• Title/Summary/Keyword: 책임분계점

Search Result 1, Processing Time 0.017 seconds

A Study of Construction method of installing High-Voltage Lead-in (특고압 인입공사 시공방법연구)

  • Oh, Sung-Chul;Park, Soo-Hong
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.6 no.1
    • /
    • pp.129-134
    • /
    • 2011
  • The construction method in electrical room with hydro power generation is well informed in drawings and according to this method, to master the actual working conditions. It's necessary to consult location of KEPCO liability threshold with the KEPCO side, therefore make a decision to install the underground cable in hydro power station in each state, including outdoor pipes and manholes. Undulating rigid polyethylene conduit (125C) and CNCV-W extra high cable are laid and installed, to make a closely analysis to the construction by reviewing its process. In this work, the key part of the KEPCO power system for House of Commons is actually based on liability threshold, even including outdoors pipeline construction, high voltage underground electrical wiring and switchgear installation. It directly reveals the contents of the proposed construction methods about Housing Corporation and the High Voltage Switchgear Installation Inlet.