility design requirements in the Korean Bridge Design Code. The locations of segment joints in plastic hinge region were 0.5 and 1.0 times of the section depth from the bottom column end. The test results of cracking and failure mode, axial-flexural strength, lateral load-displacement relationship, and displacement ductility are presented. Then, safety of the ductility demand based seismic design in the Korean Bridge Design Code is discussed. The column specimens showed larger ductility than expected, because buckling of longitudinal reinforcing bar was prevented due to confinement developed not only by transverse steel but also by sheath and infilling mortar.

Behavior and Improvement of Construction Crack occurred on Anchorage of PSC-edge Girder Rahmen Bridge (PSC-Edge 거더 라멘교의 정착부에 발생한 시공 균열 거동과 개선)

  • Ok, Jae-Ho;Yhim, Sung-Soon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.5
    • /
    • pp.569-576
    • /
    • 2019
  • PSC-Edge Rahmen Bridge makes low thickness and long span by introducing prestressed force to the edge girder and reducing positive moment. In the bridge, diagonal tension cracks occurred in the direction of $45^{\circ}$ to outer side of the girder after the temporary bent supported on the lower part of the upper slab and the secondary strand is tensioned on the girder. Researches on stress distribution and burst crack behavior of pre-stress anchorage has been conducted, it is difficult to analyze an obvious cause due to difference between actual shape and boundary condition. This study performed 3D frame analysis with additional boundary condition of temporary bent, the maximum compression stress occurred in the girder and there was a limit to identify the cause. It performed 3D Solid analysis with LUSAS 16.1 and the maximum principal tensile stress occurred at the boundary between the girder and the slab. As analyzing required reinforcement quantity at obtuse angle of the girder with the maximum principal tensile stress and directional cosine, reinforcement quantity was insufficient. Additional bridges have increased reinforcement quantity and extended area and crack was not occurred. It is expected that cracks on the girder during construction could be controlled by applying the proposed method to PSC-Edge Rahmen Bridge.

Evaluation of Cross-Sectional Damage for RC Column Subjected to Axial Loading and Steel Corrosion (철근 부식과 축방향 하중을 받는 철근-콘크리트 기둥 단면의 손상 평가)

  • Changyoung Kim;Ki Yong Ann
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.11 no.4
    • /
    • pp.476-483
    • /
    • 2023
  • The present study concerns modelling the structural behaviour for concrete structure into the crack initiation at corrosion of steels. The degradation source included the axial load and steel corrosion. A development of the rust formed on the steel surface was considered with the interfacial gap between steel and concrete. As a result, the tensile damage could occur on the surface of concrete into the cracking with no steel corrosion, which could be further developed by the increasing rust formation, while the cracking at the steel-concrete interface was mainly attributed to the compressive deformation, being restricted within the interfacial zone.

Structure Behavior Evaluation of Beams composited with Steel and Reinforced Concrete (철근콘크리트와 강을 합성한 복합 단면보의 구조거동평가)

  • Kim, In Seok;Kim, Hak Soo
    • Journal of Korean Society of Steel Construction
    • /
    • v.20 no.5
    • /
    • pp.665-673
    • /
    • 2008
  • The composite structures of steel and reinforced concrete, which have been widely used in large-scale concrete structures, werestudied to investigate the cause of unexpected cracks and to verify the composite actions between the two materials. Vertical stiffeners between flanges, studs and dowel bars, stirrups, and concrete strength were chosen as experimental variables in afour-point loading test. The results showed that the vertical stiffener prevented not only the local web buckling, but also bond failures between steel and concrete. It increased the flexural resistance (fracture loads) due to the composite action of two materials, compared withthose of any experimental variable. However, the composite behavior of steel reinforced concrete beam was not affected seriously by additional studs, dowel bars, stirrups, and concrete strength.

Axial Stress Evaluation of Bundle Nails in Smart Construction (스마트 건설기반 번들네일의 축응력 평가)

  • Donghyuk Lee;Jaekoo Ryu
    • Journal of the Korean GEO-environmental Society
    • /
    • v.25 no.6
    • /
    • pp.13-17
    • /
    • 2024
  • The general soil nailing method, which is currently used domestically and internationally to stabilize the slopes of sandy slopes, is to form a kind of gravity-type retaining wall by drilling the ground and grouting it with a single steel bar. This method can reduce construction costs, ease of construction, relative strength and displacement, and is highly efficient. The difference between grouting and rebar adhesion to the yield pullout force and the difference between the amount of deformation in relation to the same pullout resistance was analyzed through field tests to identify engineering excellence, and in terms of construction cost, the reduction effect was evaluated by analyzing the difference in the number of drillings and the impact on the overall construction cost, such as material cost, when the same strength constant is applied to the ground with the same resistance.