Early-Age Performance of Intersection Pavement Constructed Using Precast Concrete Panels |
Oh, Han-Jin
(경희대학교 토목공학과)
Hwang, Ju-Hwan (경희대학교 토목공학과, (주)동성엔지니어링) Kim, Seong-Min (경희대학교 공과대학 토목공학과) Rhee, Suk-Keun (경희대학교 공과대학 토목공학과) Park, Sung-Ki ((주)승화명품건설) |
1 | Kumakura, M., Kondo, S., Kai, K., Abe, Y., and Sato, R. (1994). "Development of a prestressing method for joints of precast prestressed concrete pavement slabs," International Symposium on Concrete Roads, Vienna, pp. 83-88. |
2 | Merritt, D. K., McCullough, B. F., Burns, N. H., and Schindler, A. K. (2000). "The feasibility of using precast concrete panels to expedite highway pavement construction," Report 1517-1, Center for Transportation Research, The University of Texas at Austin, 168 pp. |
3 | Merritt, D. K., McCullough, B. F., Burns, N. H., and Schindler, A. K. (2001). "Feasibility of precast prestressed concrete panels for expediting PCC pavement construction," Report 1517-S, Center for Transportation Research, The University of Texas at Austin, 4 pp. |
4 | Meyer, A. H. and McCullough, B. F. (1983). "Precast repair of CRC Pavements," Journal of Transportation Engineering, Vol. 109, No. 5, ASCE, pp. 615-631. DOI ScienceOn |
5 | 정종덕, 류성우, 한승환, 조윤호 (2006). "기존 콘크리트 포장의 성능 향상을 위한 다이아몬드 그라인딩 공법의 초기 공용성 평가", 한국도로학회논문집, 한국도로학회, Vol. 8, No. 3, pp. 77-88. |
6 | 조영교, 김성민, 양성철, 박원주 (2010). "조립식 포장 공법의 특수 요소기술 개발", 봄 학술대회 논문집, 한국도로학회, pp. 229- 234. |
7 | Bull, J. W. (1991). "Precast concrete raft units," Van Nostrand Reinhold, New York, NY, 193 pp. |
8 | Elkins, G. E., McCullough, B. F., and Hudson, R. W. (1979). "Precast repair of continuously reinforced concrete pavement," Report 177-15, Center for Transportation Research, The University of Texas at Austin, 90 pp. |
9 | Hargett, E. R. (1970). "Prestressed concrete panels for pavement construction," PCI Journal, Precast/Prestressed Concrete Institute, pp. 43-49. |