A Study of Construction method of installing High-Voltage Lead-in

특고압 인입공사 시공방법연구

  • 오승철 (동서대학교 메카트로닉스공학과) ;
  • 박수홍 (동서대학교 메카트로닉스공학과)
  • Received : 2010.12.13
  • Accepted : 2011.02.09
  • Published : 2011.02.28

Abstract

The construction method in electrical room with hydro power generation is well informed in drawings and according to this method, to master the actual working conditions. It's necessary to consult location of KEPCO liability threshold with the KEPCO side, therefore make a decision to install the underground cable in hydro power station in each state, including outdoor pipes and manholes. Undulating rigid polyethylene conduit (125C) and CNCV-W extra high cable are laid and installed, to make a closely analysis to the construction by reviewing its process. In this work, the key part of the KEPCO power system for House of Commons is actually based on liability threshold, even including outdoors pipeline construction, high voltage underground electrical wiring and switchgear installation. It directly reveals the contents of the proposed construction methods about Housing Corporation and the High Voltage Switchgear Installation Inlet.

일상생활에 필요한 전력공급을 제공받기 위해서는 한전 책임분기점 전주에서 전기실 수변전설비까지 시공방법을 설계도면을 숙지하고 현장작업 조건을 충분히 파악하여 한전 한전책임분계점 위치를 한전측과 협의하여 결정하고 전주에 책임분계점(수전점)의 지중케이블 입상주을 설치하고 옥외관로터파기 및 맨홀을 설치하며 파상형경질폴리에틸렌 전선관(125C) 및 CNCV-W특고케이블을 포설하고 전기실 수배전반설치까지의 공사과정을 면밀히 분석 검토하여 시공한다. 공동주택 전력계통의 핵심적인 부분인 한전 책임분계점에서 부터 옥외관로공사, 특고압지중전선로 및 수배전반설치까지 실제 현장에서 직접 시공한 내용을 기초로 하여 공동주택의 특고압인입공사 및 수배전반 설치에 대한 시공방법의 내용을 제시 하였다.

Keywords

References

  1. 한국전기공사협회, 기술핸드북, pp.35-36, 2010.
  2. 한국토지주택공사, 양산평산아파트 전기공사 1공구 공사시방서 (60620 수배전반), 2010.
  3. 가온전선, http://www.gaoncable.com
  4. 진해시 시립중앙도서관이전리모델링공사 전기시방서, pp. 8-9, 2010.