• Title/Summary/Keyword: 진출입로 구간

Search Result 23, Processing Time 0.026 seconds

Determination of Not-Permitted Entrance/Exit Section at Curb Areas (단지 내 진출입 불허구간의 적정길이 산정에 관한 연구)

  • Kwon, Sung-Dae;Park, Je-Jin;Ha, Tae-Jun;Ha, Dong-Ik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4D
    • /
    • pp.369-376
    • /
    • 2010
  • At present, many problems in traffic operation and safety occurs since there is no clear design criteria on designating the not-permitted entrance/exit section at curb areas within complex areas. Even, there is no specific and detailed researches on the not-permitted entrance/exit section by now. This research calculated the proper length of the entrance/exit section at curb areas by dividing the access not-permitted section into the two sections. First, the calculation of the entrance section was done by considering the location of crosswalks, stop line clearance, the queue length of vehicles approaching to second lanes, and marginal distance for safety have been considered. Second, the calculation of the exit section was done by comparing and analyzing the distance between cars of the entrance section according to the investigation point and the distance considering the location of crosswalks, the behavior of exit vehicles and the length of vehicles. In conclusion, by presenting the proper length in consideration of the traffic operation and safety on the access not-permitted section within complex areas, it can be used as a traffic safety improvement alternative and will be contributed in establishing and operating the proper installation criteria for the access not-permitted section within complex areas.

Analysis on Entry and Exit Behaviors at the Weaving Section of a Continuous Auxiliary Lane: Focused on Clover-shaped Interchanges (연속 부가차로 엇갈림 구간 진출입 행태분석에 관한 연구: 클로버형 입체교차로를 중심으로)

  • Park, Je-Jin;Ha, Tae-Jun;Oh, Jae-Chul;Choi, Heung-Seob
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.6
    • /
    • pp.79-89
    • /
    • 2017
  • Current intersection with collectors allow entry and exit in the relevant sections just as defined by the pertinent design criteria without considering driving behavior of the vehicles coming in and out of the intersection. This study analyzed the roads in the weaving sections to review driving behavior. As a result, vehicles entering a main line are found to try to change a driving lane at a section 50~55m away from a nose part, while those entering a ramp from a main line try to change it at 35~40m from a nose part. Accordingly vehicles exiting to a connecting road from a main line were found to take prior action to change a lane earlier than those entering a main line. Conflict took place intensively at 35~40m section from the nose part entering a main line. Consequently, such conflict at an weaving section may be controlled by adjusting the length of driving lane making use of a double line (solid and dotted line) that can control changing a lane. Outcome of this study may be used as a basic data for operating and maintaining an weaving section of a intersection of a road and improving traffic safety.

Improvement of Access Control at Partially Grade-Separated Intersection (단순입체교차 도로의 진출입로 설치 금지구간 개선방안)

  • Kim, Young-Jin;Kim, Jin-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.725-733
    • /
    • 2018
  • With urbanization projects involving trunk roads progressing, many simple interchanges, which separate passing traffic into the main traffic and access subtraffic, are being constructed to maximize the traffic capacity. Under the current Road Connection Rule, the access-prohibited section in an interchange is determined based on the access lane and limit distance in the complete interchange road, but separate criteria for the simple interchange are not defined. This may cause confusion in the Road Management Office's determination of the access-prohibited section in the simple interchange, or lead to the application of the criteria for the access-prohibited section in the complete interchange without considering the features of such interchange. This study conducted a comparative analysis of the domestic and overseas systems related to the installation of access section in trunk roads, such as general national roads. This paper presents a survey of the methods for applying the access-prohibited section in the interchange along with the actual cases and proposes improvement measures for a rational calculation of the access prohibited installation section in the simple interchange to minimize the downsides associated with the application of the extremely strict criteria. The proposed road connection rule improvement measures based on the consideration of the purpose of installing the simple interchange and on the consideration the features of the simple interchange are expected to prevent administration confusion by the field road management offices as well as the waste of unnecessary efforts and costs by petitioners so they can boost the service satisfaction for people and the administrative reliability.

Determination of Weaving Section at Highway Collector-Distrivutor (집산로가 설치된 고속도로 위빙구간 유출입부 설계기준 제시)

  • Oh, Jaechul;Kim, Yoon Mi;Lee, Hyung Mu;Ha, Tae Jun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.6
    • /
    • pp.879-885
    • /
    • 2018
  • The highway weaving section is a point where there is a conflict caused by entry and exit vehicles. In order to minimize the impact on the main line, an accumulation line should be installed. The design speed of the collecting part is 50 km/h, but the actual driver does not have proper deceleration according to the design speed. In this study, considering the driving behaviors, the design specification, and the driver 's viewing angle, the appropriate separation distance for safe entry and exit of collecting, connecting, and collecting roads was examined. As a result of the analysis, it is found that a distance of 60m is required from the point where the merging starts. The results of this study are expected to contribute to the improvement of driver safety due to the conflict between entry and exit vehicles when applied to the weaving section where collecting roads are installed.

A Study on the Highway Ramp Section for Simulation of Commercial Vehicle ESC Assesment (상용 ESC 평가 시뮬레이션을 위한 국내 고속도로 진출입로 연구)

  • Lee, Hongguk;Park, Joongyoung;Chang, Kyungjin;Suh, Leejung;Yoo, Songmin
    • Journal of Auto-vehicle Safety Association
    • /
    • v.6 no.2
    • /
    • pp.23-28
    • /
    • 2014
  • Commercial vehicle ESC assessment for curvature road was conducted. The previous study of ESC activation condition for losing controllability utilizing the test protocols of double lane change and sine with dwell method was conducted without considering the geometric complexity of roadway design. Since critical rollover accidents were frequently observed in the exit ramp zone, variety of curve, slope and bank have been added for analysis conditions. Detailed feature of the ramp including location, dimension and design characteristics have been analyzed from the typical trumpet type ramp design. Analyzing accident data from 2008, two specific ramps have been selected due to their complexity in design and severity in steering operation.

A Study on Improvement of Emergency Evacuation Facilities in Dorim-Cheon Basin (홍수기 도림천 유역 진출입차단 시설 및 대피시설 운영방안)

  • Kim, Min Seok;Yoon, Sun Kwon;Choi, Hyeon Seok
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.461-461
    • /
    • 2021
  • 도림천 유역은 4개 자치구(관악, 구로, 동작, 영등포)에서 관리하고 있으며, 강우 발생 시 침수취약지역 맞춤형 행동 매뉴얼을 통해 운영된다. 그러나 여름철 집중강우 발생 시에는 도달시간이 짧고 수위가 급격히 상승하는 유역의 특성으로 하천 내 고립사고가 빈번히 발생하고 있다. 최근 10년('11년~'20년)간의 조사결과에 따르면 도림천 중·하류 구간에서 발생한 고립사고는 총 27회로 나타났다. 본 연구에서는 도림천 유역을 대상으로 도시홍수 예·경보 전달시설, 진입차단 시설, 그리고 고립 시 대피시설의 설치현황을 살펴보고 도시하천에 적합한 재난대피시설 운영 및 설치방안을 제안하고자 한다. 이는 짧은 시간에 수위가 급변하는 도시하천의 고립사고 최소화와 더불어 신속하고 안전한 하천시설운영 및 자치구 통합 맞춤형 행동 매뉴얼 개선에 기여하고자 한다.

  • PDF

Assessment of Running Speed of Large Logging Trucks on the Forest Road Structure (임도 구조에 따른 대형 목재운송차량의 주행속도 분석)

  • Hwang, Jin-seong;Lee, Kwan-hee;Ji, Byoung-yun
    • Journal of Korean Society of Forest Science
    • /
    • v.110 no.4
    • /
    • pp.622-629
    • /
    • 2021
  • This study analyzed the running speed of logging trucks (25 tons), depending on the structural state of forest roads, on four main forest roads in the national forest management offices in Chuncheon and Hongcheon for trafficability. The speeds for the curved and straight sections were 7.6 km/h and 8.7 km/h, respectively, which were less than the designed speed (20 km/h). Thus, it would be necessary to improve the forest road's structure to fulfill minimum running speed. No significant difference was observed in the running speed by the longitudinal gradient up to 13%, while it was increased at more than 100 m by the distance in the straight section. By the facility's location in the curved section, the running speed was 6.2%-9.3% lower in a ridge than a valley. The running speed was lowest at the internal angles of <90° and at the curved radius of <15 m, respectively. When this radius was less than 15 m, the substandard sections for widening amounts were more than 50%; thus, sufficient widening was not achieved.

The Development of Estimation Technique of Freeway Origin-Destination Demand Using a Real Traffic Data of FTMS (교통관리시스템의 실시간 교통자료를 이용한 고속도로 동적OD 추정기법의 개발)

  • Kim, Ju-Young;Lee, Seung-Jae
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.4 s.82
    • /
    • pp.57-69
    • /
    • 2005
  • The goal of this paper is to develop freeway Origin-Destination (OD) demand estimation model using real-time traffic data collected from Freeway Traffic Management System (FTMS). In existing research, the micro-simulation models had been used to get a link distribution proportion by time process. Because of hi-level problem between the traffic flow model and the optimal OD solution algorithm, it is difficult for the existing models to be loaded at FTMS. The formulation of methodology proposed in this paper includes traffic flow technique to be able to remove the bi-level problem and optimal solution algorithm using a genetic algorithm. The proposed methodology is evaluated by using the real-time data of SOHAEAN freeway, South Korea.

Evaluation of Freeway Congestion Management Using Mesoscopic Traffic Simulator (Mesoscopic Traffic Simulator를 이용한 고속도로 지정체 관리방안평가)

  • 최기주;정연식;이승환
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2001.05a
    • /
    • pp.113-118
    • /
    • 2001
  • 교통혼잡의 묘사를 보다 구체적으로 하기 위한 Mesoscopic시뮬레이션 모형으로서 INTEGRATION을 소개한다. 모형의 기본구조가 설명되고, 특히 응용사례로서 경부고속도로 축을 중심으로 한 주거지역의 급속한 팽창으로 야기된 고속도로상의 교통대안을 평가하려는데 초점을 맞추고 있다. 교통대안은 혼잡을 완화시키는데 타당하고 기술적으로도 실현가능한 대안이 제시된다. 이러한 대안들은 거시 및 미시 모의실험모형을 통해 면밀히 분석 평가되며 또한 대안을 도출하고 평가하는 과정의 제시로서 교통량조사에 근거한 OD 도출, Subarea 네트워크 분석 및 통합된 네트워크 모의실험과 같은 새로운 기법들이 아울러 제시된다. 대안의 대부분은 네트워크 개선에 관련한 것이다. 반포 IC 진출입로 공사(Al), 위빙 제거를 기초로 한 서초 IC TSM(A2), 서초-양재 구간의 고속 저속 분리(A3), 헌릉 IC(A4)의 신설, 판교 JC 개선(A5), 백현 IC(A6)신설. 가장 자본 집약적인 대안은 A4, A6순이다. A1, A5, A6은 구간은 짧으나, 자본 집약적이며 어느 정도의 공사 기간이 소요된다. 가장 비용이 적게 소요되는 대안은 A2, A3이다. A2는 시행이 용이하나, A3의 경우 공사기간 중 교통분산 대책이 필요하다. A1, A6은 속도증가와 통행시간 절감의 측면에서 가장 비용대비 효율적인 것으로 분석되었다. 시뮬레이션의 한계 및 개선방안이 함께 검토되었다.

  • PDF

Early-Age Performance of Intersection Pavement Constructed Using Precast Concrete Panels (프리캐스트 패널을 이용한 교차로 구간 도로 포장 초기 공용성 분석)

  • Oh, Han-Jin;Hwang, Ju-Hwan;Kim, Seong-Min;Rhee, Suk-Keun;Park, Sung-Ki
    • International Journal of Highway Engineering
    • /
    • v.13 no.2
    • /
    • pp.115-123
    • /
    • 2011
  • This study was conducted to investigate the early-age behavior and performance of precast pavements constructed by replacing existing asphalt pavements for an intersection in urban bus only lanes. The monitoring items included level differences between asphalt pavement and precast panels at the beginning and ending locations of the precast pavement, level differences and joint widths between precast panels, precast panel settlement, and skid resistance of the panel surface. At a certain time after the construction, the diamond grinding method was applied and its effect was also investigated. The monitoring results showed that as time went by, the panel level, joint width, settlement, and skid resistance were not much varied. That implied the stable sustaining of external loads by the precast pavements. In addition, it was verified that employing diamond grinding could reduce the level differences between precast panels.